I1SCHEDULE 1AUTHORISED DEVELOPMENT

Annotations:
Commencement Information
I1

Sch. 1 in force at 25.10.2019, see art. 1

I1

Work No. 6 – above ground gas installation including—

a

Work No. 6A—

i

above ground installation (also referred to as a minimum offtake connection compound) containing a minimum offtake connection comprising remotely operable valves, control and instrumentation kiosks, pipework and electrical supply kiosks;

ii

security infrastructure, including cameras, lighting (including perimeter lighting columns), stock proof fencing and perimeter fencing;

iii

ground raising and ground preparation works;

iv

site drainage including new outfall to Dickon Field Drain, new culvert and waste management infrastructure;

v

electricity and telecommunications connections and other services;

vi

underground gas pipeline connecting to Work No. 6B;

vii

creation of a permanent access from Rusholme Lane including permanent road surface and kerb stones, signing and road markings works, car parking, drainage, fencing and other incidental works;

viii

creation of a permanent access from the access in Work No.6A (vii) into the field to the south of Dickon Field Drain including permanent road surface and kerb stones, signing and road markings works, drainage, fencing and other incidental works;

ix

creation of a culvert on Dickon Field Drain; and

x

hard and soft landscaping including tree planting, ecological mitigation, temporary and permanent fencing and other boundary treatments.

b

Work No. 6B—

i

above ground installation containing a pipeline inspection gauge (PIG) facility, comprising a PIG launching facility, emergency control valves, isolation valves, control and instrumentation kiosks, pipework and electricity supply kiosks;

ii

security infrastructure, including cameras, lighting (including perimeter lighting columns), car parking, stock proof fencing and perimeter fencing;

iii

ground raising and ground preparation works;

iv

site drainage and waste management infrastructure;

v

electricity and telecommunications connections and other services;

vi

below ground sacrificial anode pit; and

vii

hard and soft landscaping including tree planting, ecological mitigation, temporary and permanent fencing and other boundary treatments.

c

Work No. 6C – (in connection with Work No. 6A) temporary construction laydown area.

d

Work No. 6D – (in connection with Work No. 6B) temporary construction laydown area and creation of up to two construction access routes from Rusholme Lane.