Detailed offshore design parameters
9. Within Work Nos. 1A and 2A, the HVDC cable crossings must not, in total, exceed—
(a)16 in number;
(b)88,450 cubic metres in volume of cable crossing material;
(c)98,100 square metres in seabed footprint.
9. Within Work Nos. 1A and 2A, the HVDC cable crossings must not, in total, exceed—
(a)16 in number;
(b)88,450 cubic metres in volume of cable crossing material;
(c)98,100 square metres in seabed footprint.