Search Legislation

The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2018

 Help about what version

What Version

  • Latest available (Revised)
  • Original (As made)

Status:

This is the original version (as it was originally made). This item of legislation is currently only available in its original format.

Statutory Instruments

2018 No. 413

Infrastructure Planning

The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2018

Made

23rd March 2018

Coming into force

24th March 2018

An application has been made under paragraph 2 of Schedule 6 to the Planning Act 2008(1) to the Secretary of State in accordance with the Infrastructure Planning (Changes to, and Revocation of, Development Consent Orders) Regulations 2011(2) for a non-material change to the Hinkley Point C (Nuclear Generating Station) Order 2013(3).

The Secretary of State, having considered the application and the responses to the publicity and consultation carried out in accordance with regulations 6 and 7 of the Infrastructure Planning (Changes to, and Revocation of, Development Consent Orders) Regulations 2011, has decided to make this Order amending the Hinkley Point C (Nuclear Generating Station) Order 2013.

The Secretary of State, in exercise of the powers conferred by paragraph 2 of Schedule 6 of the Planning Act 2008, makes the following Order:

Citation and commencement

1.  This Order may be cited as The Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2018 and shall come into force on 24th March 2018.

Amendment of The Hinkley Point C (Nuclear Generating Station) Order 2013

2.  The Hinkley Point C (Nuclear Generating Station) Order 2013 (“the Order”) is amended as follows.

Amendment to Part 1 (Authorised development) of Schedule 1 (Authorised project)

3.—(1) In Part 1 of Schedule 1 to the Order the description of Work No. 1A is amended as follows:

(2) In paragraph (d)(i)—

(a)after “Effluent Tanks” insert “and Refuelling Water Storage Tank”;

(b)after “Battery Load Bank;” insert “and”;

(c)after “Cooling Water Discharge Weir (Buildings)” omit “and Refuelling Water Storage Tank;”.

(3) In paragraph (h)—

(a)after “Service Access Buildings;” omit “and”;

(b)in the list below “Service Access Buildings;”, insert “Underground Tunnel High Points;”; and

(c)in the list, below “Services Ventilation Building;” insert—

Back Up Containerised Generators; and

Valve Room for Demineralisation Station.

Amendment to Part 2 (Temporary jetty works) of Schedule 1 (Authorised project)

4.—(1) Part 2 of Schedule 1 to the Order is amended as follows.

(2) In the description of Work No. TJ1 after “elevated roadway” insert “and drainage infrastructure (including pipework and outfalls)”.

Amendment to Part 3 (Approved plans) of Schedule 1 (Authorised project)

5.—(1) Part 3 of Schedule 1 to the Order is amended as follows.

(2) For the tables and headings listed under the heading “HPC Development Site”, up to the heading “HPC accommodation campus”, substitute the list in the Schedule to this Order.

Amendment to Schedule 2 (Requirements)

6.—(1) Schedule 2 to the Order is amended as follows.

(2) In the table at paragraph 2—

(a)In sub-paragraph (2) of requirement PW3, for “(Rev 02)” substitute “(Rev 03)”;

(3) In the table at paragraph 3—

(a)In sub-paragraph (2) of requirement P10, after “Environmental Statement” insert “and may include pipework attaching to the temporary jetty leading to an outfall at the temporary jetty head,” and after “and shall” include “(except in relation to discharge from the temporary jetty head)”;

(4) In the table at paragraph 4—

(a)In sub-paragraph (3) of requirement MS4, for “and 1C” substitute “, 1C and TJ1”;

(b)After requirement MS17 insert new row—

MS18Back Up Containerised Generators

(1)  Construction of the Back Up Containerised Generators (comprised in Work No. 1A(h)) shall not commence until details of their layout, scale and external appearance have been submitted to and approved by West Somerset District Council.

(2)  The details referred to in paragraph (1) shall be in accordance with parameter plans HINK-A2-LLY-00-GA-001 (Rev 01); HINK-A2-LLV-00-GA-001 (Rev 01); and HINK-A2-LLW-00-GA-001 (Rev 01).

(3)  The works shall be carried out in accordance with the approved details. ;

(c)In sub-paragraph (2) of requirement MS19, for “(Rev 02)” substitute “(Rev 03)”; and

(d)In sub-paragraph (2) of requirement MS21, for “(Rev 02)” substitute “(Rev 03)”.

