Conditions on exemptions4
The exemption granted by article 3(a) of this Order is subject to compliance with the following conditions—
a
Blackcraig Wind Farm is connected to the total system;
b
Blackcraig Wind Farm does not export more than 100 megawatts of electrical power to the total system, except in circumstances outside the reasonable control of Blackcraig Wind Farm (Scotland) Limited; and
c
Blackcraig Wind Farm (Scotland) Limited is not a licensed generator in respect of Blackcraig Wind Farm.