SCHEDULE 1Authorised project

PART 1Authorised development

CombwichIn the District of Sedgemoor and the County of Somerset

  • Work No. 8A

    1. 1

      Combwich Wharf Refurbishment and Extension—

      1. a

        site preparation works including site clearance and demolition, construction hoardings, perimeter enclosure, ecological fencing and security, establishment of site construction compounds, construction related buildings, structures, plant, machinery and construction lighting;

      2. b

        earthworks including retaining structures, utilities trenches and laying of utilities; surface water drainage system;

      3. c

        internal access and circulation routes to connect to existing access route;

      4. d

        marine works, including removal of existing structures, piling, provision of a new raised berthing mattress;

      5. e

        refurbishment and expansion of Combwich Wharf, abnormal loads quay, mobile crane, slipways, revetments, goods wharf and associated plant and structures; navigational lighting;

      6. f

        hardstanding areas for unloading and storage of materials and vehicle parking;

      7. g

        landscape works, including screen planting and temporary footpath diversions; and

      8. h

        perimeter acoustic and internal fencing, signage, gates and barriers.

      The location of the above works is shown on sheet no. 16.

    2. 2

      Combwich Freight Laydown Facility—

      1. a

        site preparation works comprising site clearance works, construction hoardings and perimeter enclosure; establishment of site construction compounds; construction related buildings, structures, plant, machinery and construction lighting;

      2. b

        earthworks including provision of retaining walls, structures and piling; stockpiling of spoil; spoil bunds for noise attenuation, flood defence and landscape screening; utilities trenches and laying of utilities; surface water drainage system, attenuation ponds, culverts, foul water drainage systems and septic tanks;

      3. c

        reinforcement works and use of existing Combwich Wharf access road for construction and operation needs associated with Combwich Wharf and temporary Freight Laydown Facility; vegetation clearance and highway works at the junction with the C182 and internal access and circulation routes to connect to existing Combwich Wharf access road;

      4. d

        hardstanding for storage of materials and vehicle parking;

      5. e

        CCTV poles and mountings, lighting poles and fittings;

      6. f

        buildings for welfare, security, office / administration; freight handling contractor compound and associated buildings and structures;

      7. g

        perimeter and internal fencing, signage, gates and barriers; and

      8. h

        demolition / removal of the freight laydown facility and associated post operation phase works.

      The location of the above works is shown on sheet no. 16.

  • Work No. 8B

    Highway works to widen C182 at the junction with the Combwich Wharf access road the location of which is shown on sheet no. 16.