INFRASTRUCTURE PLANNING
This Order grants development consent for 2 offshore wind turbine electricity generating stations in the North Sea between 125 kilometres and 290 kilometres off the United Kingdom coast together with associated development. The Order authorises the compulsory purchase of land and rights in land and the right to use land and to override easements and other rights.
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 3(1)(b)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) Order 2020
art. 4(2)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 41(A1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) Order 2020
art. 4(3)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
art. 12A
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 4(g)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 13(6)(a)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 9(a)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 13(6)(b)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 9(b)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 14
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 10(a)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 14
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 10(b)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 15(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 11(a)(i)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 15(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 11(a)(ii)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 15(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 11(a)(iii)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 15(1A)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 11(b)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 15(2)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 11(c)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 16(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 12(a)(i)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 16(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 12(a)(ii)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 16(1)(a)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 12(b)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 16(1)(b)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 12(b)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 16(2)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 12(c)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 16(3)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 12(d)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 16(4)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 12(e)(i)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 16(4)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 12(e)(ii)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 18(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 13(a)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 18(2)-(9)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 13(b)(c)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 19(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 14(a)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 19
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 14(a)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 19(2)-(5)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 14(b)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 20(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 15(a)(i)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 20(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 15(a)(ii)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 20(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 15(a)(iii)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 20(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 15(a)(iv)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 20(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 15(a)(v)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 20(3)
(4)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 15(b)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 21(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 16(a)(i)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 21(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 16(a)(ii)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 21(2)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 16(b)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 22(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 17
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 23(4)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 18(a)(i)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 23(4)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 18(a)(ii)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 23(4A)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 18(b)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 23(6)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 18(c)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 24(4)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 19
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 25(2)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 20(a)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 25(3)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 20(b)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 25(5)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 20(c)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 26(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 21(a)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 26(2)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 21(b)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 26(4)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 21(c)(i)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 26(4)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 21(c)(ii)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 26(4)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 21(c)(iii)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 26(5)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 21(d)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 26(6)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 21(e)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 27(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 22(a)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 27(2)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 22(b)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 27(3)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 22(c)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 28(2)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 23(a)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 28(3)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 23(b)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 31(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 24(a)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 31(2)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 24(b)(i)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 31(2)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 24(b)(ii)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 31(3)
(4)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 24(c)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 32(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 25(a)(i)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 32(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 25(a)(ii)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 32(2)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 25(b)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 32(4)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 25(c)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 34(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 26(a)(i)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 34(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 26(a)(ii)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 34(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 26(a)(iii)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 34(2)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 26(b)(i)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 34(2)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 26(b)(ii)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 34(2A)
(2B)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 26(c)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 34(4)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 26(d)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 35(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 27(a)(i)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 35(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 27(a)(ii)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 35(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 27(a)(iii)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 35(2)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 27(b)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 35(3)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 27(c)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 35(5)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 27(d)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 37(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 28(a)(i)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 37(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 28(a)(ii)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 37(1A)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 28(b)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 37(2)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 28(c)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 37(3)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 28(d)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 38(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 29(a)(i)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 38(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 29(a)(ii)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 38(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 29(a)(iii)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 38(1A)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 29(b)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 38(2)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 29(c)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 38(3)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 29(d)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 3(1A)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) Order 2019
art. 5(b)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 5(7A)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) Order 2019
art. 5(e)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 5(8A)
(8B)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) Order 2019
art. 5(g)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 8A
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) Order 2019
art. 5(h)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 41
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) Order 2019
art. 5(i)
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 5(8B)(b)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) Order 2021
art. 5(a)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 6(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) Order 2021
art. 5(b)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 6A
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) Order 2021
art. 5(c)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 9(3)(b)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) Order 2021
art. 5(d)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 13(6)(b)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) Order 2021
art. 5(e)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 14
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) Order 2021
art. 5(f)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 14
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) Order 2021
art. 5(f)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 6(2)(b)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2021
art. 4
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 12 Pt. 3
para. 2
The Communications Act 2003 and the Digital Economy Act 2017 (Consequential Amendments to Secondary Legislation) Regulations 2017
Sch. 4
para. 53(2)(b)
reg. 1(1)
SCHEDULE 12Protective provisions
PART 4Protection of offshore cables and pipelines
4
Despite anything in this Order, except in the case of any part of the protected property that the Company certifies in writing is permanently disused, the undertaker must not exercise the powers conferred by this Order to relocate any protected property until suitable alternative facilities have been provided by the undertaker and are available for use to the reasonable satisfaction of the Company.