Certification of revised or substituted plans

7.—(1) The undertaker shall, as soon as practicable after the making of this Order, submit copies of any revised or substituted plans to the Secretary of State for certification that they are true copies of the plans referred to in this Order.

(2) A plan so certified by the Secretary of State is admissible in any proceedings as evidence of the contents of the document of which it is a copy.

(3) In paragraph (1), the “undertaker” has the same meaning as in article 2(1) of the Order.

Signed on behalf of the Secretary of State for Business, Energy and Industrial Strategy

Gareth Leigh

Head of Energy Infrastructure Planning

Department for Business, Energy and Industrial Strategy

23rd March 2018

Article 5

SCHEDULEApproved plans to be substituted into Part 3 (Approved plans) of Schedule 1 (Authorised project) to the Order

HPC Permanent Development Site

Site Plans

Drawing numberRevDrawing titleScale>Paper size
HINK-A1-SL-00-GA-00203HPC Site Parameter Plan1:1000A0
HINK-A1-SL-00-GA-01003Site Layout Plan (Operational)1:2500A1

Nuclear Island (Unit 1)

Unit 1: Reactor Building / Fuel Building / Fuel Building Hall / Boron Storage / Safeguard Buildings / Nuclear Auxiliary Building / Access Tower / Service Access Building 2

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-HR-01-GP-09003Roof Plan1:200A0
HINK-A2-HR-01-GE-00103South and West Elevations1:200A0
HINK-A2-HR-01-GE-00203North and East Elevations1:200A0
HINK-A2-HR-01-DT-00102Part Elevation Detail1:50A0

Radioactive Waste Storage / Radioactive Waste Process Building

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-HQ-00-GA-00101Roof Plan and Elevations1:200A0
HINK-A2-HQ-00-DT-00101Part Elevation Detail1:50A0

Hot Laundry / Hot Workshop / Hot Warehouse / Facilities for Decontamination / Effluent Tanks / Refuelling Water Storage Tank / Battery Load Bank

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-HV-00-GP-02003Roof Plan1:200A1
HINK-A2-HV-00-GE-00103Elevations1:200A1
HINK-A2-HV-00-DT-00103Part Elevation Detail1:50A1

Emergency Diesel Generator – A / Cooling Water Discharge Weir Building/ Underground Tunnel Highpoint

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-HD-01-GP-04003Roof Plan1:200A1
HINK-A2-HD-01-GE-00103Elevations1:200A1
HINK-A2-HD-01-DT-00103Part Elevation Detail1:50A1

Emergency Diesel Generator – B / Cooling Water Discharge Weir Building / Battery Load Bank

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-HD-02-GP-04003Roof Plan1:200A1
HINK-A2-HD-02-GE-00103Elevations1:200A1
HINK-A2-HD-02-DT-00103Part Elevation - Detail1:50A1

Service Access Building 1

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-HGC-00-GA-00102Roof Plan & Elevations1:100A1

Nuclear Island (Unit 2)

Unit 2: Reactor Building / Fuel Building / Fuel Building Hall / Boron Storage / Safeguard Buildings / Nuclear Auxiliary Building / Access Tower / Service Access Building 3

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-HR-02-GP-09003Roof Plan1:200A0
HINK-A2-HR-02-GE-00103South and West Elevations1:200A0
HINK-A2-HR-02-GE-00203North and East Elevations1:200A0
HINK-A2-HR-02-DT-00102Part Elevation Detail1:50A0

Radioactive Waste Treatment Building / Battery Load Bank

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-HQC-00-GP-04002Roof Plan1:100A1
HINK-A2-HQC-00-GE-00102Elevations1:100A1
HINK-A2-HQC-00-DT-00102Part Elevation Detail1:50A1

Emergency Diesel Generator – C / Cooling Water Discharge Weir Building/ Underground Tunnel Highpoint

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-HD-03-GP-04003Roof Plan1:200A1
HINK-A2-HD-03-GE-00103Elevations1:200A1
HINK-A2-HD-03-DT-00103Part Elevation Detail1:50A1

Emergency Diesel Generator – D / Cooling Water Discharge Weir Building/ Battery Load Bank

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-HD-04-GP-04003Roof Plan1:200A1
HINK-A2-HD-04-GE-00103Elevations1:200A1
HINK-A2-HD-04-DT-00103Part Elevation Detail1:50A1

