SCHEDULE 2Deemed licence under the Marine and Coastal Access Act 2009

PART 1Licensed marine activities

Interpretation

1.—(1) In this licence—

“the 2008 Act” means the Planning Act 2008(1);

“the 2009 Act” means the Marine and Coastal Access Act 2009(2);

“accommodation platform” means a platform housing or incorporating temporary accommodation including mess facilities, landing points for vessels and helicopters, standby electricity generation equipment, marking and lighting and other equipment and facilities to assist in the coordination of emergency marine activities related to the authorised scheme;

“Annex 1 Habitat” means such habitat as defined under the EU Council Directive 92/43/EEC on the Conservation of Natural Habitats and of Wild Fauna and Flora;

“the Approval Application” means the application made by the undertaker to the Secretary of State under condition 2;

“the Approval Notice” means the notice issued by the Secretary of State under condition 2;

“authorised deposits” means the substances and articles specified in paragraph 2(4) of Part 1 of this Schedule;

“authorised scheme” means Work Nos. 1, 2 and 3 described in paragraph 2 of Part 1 of this Schedule;

“Cefas” means the Centre for Environment, Fisheries and Aquaculture Science;

“collection platform” means a platform housing or incorporating electrical switchgear and/or electrical transformers, J-tubes, marking and lighting and other equipment and facilities to enable the electrical connection of electrical cables from multiple WTGs to be collected at, and exported from, the platform in one or more cables;

“commence” means the first carrying out of any part of the licensed activities and “commencement” shall be construed accordingly;

“condition” means a condition in Part 2 and references in this Schedule to numbered conditions are to the conditions with those numbers in Part 2;

“EDF Energy” means EDF Energy (UK) Limited (company number 02622406) and any group company of EDF Energy (UK) Limited which holds property and is a licensed holder for any of the purposes under section 6 of the Electricity Act 1989 at Sizewell, and for the purposes of this definition “group company” means any company which is a company within the meaning of section 42 of the Landlord and Tenant Act 1954 including EDF Energy Nuclear Generation Limited (company number 03076445) and NNB Generation Company Limited (company number 06937084);

“enforcement officer” means a person authorised to carry out enforcement duties under Chapter 3 of the 2009 Act;

“the environmental statement” means the document certified as the environmental statement by the Secretary of State for the purposes of this Order and submitted with the application on 21 November 2011 and the environmental information contained in the clarifications, corrections and omissions document accepted by the Examining authority as a late submission, together with the table of environmental mitigation measures in relation to protected species dated 16 July 2012 and the two tables of offshore and onshore environmental mitigation measures dated 16 July 2012 submitted to the Examining authority as part of the examination of the application for this Order;

“gravity base foundation” means a structure principally of concrete which rests on the seabed due to its own weight and that of added ballast, with or without additional drilled pins or other additional fixings, which may include an integrated transition piece, and associated equipment including J-tube and access platforms and equipment;

“JNCC” means the Joint Nature Conservation Committee;

“the Kingfisher Fortnightly Bulletin” means the bulletin published by the Humber Seafood Institute or such other alternative publication approved in writing by the MMO for the purposes of this Schedule;

“LAT” means lowest astronomical tide;

“licence conditions” means the conditions set out in Part 2 of this Schedule;

“licensed activities” means the activities specified in paragraph 2 of Part 1 of this Schedule;

“major storm event” means a greater than 1 in 10 year wave event within the Order limits seaward of MHWS in terms of a wave height measured from the Sizewell Waverider buoy (WMO ID: 62294);

“the Marine Management Organisation” or “MMO” means the body of that name created under the Marine and Coastal Access Act 2009 or any successor to its functions;

“the Maximum WTG Number” means the number of wind turbine generators specified in the Approval Notice;

“MCA” means the Maritime and Coastguard Agency;

“mean high water springs” or “MHWS” means the highest level which spring tides reach on average over a period of time;

“meteorological mast” means a mast housing or incorporating equipment to measure wind speed and other wind characteristics, including a topside housing electrical switchgear and communication equipment and associated equipment, and marking and lighting;

“the Minimum Clearance Level” means the minimum distance, measured in metres, between the lowest point of the rotating blade of a wind turbine generator and MHWS specified in the Approval Notice;

“monopile foundation” means a metal pile, typically cylindrical, driven and/or drilled into the seabed and associated equipment including J-tube and access-related equipment;

