SCHEDULE 10Marine Licence 3: Project A Offshore Transmission - Work Nos. 2A, 3A and 2T

PART 2Conditions

Detailed offshore design parameters9

Within Work Nos. 1A and 2A, the HVDC cable crossings must not, in total, exceed—

a

16 in number;

b

88,450 cubic metres in volume of cable crossing material;

c

98,100 square metres in seabed footprint.