SCHEDULES

SCHEDULE 6FOR PROTECTION OF NETWORK RAIL

Fencing

9.  Where so required by the engineer the undertaker must, to the reasonable satisfaction of the engineer, fence off the relevant works, or take such other steps as the engineer may require to be taken for the purpose of separating the relevant works from railway property, whether on a temporary or permanent basis or both.