Service Access Building 4

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-HGB-00-GA-00102Roof Plan & Elevations1:100A1

Conventional Island (Unit 1)

Unit 1: Turbine Hall

Drawing numberRevDrawing titleScale>Paper size
HINK-A1-HM-01-GA-00602Roof Plan, North and South Elevations1:200A0
HINK-A1-HM-01-GE-00102West and East Elevations1:200A0
HINK-A1-HM-01-DT-00101Part Elevation Detail1:50A0

Unit 1: Sky Bridges

Drawing numberRevDrawing titleScale>Paper size
HINK-A1-BR-01-GP-01001Roof Plan1:100A1
HINK-A1-BR-01-GE-00101North and South Elevations1:100A1
HINK-A1-BR-01-GE-00201East and West Elevations1:100A1
HINK-A1-BR-01-DT-00101Part Elevation Detail1:50A1

Unit 1: Non Classified Electrical Building

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-HF-01-GP-03002Roof Plan1:100A1
HINK-A2-HF-01-GE-00102South Elevation1:100A1
HINK-A2-HF-01-GE-00202North and East Elevations1:100A1
HINK-A2-HF-01-DT-00102Part Elevation Detail1:50A1

Unit 1: Gas Insulated Switch Gear / Main Transformer / Unit Transformer / Auxiliary Transformer

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-HT-01-GP-00302Roof Plan1:200A1
HINK-A2-HT-01-GE-00102Elevations1:200A1
HINK-A2-HT-01-DT-00102Part Elevation - Detail1:50A1

Unit 1: Hydrazine Storage

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-SIR-01-GA-00101Roof Plan and Elevations1:100A1

Conventional Island (Unit 2)

Unit 2: Turbine Hall

Drawing numberRevDrawing titleScale>Paper size
HINK-A1-HM-02-GA-00602Roof Plan, North and South Elevations1:200A0
HINK-A1-HM-02-GE-00102West and East Elevations1:200A0
HINK-A1-HM-02-DT-00101Part Elevation Detail1:50A0

Unit 2: Sky Bridges

Drawing numberRevDrawing titleScale>Paper size
HINK-A1-BR-02-GP-01001Roof Plan1:100A1
HINK-A1-BR-02-GE-00101North and South Elevations1:100A1
HINK-A1-BR-02-GE-00201East and West Elevations1:100A1
HINK-A1-BR-02-DT-00101Part Elevation Detail1:50A1

Unit 2: Non Classified Electrical Building

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-HF-02-GP-03002Roof Plan (Lev 10.70m)1:100A1
HINK-A2-HF-02-GE-00102South Elevation1:100A1
HINK-A2-HF-02-GE-00202North and West Elevations1:100A1
HINK-A2-HF-02-DT-00102Part Elevation Detail1:50A1

Unit 2: Gas Insulated Switch Gear / Main Transformer / Unit Transformer / Auxiliary Transformer

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-HT-02-GP-00302Roof Plan1:200A1
HINK-A2-HT-02-GE-00102Elevations1:200A1
HINK-A2-HT-02-DT-00102Part Elevation - Detail1:50A1

Operations

Operational Service Centre

Drawing numberRevDrawing titleScale>Paper size
HINK-A1-HB-00-GP-09001Roof Plan1:200A1
HINK-A1-HB-00-GE-00101North and South Elevations1:200A1
HINK-A1-HB-00-GE-00201East and West Elevations1:200A1
HINK-A1-HB-00-DT-00101Part Elevation Detail1:50A1

Cooling Water Pumphouse and Associated Buildings (Unit 1)

Unit 1: Cooling Water Pumphouse / Forebay / Outfall Pond / Service Access Buildings 5 & 7

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-HP-01-GP-03003Roof Plan1:200A0
HINK-A2-HP-01-GE-00103Elevations1:200A0
HINK-A2-HP-01-DT-00103Part Elevation - Detail1:50A0

Unit 1: Fire-Fighting Water Building

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-HOJ-01-GA-00303Roof Plan and Elevations1:200A1
HINK-A2-HOJ-01-DT-00103Part Elevation - Detail1:50A1

Discharge Shaft (Units 1 & 2)

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-HCT-00-GA-00101Roof Plan & Elevations1:100A1

Cooling Water Pumphouse and Associated Buildings (Unit 2)

