The Dogger Bank Teesside A and B Offshore Wind Farm Order 2015

Detailed offshore design parameters

9.  Within Work Nos. 1A and 2A, the HVDC cable crossings must not, in total, exceed—

(a)16 in number;

(b)88,450 cubic metres in volume of cable crossing material;

(c)98,100 square metres in seabed footprint.