“Natural England” means the body established by section 1 of the Natural Environment and Rural Communities Act 2006(3) and includes any successor to its statutory functions;

“notice to mariners” includes any notice to mariners which may be issued by the Admiralty, Trinity House, Queen’s harbourmasters, government departments and harbour and pilotage authorities;

“the offshore Order limits” means the limits shown on the offshore Order limits plan within which the authorised scheme may be carried out, whose grid coordinates are set out in paragraph 2(3) of Part 1 of this Schedule;

“the offshore Order limits plan” means the plan certified as the offshore Order limits plan by the Secretary of State for the purposes of this Schedule;

“offshore substation platform” means a platform with one or more decks, whether open or fully clad, accommodating medium to high voltage electrical power transformers, medium and/or high voltage switch gear, helicopter landing facilities, re-fuelling facilities, potable water storage, black water separation equipment, instrumentation, metering equipment, control systems, standby electrical generation equipment, auxiliary and uninterruptible power supply systems, emergency accommodation including mess facilities, craneage, control hub, drainage facilities, access equipment, marking and lighting and other associated equipment and facilities;

“the Order” means the Galloper Wind Farm Order 2013;

“the Percentage Reduction” means the reduction of 15.2% in the predicted mortality of lesser black-backed gulls, by restricting the number of predicted mortalities attributable to the authorised scheme to a maximum of 18;

“space frame foundation” means a metal jacket/lattice-type structure, including between three and six legs, which is fixed to the seabed with driven piles and/or drilled pins and/or weights and/or suction cans or additional fixings, which may include an integrated transition piece, and associated equipment including J-tube and access platforms and equipment;

“suction can” means a steel open-based cylinder, which is fixed to the base of the foundation and is installed until the lid is flush with the seabed;

“suction monopod” means a tubular metal structure founded on a steel open based cylinder akin to an up-turned bucket which partially penetrates the seabed, which may include an integrated transition piece, and associated equipment, including J-tube and access platform(s) and equipment;

“Trinity House” means the Corporation of Trinity House of Deptford Strond;

“UK Hydrographic Office” means the Hydrographic Office of the Ministry of Defence, Taunton, Somerset TA1 2DN or any replacement body or successor to its functions;

“undertaker” means Galloper Wind Farm Limited;

“vessel” means every description of vessel, however propelled or moved, and includes a non-displacement craft, a personal watercraft, a seaplane on the surface of the water, a hydrofoil vessel, a hovercraft or any other amphibious vehicle and any other thing constructed or adapted for movement through, in on or over water and which is at the time in, on or over water;

“wind turbine generator” or “WTG” means a structure comprising a tower, rotor with three blades, nacelle and ancillary electrical and other equipment which may include J-tubes, transition piece, access and rest platforms, access ladders, boat access systems, corrosion protection systems, fenders and maintenance equipment, helicopter landing facilities and other associated equipment, fixed to a foundation; and

“working day” means any day other than a Saturday, Sunday or public holiday in England and Wales;

“the WTG Specification” means the manufacturer and model of wind turbine generators specified in the Approval Notice.

(2) Unless otherwise indicated, in this Schedule or any approval under it—

(a)all times shall be taken to be Greenwich Mean Time (GMT);

(b)all co-ordinates shall be taken to be latitude and longitude degrees and minutes to two decimal places.

(3) Except where otherwise notified in writing by the relevant organisation, the primary point of contact with the organisations listed below and the address for returns and correspondence shall be—

(a)Marine Management Organisation

Marine Licensing Team

Lancaster House Hampshire Court

Newcastle upon Tyne

NE4 7YH

Tel: 0191 376 2525;

(b)Trinity House

Tower Hill

London

EC3N 4DH

Tel: 020 7481 6900;

(c)The United Kingdom Hydrographic Office

Admiralty Way

Taunton

Somerset

TA1 2DN

Tel: 01823 337 900;

(d)Maritime and Coastguard Agency

Navigation Safety Branch

Bay 2/04

Spring Place

105 Commercial Road

Southampton

SO15 1EG

Tel: 023 8032 9191;

(e)Centre for Environment, Fisheries and Aquaculture Science

Pakefield Road

Lowestoft

Suffolk

NR33 0HT

Tel: 01502 562 244;

(f)Natural England

Foundry House

3 Millsands

Riverside Exchange

Sheffield

S3 8NH

Tel: 0300 060 2745;

(g)JNCC

Inverdee House

Baxter Street

Aberdeen

AB11 9QA

Tel: 01224 266 550;

(h)English Heritage

Eastgate Court

195-205 High Street

Guildford

GU1 3EH

Tel: 01483 252 057.

