Textual Amendments
F1Sch. 16 inserted (20.4.2016) by The Explosives Regulations 2014 (Amendment) Regulations 2016 (S.I. 2016/315), reg. 1, Sch. 2 (with regs. 2(1), 15)
F2Word in Sch. 16 heading substituted (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 16 para. 34(a) (with Sch. 16 para. 29) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
5. Where [F3an approved] body finds that essential safety requirements or corresponding [F4designated ] standards or other technical specifications have not been met by a manufacturer, it must require the manufacturer to take appropriate corrective measures and must not issue a certificate of conformity or grant an approval.]U.K.
Textual Amendments
F3Words in Sch. 16 para. 5 substituted (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 16 para. 34(f)(i) (with Sch. 16 para. 29) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)
F4Word in Sch. 16 para. 5 substituted (31.12.2020) by The Product Safety and Metrology etc. (Amendment etc.) (EU Exit) Regulations 2019 (S.I. 2019/696), reg. 1, Sch. 16 para. 34(f)(ii) (with Sch. 16 para. 29) (as amended by S.I. 2020/676, regs. 1(1), 2); 2020 c. 1, Sch. 5 para. 1(1)