Amendments to Part 3 (Requirements) of Schedule 1 (Authorised Project)

6.—(1) Part 3 (Requirements) of Schedule 1 (Authorised Project) is amended as follows.

(2) In paragraph 4, for “, HVDC substation, large HVDC substation, collector substation, combined substation or meteorological station” substitute “or collector substation”.

(3) Omit paragraphs 5(1), 5(3), 5(4), 5(5), 5(7) and 5(8).

(4) In paragraph 5(6), for “offshore substation, combined substation or large HVDC substation” substitute “collector substation”.

(5) In paragraph 7(1)(a) omit the words “7 metres for use with meteorological stations and for use in all other instances a diameter of more than”.

(6) In paragraph 7(1)(b) omit the words “8.5 metres for use with meteorological stations and for use in all other instances of diameter of more than”.

(7) In paragraph 7(2)(a) omit the words “for use with large HVDC substations or combined substations a length at the level of the seabed of more than 100 metres, a width of 15 metres or a height of more than 15 metres; or for use in all other instances,”.

(8) In paragraph 7(3), for paragraph (d) substitute—

(d)for use with collector substations more than 8 legs;.

(9) In paragraph 20(3), in the definition of “Wind farm structure”, omit the words “HVDC substation,” “combined substation”, and “meteorological station”.