http://www.legislation.gov.uk/uksi/2015/1592/schedule/11/paragraph/17/made
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
en
King's Printer of Acts of Parliament
2017-09-29
INFRASTRUCTURE PLANNING
This Order grants development consent for 2 offshore wind turbine electricity generating stations in the North Sea between 125 kilometres and 290 kilometres off the United Kingdom coast together with associated development. The Order authorises the compulsory purchase of land and rights in land and the right to use land and to override easements and other rights.
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 3(1)(b)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) Order 2020
art. 4(2)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 41(A1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) Order 2020
art. 4(3)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
art. 12A
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 4(g)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 13(6)(a)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 9(a)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 13(6)(b)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 9(b)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 14
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 10(a)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 14
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 10(b)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 15(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 11(a)(i)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 15(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 11(a)(ii)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 15(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 11(a)(iii)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 15(1A)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 11(b)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 15(2)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 11(c)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 16(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 12(a)(i)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 16(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 12(a)(ii)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 16(1)(a)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 12(b)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 16(1)(b)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 12(b)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 16(2)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 12(c)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 16(3)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 12(d)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 16(4)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 12(e)(i)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 16(4)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 12(e)(ii)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 18(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 13(a)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 18(2)-(9)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 13(b)(c)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 19(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 14(a)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 19
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 14(a)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 19(2)-(5)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 14(b)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 20(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 15(a)(i)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 20(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 15(a)(ii)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 20(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 15(a)(iii)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 20(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 15(a)(iv)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 20(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 15(a)(v)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 20(3)
(4)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 15(b)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 21(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 16(a)(i)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 21(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 16(a)(ii)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 21(2)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 16(b)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 22(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 17
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 23(4)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 18(a)(i)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 23(4)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 18(a)(ii)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 23(4A)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 18(b)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 23(6)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 18(c)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 24(4)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 19
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 25(2)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 20(a)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 25(3)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 20(b)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 25(5)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 20(c)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 26(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 21(a)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 26(2)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 21(b)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 26(4)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 21(c)(i)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 26(4)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 21(c)(ii)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 26(4)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 21(c)(iii)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 26(5)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 21(d)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 26(6)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 21(e)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 27(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 22(a)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 27(2)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 22(b)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 27(3)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 22(c)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 28(2)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 23(a)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 28(3)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 23(b)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 31(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 24(a)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 31(2)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 24(b)(i)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 31(2)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 24(b)(ii)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 31(3)
(4)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 24(c)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 32(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 25(a)(i)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 32(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 25(a)(ii)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 32(2)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 25(b)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 32(4)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 25(c)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 34(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 26(a)(i)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 34(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 26(a)(ii)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 34(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 26(a)(iii)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 34(2)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 26(b)(i)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 34(2)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 26(b)(ii)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 34(2A)
(2B)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 26(c)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 34(4)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 26(d)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 35(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 27(a)(i)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 35(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 27(a)(ii)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 35(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 27(a)(iii)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 35(2)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 27(b)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 35(3)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 27(c)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 35(5)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 27(d)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 37(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 28(a)(i)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 37(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 28(a)(ii)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 37(1A)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 28(b)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 37(2)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 28(c)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 37(3)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 28(d)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 38(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 29(a)(i)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 38(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 29(a)(ii)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 38(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 29(a)(iii)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 38(1A)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 29(b)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 38(2)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 29(c)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 38(3)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2020
art. 29(d)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 3(1A)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) Order 2019
art. 5(b)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 5(7A)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) Order 2019
art. 5(e)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 5(8A)
(8B)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) Order 2019
art. 5(g)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 8A
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) Order 2019
art. 5(h)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 41
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) Order 2019
art. 5(i)
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 5(8B)(b)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) Order 2021
art. 5(a)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 6(1)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) Order 2021
art. 5(b)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 6A
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) Order 2021
art. 5(c)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 9(3)(b)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) Order 2021
art. 5(d)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 13(6)(b)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) Order 2021
art. 5(e)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 14
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) Order 2021
art. 5(f)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 14
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) Order 2021
art. 5(f)
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 1 Pt. 3
para. 6(2)(b)
The Dogger Bank Teesside A and B Offshore Wind Farm (Amendment) (No. 2) Order 2021
art. 4
art. 1
The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015
Sch. 12 Pt. 3
para. 2
The Communications Act 2003 and the Digital Economy Act 2017 (Consequential Amendments to Secondary Legislation) Regulations 2017
Sch. 4
para. 53(2)(b)
reg. 1(1)
SCHEDULE 11Marine Licence 4: Project B Offshore Transmission – Work Nos. 2B, 3B and 2T
PART 2Conditions
Equipment and operation of vessels engaged in licensed activities17
1
All vessels employed to perform the licensed activities must be constructed and equipped to be capable of the proper performance of such activities in accordance with the Conditions and (except in the case of remotely-operated vehicles or vessels) must comply with sub-paragraphs (2) to (5).
2
All motor-powered vessels must be fitted with—
a
an electronic positioning aid to provide navigational data;
b
radar;
c
an echo-sounder; and
d
multi-channel VHF.
3
All vessels’ names or identification must be clearly marked on the hull or superstructure.
4
All communication on VHF working frequencies must be in English.
5
No vessel may engage in the licensed activities until all the equipment specified in sub-paragraph (2) is fully operational.