Unit 2: Cooling Water Pumphouse / Forebay / Outfall Pond / Service Access Buildings 6 & 8

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-HP-02-GP-03003Roof Plan1:200A0
HINK-A2-HP-02-GE-00103Elevations1:200A0
HINK-A2-HP-02-DT-00103Part Elevation Detail1:50A0

Unit 2: Fire-Fighting Water Building

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-HOJ-02-GA-00303Roof Plan and Elevations1:200A1
HINK-A2-HOJ-02-DT-00103Part Elevation Detail1:50A1

Remaining Balance of Plant and Other Plant (Unit 1)

Unit 1: Hydrogen Storage

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-HZH-01-GA-00202Roof Plan and Elevations1:100A1

Unit 1: Oxygen Storage

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-HZO-01-GA-00201Roof Plan and Elevations1:100A1

Remaining Balance of Plant and Other Plant (Unit 2)

Unit 2: Hydrogen Storage

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-HZH-02-GA-00202Roof Plan & Elevations1:100A1

Unit 2: Oxygen Storage

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-HZO-02-GA-00201Roof Plan and Elevations1:100A1

Remaining Balance of Plant and Other Plant (Shared Between both Units)

Demineralisation Station

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-HY-00-GP-03002Roof Plan1:100A1
HINK-A2-HY-00-GE-00102North and South Elevations1:100A1
HINK-A2-HY-00-GE-00202East and West Elevations1:100A1
HINK-A2-HY-00-DT-00102Part Elevation Detail1:50A1

Auxiliary Boilers

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-HVB-00-GA-00401Roof Plan1:100A1
HINK-A2-HVB-00-GE-00101Elevations1:100A1
HINK-A2-HVB-00-DT-00101Part Elevation Detail1:50A1

Chemical Products Storage

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-HZC-00-GA-00101Roof Plan and Elevations1:100A1
HINK-A2-HZC-00-DT-00101Part Elevation Detail1:50A1

Sewage Treatment Plant

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-STP-00-GA-00101Plans and Elevations1:100A1

Conventional Island Water Storage Tank – A

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-SER-01-GA-00201Roof Plan and East Elevation1:200A1

Conventional Island Water Storage Tank – B

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-SER-02-GA-00201Roof Plan and East Elevation1:200A1

Nuclear Island Water Storage Tank

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-SED-00-GA-00201Roof Plan and South and East Elevations1:100A1

Degassed Water Storage Tanks/ Valve Room

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-REA-00-GA-00102Plan and Elevations1:200A1

Fuel Waste and Storage

Interim Spent Fuel Store

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-HHK-00-GP-00001Plan1:200A0
HINK-A2-HHK-00-GE-00101North and South Elevations1:200A0
HINK-A2-HHK-00-GE-00201East and West Elevations1:200A0

Access Control Building

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-HUD-00-GA-00101Plans and Elevations1:100A1

Intermediate Level Waste Interim Storage Facility

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-HHI-00-GA-00201Roof Plan and Elevations1:200A0
HINK-A2-HHI-00-DT-00101Part Elevation Detail1:50A0

Ancillary, Office and Storage

Main Access Control Building

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-HU-00-GP-01001Roof Plan1:100A1
HINK-A2-HU-00-GE-00101Elevations1:100A1
HINK-A2-HU-00-DT-00101Part Elevation Detail1:50A1

Entry Relay Building

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-ERB-00-GA-00201Roof Plan and Elevations1:100A1
HINK-A2-ERB-00-DT-00101Part Elevation Detail1:50A1

Off-site Vehicle Search Area

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-VSA-00-GA-00102Roof Plan and Elevations1:50A1

Auxiliary Administration Centre

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-HUC-00-GP-02003Roof Plan1:100A1
HINK-A2-HUC-00-GE-00103North and South Elevations1:100A1
HINK-A2-HUC-00-GE-00203East and West Elevations1:100A1
HINK-A2-HUC-00-DT-00103Part Elevation1:50A1

EDF Site Offices

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-HAO-00-GE-00102Roof & Elevations1:200A1
HINK-A2-HAO-00-DT-00102Part Elevation Detail1:50A1

Garage for Handling Facilities

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-HBG-00-GP-01001Roof Plan1:100A1
HINK-A2-HBG-00-GE-00101Elevations1:100A1
HINK-A2-HBG-00-DT-00101Part Elevation Detail1:50A1

Oil and Grease Storage and Oil Ancillary Building

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-HOG-00-GA-00201Roof Plan1:100A1
HINK-A2-HOG-00-GE-00101North and South Elevations1:100A1
HINK-A2-HOG-00-GE-00201East and West Elevations1:100A1
HINK-A2-HOG-00-DT-00101Part Elevation Detail1:50A1

AREVA Warehouse

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-HBW-00-GP-01001Roof Plan1:200A1
HINK-A2-HBW-00-GE-00101Elevations1:200A1
HINK-A2-HBW-00-DT-00101Part Elevation Detail1:50A1

Meteorological Station

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-HSM-00-GA-00201Roof Plan and Elevations1:50A1

Outage Access Control Building

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-TU1-00-GA-00201Roof Plan and Elevations1:100A1
HINK-A2-TU1-00-DT-00101Part Elevation Detail1:50A1

Contaminated Tools Storage

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-HHC-01-GA-00202Roof Plan and Elevations1:200A1
HINK-A2-HHC-01-DT-00102Part Elevation Detail1:50A1

Conventional Waste Storage

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-CWS-00-GA-00201Roof Plan and Elevations1:200A1

Transit Area for Very Low Level Waste and Low Level Waste

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-HHL-00-GE-00101Elevations1:100A1

Raw Water and Potable Water Supply

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-HOR-00-GA-00102Roof Plan1:100A0
HINK-A2-HOR-00-GA-00202Elevations1:100A0
HINK-A2-HOR-00-DT-00102Part Elevation Detail1:50A1

Emergency Response Store

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-HHE-00-GA-00101Roof Plan & Elevations1:200A1
HINK-A2-HHE-00-DT-00101Part Elevation Detail1:50A1

Services Ventilation Building

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-HGM-00-GA-00101Roof Plan & Elevations1:100A1

Public and Training

Simulator Building / Training Centre

Drawing numberRevDrawing titleScale>Paper size
HINK-A1-HBS-00-GP-02001Roof Plan1:200A1
HINK-A1-HBS-00-GE-00101Elevations1:200A1
HINK-A1-HBS-00-DT-00101Part Elevation Detail1:50A1

Public Information Centre

Drawing numberRevDrawing titleScale>Paper size
HINK-A1-PIC-00-GP-04001Roof Plan1:100A1
HINK-A1-PIC-00-GE-00101North and West Elevations1:100A1
HINK-A1-PIC-00-GE-00201South and East Elevations1:100A1
HINK-A1-PIC-00-DT-00101Part Elevation Detail1:50A1

National Grid Substation

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-SS-00-GP-01001Roof Plan1:200A0
HINK-A2-SS-00-GE-00101Elevations1:200A0
HINK-A2-SS-00-DT-00101Part Elevation Detail1:50A0

Other Site Structures

Sea Wall (Incorporating Coastal Footpath)

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-HSW-00-GA-00102Plans1:500A0
HINK-A2-HSW-00-GA-00201North Elevation1:50A0
HINK-A2-HSW-00-GA-00301Detail Plans and Elevations1:50A0
HINK-A2-HSW-00-GA-00402Detail Plan and Elevation1:100A0

EDF Energy Pylons

Drawing numberRevDrawing titleScale>Paper size
HINK-A1-PL-00-GA-00101Location Plan, Plans, Elevations and AxonometricVariousA1

Back Up Power Containerised Generator 1 - Near to the Main Access Building

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-LLY-00-GA-00101Plan and Elevations1:100A1

Back Up Power Containerised Generator 2 - Near to the Operational Service Building

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-LLV-00-GA-00101Plan and Elevations1:100A1

Back Up Power Containerised Generator 3 – Near to the Areva Warehouse

Drawing numberRevDrawing titleScale>Paper size
HINK-A2-LLW-00-GA-00101Plan and Elevations1:100A1

Highways Plans

Drawing numberRevDrawing titleScale>Paper size
HPC-GEN124-RI-RFC-DRW-00004501Northern Roundabout Proposed Layout1:500A1
HPC-GEN124-RI-RFC-DRW-00004601Vehicle Search Area Layby and Turning Head Proposed Layout1:250A1
HPC-GEN124-RI-RFC-DRW-00004701Southern Roundabout Proposed Layout During Operation1:500A1
HPC-GEN124-RI-RFC-DRW-00004801Southern Roundabout Proposed Layout During Construction1:500A1
HPC-GEN124-RI-RFC-DRW-00004901Emergency Access Road Junction with Existing Highway Proposed Layout1:250A1

Site Preparation Plans

Drawing numberRevDrawing titleScale>Paper size
HPCSPW002a Rev101Site Layout Plan1:3500A1
HPCSPW002b00Beach Access Road Plan and Cross Sections1:250 / 1:50A1
HPCSPW004 Rev101Planning Application Fencing Arrangement (Sheet 1 of 3)1:3500A1
HPCSPW005 Rev101Fencing Enlarged Detail West (Sheet 2 of 3)1:1500A1
HPCSPW006 Rev101Fencing Enlarged Detail East (Sheet 3 of 3)1:1500A1
HPCSPW007 Rev101Indicative Earthworks Cut and Fill Arrangement1:3500A1
HPCSPW00800Early Works Water Management Zone1:2500A1
HPCSP009 Rev101Surface Water Catchment Area Overall General Arrangement1:3000A1
HPCSPW01000Arrangement of Construction Drainage Outfall to Foreshore1:75A1
HPCSPW011 Rev101Surface Water Drainage Holford Stream Culvert1:1500 / 1:150A1
HPCSPW012a00Deep Water Drainage Arrangement1:2000 / 1:100A1
HPCSPW012b00Deep Water Arrangement Spine Drain Sections A and B1:200A1
HPCSPW012c00Deep Water Assessment Spine Drain Sections C1:200A1
HPCSPW013b00Typical Cross Section Through Haul Road1:50A1
HPCSPW0140011kv Sub Station Plan and Elevations1:100A1
HPCSPW01500Raw Water Reservoir Plans and Sections1:150A1
HPCSPW016 Rev101Surface Water Drainage in the Built Development Areas1:1750A1
HPCSPW01700Site Access Control Arrangement, Floor and Elevation1:50A1
HPCSPW019 Rev101Landscape Proposal Plan1:5000A1
HPCSPW02200Proposed Sewage Treatment Plant – Plans and Sections1:100A1
HPCSPW023a00Existing and Reinstated Ground Level Cross Sections1:2500 / 1:500A1
HPCSPW023b00Earthworks Platforms Cross Sections1:2500 / 1:500A1
HPCSPW025a Rev202Tree and Hedgerow Retention and Removal1:4000A1
HPCSPW025b Rev101Proposed Advanced Planting, Plan1:1000A1
HPCSPW02600Primary and Secondary Access Tracks1:3500A1
HPCSPW02700NW Boundary Mitigation During Construction Cross Sections A and B1:200A1
HPCSPW02800NW Boundary Mitigation During Construction Cross Sections C and D1:200A1
HPCSPW02900NW Boundary Mitigation During Construction Planting Plan1:750A1

EXPLANATORY NOTE

(This note is not part of the Order)

This Order amends the Hinkley Point C (Nuclear Generating Station) Order 2013 (“the 2013 Order”), a development consent order under the Planning Act 2008 (“the Act”), which has previously been amended by the Hinkley Point C (Nuclear Generating Station) (Correction) Order 2013, the Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2015 and the Hinkley Point C (Nuclear Generating Station) (Amendment) Order 2017.

This Order follows an application under paragraph 2 of Schedule 6 to the Act for a non-material change to allow an alteration to the alignment of the sea wall and the erection of additional pipework along the underside of the temporary jetty to enable discharges of water from the site. This Order also allows for the redesign and the change in size and location of a number of structures within the Hinkley Point C Permanent Development Site and amends the listed plans in Part 3 of Schedule 1 to the 2013 Order.

This Order, in article 7, provides for the certification of revised or substituted plans for use as evidence in any proceedings.

The changes to the 2013 Order take effect from the date specified in this Order.

(1)

2008 c.29. Paragraph 2 of Schedule 6 was amended by paragraph 4 of Schedule 8 to the Marine and Coastal Access Act 2009 (c.23), by paragraphs 1 and 72 of Schedule 13 to the Localism Act 2011 (c.20), and by section 28 of the Infrastructure Act 2015 (c.7). There are other amendments to the Act that are not relevant to this Order.

(2)

S.I. 2011/2055. Regulations 6 and 7 were both amended by S.I. 2012/635 and S.I. 2015/760.

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources