SCHEDULE 1Authorised project
PART 1Authorised development
CombwichIn the District of Sedgemoor and the County of Somerset
Work No. 8A
- 1
Combwich Wharf Refurbishment and Extension—
- a
site preparation works including site clearance and demolition, construction hoardings, perimeter enclosure, ecological fencing and security, establishment of site construction compounds, construction related buildings, structures, plant, machinery and construction lighting;
- b
earthworks including retaining structures, utilities trenches and laying of utilities; surface water drainage system;
- c
internal access and circulation routes to connect to existing access route;
- d
marine works, including removal of existing structures, piling, provision of a new raised berthing mattress;
- e
refurbishment and expansion of Combwich Wharf, abnormal loads quay, mobile crane, slipways, revetments, goods wharf and associated plant and structures; navigational lighting;
- f
hardstanding areas for unloading and storage of materials and vehicle parking;
- g
landscape works, including screen planting and temporary footpath diversions; and
- h
perimeter acoustic and internal fencing, signage, gates and barriers.
The location of the above works is shown on sheet no. 16.
- a
- 2
Combwich Freight Laydown Facility—
- a
site preparation works comprising site clearance works, construction hoardings and perimeter enclosure; establishment of site construction compounds; construction related buildings, structures, plant, machinery and construction lighting;
- b
earthworks including provision of retaining walls, structures and piling; stockpiling of spoil; spoil bunds for noise attenuation, flood defence and landscape screening; utilities trenches and laying of utilities; surface water drainage system, attenuation ponds, culverts, foul water drainage systems and septic tanks;
- c
reinforcement works and use of existing Combwich Wharf access road for construction and operation needs associated with Combwich Wharf and temporary Freight Laydown Facility; vegetation clearance and highway works at the junction with the C182 and internal access and circulation routes to connect to existing Combwich Wharf access road;
- d
hardstanding for storage of materials and vehicle parking;
- e
CCTV poles and mountings, lighting poles and fittings;
- f
buildings for welfare, security, office / administration; freight handling contractor compound and associated buildings and structures;
- g
perimeter and internal fencing, signage, gates and barriers; and
- h
demolition / removal of the freight laydown facility and associated post operation phase works.
The location of the above works is shown on sheet no. 16.
- a
- 1
Work No. 8B
Highway works to widen C182 at the junction with the Combwich Wharf access road the location of which is shown on sheet no. 16.