For information only, the details of the local MMO office to the authorised scheme are—

Details of licensed marine activities

2.—(1) Subject to the licence conditions, this licence authorises the undertaker (and any agent or contractor acting on their behalf) to carry out the following licensable marine activities under section 66(1) of the 2009 Act—

(a)the deposit at sea of the substances and articles specified in sub-paragraph (4);

(b)the construction of works in or over the sea and/or on or under the sea bed; and

(c)the removal of sediment samples for the purposes of informing environmental monitoring under this licence during pre-construction, construction and operation.

(2) Such activities are authorised in relation to the construction, maintenance and operation of—

Work No. 1

(a)an offshore wind turbine generating station with a gross electrical output capacity of up to 504 MW comprising up to 140 wind turbine generators each fixed to the seabed by one of four foundation types (namely, monopile foundation, space frame foundation, suction monopod foundation or gravity base foundation), fitted with rotating blades and situated within one or more of array areas A to C, whose coordinates are specified below, and further comprising (b) to (e) below;

Coordinates for the array areas
PointLatitude (DMS)Longitude (DMS)PointLatitude (DMS)Longitude (DMS)
Area A
151° 59′ 59.611″ N1° 59′ 30.896″ E251° 59′ 30.066″ N2° 05′ 35.129″ E
351° 59′ 28.672″ N2° 05′ 37.951″ E451° 59′ 25.641″ N2° 05′ 44.985″ E
551° 59′ 22.901″ N2° 05′ 52.323″ E651° 59′ 20.463″ N2° 05′ 59.937″ E
751° 59′ 18.338″ N2° 06′ 07.792″ E851° 59′ 16.534″ N2° 06′ 15.855″ E
951° 59′ 15.059″ N2° 06′ 24.092″ E1051° 59′ 13.920″ N2° 06′ 32.467″ E
1151° 59′ 13.122″ N2° 06′ 40.945″ E1251° 59′ 12.682″ N2° 06′ 49.050″ E
1351° 59′ 12.329″ N2° 06′ 59.141″ E1451° 58′ 56.293″ N2° 07′ 50.888″ E
1551° 58′ 33.766″ N2° 08′ 44.666″ E1651° 57′ 13.719″ N2° 08′ 44. 383″ E
1751° 55′ 37.835″ N2° 08′ 14.508″ E1851° 53′ 42.962″ N2° 01′ 36.868″ E
1951° 53′ 27.719″ N2° 00′ 44.242″ E2051° 53′ 15.002″ N2° 00′ 00.138″ E
2151° 58′ 42.600″ N2° 00′ 00.138″ E2251° 58′ 42.600″ N1° 56′ 02.667″ E
Area B
151° 49′ 01.731″ N2° 01′ 29.385″ E251° 50′ 17.180″ N2° 06′ 34.867″ E
351° 45′ 40.117″ N2° 05′ 09.101″ E451° 43′ 22.529″ N1° 57′ 54.170″ E
551° 43′ 58.800″ N1° 56′ 18.600″ E651° 45′ 14.400″ N2° 00′ 00.000″ E
751° 46′ 28.672″ N2° 00′ 00.000″ E851° 48′ 39.346″ N2° 00′ 00.000″ E
951° 48′ 48.664″ N2° 00′ 36.597″ E
Area C
151° 47′ 45.600″ N1° 56′ 02.400″ E251° 45′ 58.800″ N1° 54′ 59.040″ E
351° 43′ 58.800″ N1° 56′ 18.600″ E451° 45′ 31.800″ N1° 52′ 27.415″ E
551° 46′ 51.579″ N1° 52′ 55.728″ E

(b)up to one accommodation platform fixed to the seabed by a monopile or space frame foundation within the array areas;

(c)up to one collection platform fixed to the seabed by a monopile or space frame foundation within the array areas;

(d)up to three meteorology masts fixed to the seabed by a monopile, space frame, gravity base or suction monopod foundation within the array areas;

(e)a network of cables laid within the array areas between the WTGs, the meteorology masts, any collection platform, any accommodation platform and Work No. 2, for the transmission of electricity and electronic communications between these different structures, including one or more cable crossings;

and associated development within the meaning of section 115(2) of the 2008 Act comprising—

Work No. 2 — up to three offshore substation platforms fixed to the seabed by monopile or space frame foundations within the array areas;

Work No. 3 — a connection or connections between Work No. 2 and the line of MHWS south of Sizewell, consisting of up to three cables laid along routes within the offshore Order limits, including one or more cable crossings;

and in connection with such Work Nos. 1 to 3, works comprising—

(a)temporary moorings or other means of accommodating vessels in the construction and/or maintenance of the authorised scheme;

(b)buoys, beacons, fenders and other navigational warning or ship impact protection works;

(c)temporary works for the benefit or protection of land or structures affected by the authorised scheme.

