Search Legislation

The Environmental Permitting (England and Wales) Regulations 2016

 Help about what version

What Version

  • Latest available (Revised)
  • Original (As made)
 Help about advanced features

Advanced Features

 Help about opening options

Opening OptionsExpand opening options

Changes over time for:

 Help about opening options

Alternative versions:

Changes to legislation:

The Environmental Permitting (England and Wales) Regulations 2016 is up to date with all changes known to be in force on or before 16 May 2025. There are changes that may be brought into force at a future date. Changes that have been made appear in the content and are referenced with annotations. Help about Changes to Legislation

Part A(1)

(a)Disposal of non-hazardous waste with a capacity exceeding 50 tonnes per day (or 100 tonnes per day if the only waste treatment activity is anaerobic digestion) involving one or more of the following activities, and excluding activities covered by [F1the Urban Waste Water Treatment (England and Wales) Regulations 1994]

(i)biological treatment;

(ii)physico-chemical treatment;

(iii)pre-treatment waste for incineration or co-incineration;

(iv)treatment of slags and ashes;

(v)treatment in shredders of metal waste, including waste electrical and electronic equipment and end-of-life vehicles and their components.

(b)Recovery or a mix of recovery and disposal of non-hazardous waste with a capacity exceeding 75 tonnes per day (or 100 tonnes per day if the only waste treatment activity is anaerobic digestion) involving one or more of the following activities, and excluding activities covered by [F2the Urban Waste Water Treatment (England and Wales) Regulations 1994]

(i)biological treatment;

(ii)pre-treatment of waste for incineration or co-incineration;

(iii)treatment of slags and ashes;

(iv)treatment in shredders of metal waste, including waste electrical and electronic equipment and end-of-life vehicles and their components.

Back to top

Options/Help

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?