The Triton Knoll Offshore Wind Farm (Amendment) Order 2018

What Version

 Help about what version
  • Latest available (Revised)
  • Original (As made)

Opening Options

 Help about opening options

Status:

This is the original version (as it was originally made). This item of legislation is currently only available in its original format.

Citation and commencement

1.  This Order may be cited as the Triton Knoll Offshore Wind Farm (Amendment) Order 2018 and comes into force on 6th August 2018.

Amendment to the Triton Knoll Offshore Wind Farm Order 2013

2.  The Triton Knoll Offshore Wind Farm Order 2013 is amended in accordance with this Order.

Amendments to article 2 (Interpretation)

3.—(1) Article 2 is amended as follows.

(2) Omit the definitions for the following—

(a)“combined substation”;

(b)“HVDC substation”;

(c)“large HVDC substation”;

(d)“meteorological station”; and

(e)“offshore substation”.

(3) In the definition of “collector substation”, omit the words “(either singly or as part of a combined substation)”.

(4) In the definition of “maintain”, for “wind turbine generator, collector substation, meteorological station or HVDC substation” substitute “wind turbine generator or collector substation”.

(5) In the definition of “scheduled works”, omit the words “and 2”.

Amendments to article 7 (Abatement of works abandoned or decayed)

4.  In article 7, for “Work Nos. 1 and 2” in each place, substitute “Work No.1”.

Amendments to Part 1 (Authorised Development) of Schedule 1 (Authorised Project)

5.—(1) Part 1 (Authorised Development) of Schedule 1 (Authorised Project) is amended as follows.

(2) In the first paragraph of the description of Work No. 1, for “1200 MW” substitute “900 MW”.

(3) In the first paragraph of the description of Work No. 1, for “288 wind turbine generators” substitute “90 wind turbine generators”.

(4) In paragraph (a) of the description of Work No. 1, for “4 collector substations” substitute “2 collector substations”.

(5) Omit paragraph (b) of the description of Work No. 1.

(6) in paragraph (c) of the description of Work No. 1, for “, the meteorological stations, any collector substation, and Work No.2,” substitute “and any collector substation”.

(7) After paragraph (c) of the description of Work No. 1, omit the words—

(a)“and associated development within the meaning of section 115(2) of the 2008 Act comprising—”; and

(b)Work No. 2 — up to 4 HVDC substations or up to 2 large HVDC substations fixed to the seabed by gravity, jacket or monopole foundations within the Order limits;”.

(8) In the final paragraph, for “Work Nos. 1 and 2” substitute “Work No. 1”.

(9) In the final paragraph omit the word “further”.

Amendments to Part 3 (Requirements) of Schedule 1 (Authorised Project)

6.—(1) Part 3 (Requirements) of Schedule 1 (Authorised Project) is amended as follows.

(2) In paragraph 4, for “, HVDC substation, large HVDC substation, collector substation, combined substation or meteorological station” substitute “or collector substation”.

(3) Omit paragraphs 5(1), 5(3), 5(4), 5(5), 5(7) and 5(8).

(4) In paragraph 5(6), for “offshore substation, combined substation or large HVDC substation” substitute “collector substation”.

(5) In paragraph 7(1)(a) omit the words “7 metres for use with meteorological stations and for use in all other instances a diameter of more than”.

(6) In paragraph 7(1)(b) omit the words “8.5 metres for use with meteorological stations and for use in all other instances of diameter of more than”.

(7) In paragraph 7(2)(a) omit the words “for use with large HVDC substations or combined substations a length at the level of the seabed of more than 100 metres, a width of 15 metres or a height of more than 15 metres; or for use in all other instances,”.

(8) In paragraph 7(3), for paragraph (d) substitute—

(d)for use with collector substations more than 8 legs;.

(9) In paragraph 20(3), in the definition of “Wind farm structure”, omit the words “HVDC substation,” “combined substation”, and “meteorological station”.

Signed by authority of the Secretary of State for Business, Energy and Industrial Strategy

Gareth Leigh

Head of Energy Infrastructure Planning

Department for Business, Energy and Industrial Strategy

3rd August 2018

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made):The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources