Amendment to Part 1 (Authorised development) of Schedule 1 (Authorised project)
3.—(1) In Part 1 of Schedule 1 to the Order the description of Work No. 1A is amended as follows:
(2) In paragraph (d)(i)—
(a)after “Effluent Tanks” insert “and Refuelling Water Storage Tank”;
(b)after “Battery Load Bank;” insert “and”;
(c)after “Cooling Water Discharge Weir (Buildings)” omit “and Refuelling Water Storage Tank;”.
(3) In paragraph (h)—
(a)after “Service Access Buildings;” omit “and”;
(b)in the list below “Service Access Buildings;”, insert “Underground Tunnel High Points;”; and
(c)in the list, below “Services Ventilation Building;” insert—
“Back Up Containerised Generators; and
Valve Room for Demineralisation Station.”