Schedule 310
In Schedule 3 (approval of proposed schemes)—
a
omit Part 2;
b
omit paragraph 12(a);
c
in paragraph 13, for “three compliance periods covered by the operational plan”, substitute “first three compliance periods to which the application relates”;
d
paragraph 15 is renumbered as sub-paragraph (1) of that paragraph;
e
after that sub-paragraph, insert—
2
In sub-paragraph (1)(c), “a scheme information campaign” means a campaign to disseminate information to ensure that end-users of portable batteries are fully informed of—
a
the desirability of not disposing of waste batteries as unsorted municipal waste and of participating in their separate collection so as to facilitate treatment and recycling;
b
the collection and recycling facilities available to them;
c
their role in contributing to the recycling of waste batteries;
d
the meaning of the symbol of the crossed-out wheeled bin shown in Schedule 5 and the chemical symbols “Hg”, “Cd” and “Pb”.