xmlns:atom="http://www.w3.org/2005/Atom"

SCHEDULE 3Sampling and analysis

PART 1General

Samples: general

1.—(1) The local authority must ensure that each sample is—

(d)taken by a competent person using suitable equipment;

(e)representative of the water at the sampling point at the time of sampling;

(f)not contaminated in the course of being taken;

(g)kept at such temperature and in such conditions as will secure that there is no material change in what is to be measured; and

(h)analysed without delay by a competent person using suitable equipment.

(2) It must ensure that the sample is analysed using a system of analytical quality control.

(3) The system must be subjected to checking by a person who is—

(a)not under the control of either the analyst or the local authority; and

(b)approved by the Welsh Ministers for that purpose.