The Wireless Telegraphy (Licence Award) Regulations 2018

Determination of the winning 2.3 GHz assignment stage bids

75.—(1) OFCOM shall determine the winning 2.3 GHz assignment stage bids in accordance with this regulation after the deadline for paying the required assignment stage deposit under regulation 89.

(2) The winning 2.3 GHz assignment stage bids shall be those valid 2.3 GHz assignment stage bids that comprise the winning combination of valid 2.3 GHz assignment stage bids.

(3) The winning combination of valid 2.3 GHz assignment stage bids shall be the valid combination of 2.3 GHz assignment stage bids having the highest total value of amounts bid.

(4) A combination of valid 2.3 GHz assignment stage bids is a valid combination of 2.3 GHz assignment stage bids if—

(a)within that combination there is one valid 2.3 GHz assignment stage bid from each winning bidder for 2.3 GHz lots;

(b)each of those valid 2.3 GHz assignment stage bids is for a 2.3 GHz assignment stage option as determined by OFCOM for the bidder;

(c)no numbered 2.3 GHz lot is included in more than one of the 2.3 GHz assignment stage bids included in the combination of valid 2.3 GHz assignment stage bids; and

(d)the numbered 2.3 GHz lots not included in that combination of valid 2.3 GHz assignment stage bids, taken together, form a single block of numbered 2.3 GHz lots.

(5) Where there is more than one valid combination of 2.3 GHz assignment stage bids for which the total value is equal highest, OFCOM shall employ a method of random selection from amongst those valid combinations of 2.3 GHz assignment stage bids for which the value is equal highest to determine the winning combination of valid 2.3 GHz assignment stage bids.