Waste
Section 15 – Hazardous waste facilities
34.Section 15 specifies that the construction of a hazardous waste facility is a Significant Infrastructure Project if:
the facility is in Wales or the Welsh marine area,
the main purpose of the facility is the final disposal or recovery of hazardous waste, and
the facility is expected to have the capacity specified in subsection (2).
35.The section also specifies that the alteration of a hazardous waste facility is a Significant Infrastructure Project if:
the facility is in Wales or the Welsh marine area,
the main purpose of the facility is the final disposal or recovery of hazardous waste, and
the alteration is expected to increase the capacity of the facility as specified in subsection (3)(c).
Section 16 – Radioactive waste geological disposal facilities
36.Section 16 specifies that development relating to a radioactive waste geological disposal facility is a Significant Infrastructure Project where it is:
the construction of one or more boreholes in Wales or the Welsh marine area to a depth of at least 150 metres beneath the surface of the ground or seabed, and their main purpose is to obtain data or samples to determine the suitability of the site for a radioactive waste geological disposal facility.
the construction of a radioactive waste geological disposal facility in Wales or the Welsh marine area.