SCHEDULES

Requirement 5

SCHEDULE 14E+WDESIGN PARAMETERS

PART 1 E+WSINGLE SHAFT PARAMETERS

1.  The maximum parameters for the buildings and structures for the single shaft layout are set out at table 14.E+W

2.  The maximum parameters and grid reference location of the combined cycle gas turbine stacks are set out in table 15.E+W

3.  The finished ground level in respect of Work No. 1 is between 7.9 metres AOD and 9.9 metres AOD.E+W

Table 14

(1) Component(2) Maximum length (m)(3) Maximum width (m)(4) Maximum height (m)(5) Maximum diameter (m)
Gas turbine hall building767630-
Heat recovery steam generator632850-
Electrical building near heat recovery steam generator302710-
Combine cycle gas turbine air intake filters (each)241630-
Electrical building near air intake filter391610-
Generator transformer302415-
Feed water pump building642320-
Demineralised water treatment plant, fire pumps and laboratory573320-
Demineralised water storage tank--2025
Gas reception facility65525-
Gas compressors502010-
Auxiliary boiler301520-
Auxiliary boiler stacks (each)--251.5
Combined cycle gas turbine standby diesel generators1998-
Continuous emissions monitoring system container1033-
Cooling towers (each)2402725-
Cooling water electrical module15610-
Cooling water pumps30158-
Cooling water sampling and dosing plant19118-
Peaking plant building1036530-
Peaking plant stack(s) (each) (open cycle gas turbine)--458
Peaking plant stack(s) (each) (gas engine)--281.3
Black start facility554330-
Black start facility stack(s) (each) (open cycle gas turbine)--452.5
Black start facility stack(s) (each) (gas engine)--251.3
Diesel tank for black start diesel generator--124
Electrical control room and administration building852420-
Electrical substation401715-
Workshop and stores512012-
Raw and fire water tank--2025
Gas bottle stores (each)1753-
Closed-circuit cooling water coolers151010-
Waste water treatment plant552820-
Firewater and stormwater retention basins110500-
Gatehouse12125-

Table 15

(1) Component(2) Grid reference of centre point of each stack (using reference system OSGB36 - Ordnance Survey Great Britain 1936)(3) Maximum diameter of each stack (m)(4) Top of each stack in mAOD
Combined cycle gas turbine stack

First stack—

457600

423933

Second Stack—

457593

423944

Third Stack—

457587

423933

9.699.9

PART 2 E+WMULTI-SHAFT PARAMETERS

4.  The maximum parameters for the buildings and structures for the multi shaft layout are set out at table 16.E+W

5.  The maximum parameters and grid reference location of the combined cycle gas turbine stacks are set out in table 17.E+W

6.  The finished ground level in respect of Work No. 1 is between 7.9 metres AOD and 9.9 metres AOD.E+W

Table 16

(1) Component(2) Maximum length (m)(3) Maximum width (m)(4) Maximum height (m)(5) Maximum diameter (m)
Gas turbine hall building767630-
Steam turbine hall building645430-
Heat recovery steam generator632850-
Electrical building near heat recovery steam generator302710-
Combine cycle gas turbine air intake filters (each)241630-
Electrical building near air intake filter241610-
Generator transformer212015-
Feed water pump building542620-
Demineralised water treatment plant, fire pumps and laboratory573320-
Demineralised water storage tank--2025
Gas reception facility65525-
Gas compressors502010-
Auxiliary boiler301520-
Auxiliary boiler stacks (each)--251.5
Combined cycle gas turbine standby diesel generators1998-
Continuous emissions monitoring system container1033-
Cooling towers (each)2402730-
Cooling water electrical module15610-
Cooling water pumps30158-
Cooling water sampling and dosing plant19118-
Peaking plant building1036530-
Peaking plant stack(s) (each) (open cycle gas turbine)--458
Peaking plant stack(s) (each) (gas engine)--281.3
Black start facility554330-
Black start facility stack(s) (each) (open cycle gas turbine)--452.5
Black start facility stack(s) (each) (gas engine)--251.3
Diesel tank for black start diesel generator--124
Electrical control room and administration building852420-
Electrical substation351515-
Workshop and stores512012-
Raw and fire water tank--2025
Gas bottle stores (each)1753-
Closed-circuit cooling water coolers151010-
Waste water treatment plant552820-
Firewater and stormwater retention basins110500-
Gatehouse12125-

Table 17

(1) Component(2) Grid reference of centre point of each stack (using reference system OSGB36 - Ordnance Survey Great Britain 1936)(3) Maximum diameter of each stack (m)(4) Top of each stack in mAOD
Combined cycle gas turbine stack

First stack—

457600

423933

Second Stack—

457593

423944

Third Stack—

457587

423933

9.699.9