Introductory Text
1.The new highways which the National Assembly proposes to construct...
2.The centre lines of the new trunk roads are indicated...
3.The National Assembly directs as respects any part of a...
4.The lengths of trunk road described in Schedule 4 to...
5.The National Assembly is authorised to construct the bridge specified...
6.In this Order: (1) All measurements of distance are measured...
7.This Order shall come into force on the 8th of...
Signature
SCHEDULE I
ROUTE OF THE MAIN NEW TRUNK ROAD
SCHEDULE 2
ROUTES OF THE SLIP ROADS
SCHEDULE 3
ROUTE OF THE NEW CONNECTING TRUNK ROADS
SCHEDULE 4
SCHEDULE 5
PLANS AND SPECIFICATIONS OF THE PROPOSED ROAD BRIDGE OVER THE MONMOUTHSHIRE AND BRECON CANAL IN THE COUNTY BOROUGH OF MONMOUTHSHIRE
SPECIFICATION
Points of Commencement and Termination on Layout Plan
Span
Waterway
Headway