(3) The grid coordinates for the offshore Order limits are specified below—

Coordinates for the offshore Order limits
PointLatitude (DMS)Longitude (DMS)PointLatitude (DMS)Longitude (DMS)
152° 12′ 21.695″ N1° 37′ 21.969″ E252° 12′ 21.770″ N1° 37′ 22.834″ E
352° 12′ 38.547″ N1° 37′ 31.559″ E452° 13′ 06.787″ N1° 39′ 31.266″ E
552° 12′ 41.875″ N1° 41′ 19.072″ E652° 08′ 53.641″ N1° 43′ 50.558″ E
752° 07′ 19.811″ N1° 46′ 13.310″ E852° 06′ 47.705″ N1° 46′ 22.155″ E
952° 05′ 45.119″ N1° 47′ 48.934″ E1052° 04′ 21.240″ N1° 47′ 50.697″ E
1152° 03′ 00.375″ N1° 49′ 47.154″ E1252° 02′ 59.277″ N1° 50′ 58.902″ E
1352° 02′ 32.852″ N1° 51′ 36.901″ E1452° 01′ 50.815″ N1° 52′ 18.710″ E
1552° 01′ 30.601″ N1° 54′ 02.808″ E1652° 01′ 22.163″ N1° 54′ 18.345″ E
1752° 01′ 09.327″ N1° 54′ 17.298″ E1852° 01′ 05.147″ N1° 54′ 18.294″ E
1952° 00′ 59.527″ N1° 54′ 22.958″ E2052° 00′ 55.981″ N1° 54′ 29.281″ E
2152° 00′ 54.528″ N1° 54′ 33.851″ E2252° 00′ 53.496″ N1° 54′ 40.490″ E
2352° 00′ 52.133″ N1° 55′ 24.154″ E2451° 59′ 40.210″ N1° 58′ 21.019″ E
2551° 59′ 34.074″ N1° 58′ 21.796″ E2651° 59′ 59.611″ N1° 59′ 30.896″ E
2751° 59′ 30.066″ N2° 05′ 35.129″ E2851° 59′ 28.672″ N2° 05′ 37.951″ E
2951° 59′ 25.641″ N2° 05′ 44.985″ E3051° 59′ 22.901″ N2° 05′ 52.323″ E
3151° 59′ 20.463″ N2° 05′ 59.937″ E3251° 59′ 18.338″ N2° 06′ 07.792″ E
3351° 59′ 16.534″ N2° 06′ 15.855″ E3451° 59′ 15.059″ N2° 06′ 24.092″ E
3551° 59′ 13.920″ N2° 06′ 32.467″ E3651° 59′ 13.122″ N2° 06′ 40.945″ E
3751° 59′ 12.682″ N2° 06′ 49.050″ E3851° 59′ 12.329″ N2° 06′ 59.141″ E
3951° 58′ 56.293″ N2° 07′ 50.888″ E4051° 58′ 33.766″ N2° 08′ 44.666″ E
4151° 57′ 13.719″ N2° 08′ 44.383″ E4251° 55′ 37.835″ N2° 08′ 14.508″ E
4351° 53′ 42.962″ N2° 01′ 36.868″ E4451° 49′ 01.731″ N2° 01′ 29.385″ E
4551° 50′ 17.180″ N2° 06′ 34.867″ E4651° 45′ 40.117″ N2° 05′ 09.101″ E
4751° 43′ 22.529″ N1° 57′ 54.170″ E4851° 43′ 58.800″ N1° 56′ 18.600″ E
4951° 45′ 31.800″ N1° 52′ 27.415″ E5051° 46′ 51.579″ N1° 52′ 55.728″ E
5151° 47′ 45.600″ N1° 56′ 02.400″ E5251° 45′ 57.600″ N1° 54′ 59.040″ E
5351° 44′ 12.004″ N1° 56′ 09.764″ E5451° 44′ 03.295″ N1° 56′ 31.748″ E
5551° 45′ 14.400″ N2° 00′ 00.000″ E5651° 46′ 28.672″ N2° 00′ 00.000″ E
5751° 48′ 39.346″ N2° 00′ 00.000″ E5851° 48′ 48.664″ N2° 00′ 36.597″ E
5951° 53′ 27.719″ N2° 00′ 44.242″ E6051° 53′ 15.002″ N2° 00′ 00.138″ E
6151° 58′ 42.600″ N2° 00′ 00.138″ E6251° 58′ 42.616″ N1° 58′ 28.302″ E
6351° 58′ 42.616″ N1° 57′ 34.138″ E6451° 58′ 42.600″ N1° 56′ 02.667″ E
6551° 59′ 15.255″ N1° 57′ 30.906″ E6651° 59′ 22.686″ N1° 57′ 30.170″ E
6752° 01′ 01.179″ N1° 53′ 39.506″ E6852° 01′ 28.919″ N1° 51′ 16.683″ E
6952° 01′ 36.462″ N1° 50′ 37.798″ E7052° 02′ 03.097″ N1° 49′ 59.472″ E
7152° 04′ 08.838″ N1° 46′ 58.300″ E7252° 05′ 32.520″ N1° 46′ 56.527″ E
7352° 06′ 33.520″ N1° 45′ 32.604″ E7452° 07′ 04.673″ N1° 45′ 24.158″ E
7552° 08′ 35.786″ N1° 43′ 05.562″ E7652° 12′ 06.924″ N1° 40′ 45.328″ E
7752° 12′ 08.338″ N1° 40′ 38.374″ E7852° 12′ 09.091″ N1° 40′ 34.668″ E
7952° 12′ 10.453″ N1° 40′ 29.362″ E8052° 12′ 10.658″ N1° 40′ 28.945″ E
8152° 12′ 10.947″ N1° 40′ 27.617″ E8252° 12′ 11.334″ N1° 40′ 24.014″ E
8352° 12′ 11.585″ N1° 40′ 24.163″ E8452° 12′ 12.420″ N1° 40′ 20.735″ E
8552° 12′ 12.713″ N1° 40′ 19.698″ E8652° 12′ 12.978″ N1° 40′ 19.092″ E
8752° 12′ 13.722″ N1° 40′ 14.764″ E8852° 12′ 14.592″ N1° 40′ 11.316″ E
8952° 12′ 14.726″ N1° 40′ 09.601″ E9052° 12′ 16.655″ N1° 40′ 00.995″ E
9152° 12′ 18.548″ N1° 39′ 52.398″ E9252° 12′ 19.617″ N1° 39′ 47.867″ E
9352° 12′ 20.133″ N1° 39′ 44.145″ E9452° 12′ 21.264″ N1° 39′ 40.715″ E
9552° 12′ 22.455″ N1° 39′ 35.162″ E9652° 12′ 22.647″ N1° 39′ 34.805″ E
9752° 12′ 23.511″ N1° 39′ 30.442″ E9852° 12′ 24.413″ N1° 39′ 27.238″ E
9952° 12′ 24.629″ N1° 39′ 25.209″ E10052° 12′ 25.271″ N1° 39′ 21.684″ E
10152° 12′ 25.717″ N1° 39′ 20.525″ E10252° 12′ 26.377″ N1° 39′ 15.364″ E
10352°12′ 26.479″ N1° 39′ 14.852″ E10452° 12′ 26.591″ N1° 39′ 13.000″ E
10552° 12′ 26.726″ N1° 39′ 09.534″ E10652° 12′ 27.156″ N1° 39′ 04.787″ E
10752° 12′ 27.336″ N1° 39′ 03.952″ E10852° 12′ 27.378″ N1° 39′ 02.849″ E
10952° 12′ 27.503″ N1° 39′ 01.729″ E11052° 12′ 27.672″ N1° 38′ 59.184″ E
11152° 12′ 27.936″ N1° 38′ 56.895″ E11252° 12′ 27.980″ N1° 38′ 54.459″ E
11352° 12′ 28.226″ N1° 38′ 52.855″ E11452° 12′ 28.252″ N1° 38′ 51.642″ E
11552° 12′ 28.372″ N1° 38′ 51.228″ E11652° 12′ 28.438″ N1° 38′ 49.416″ E
11752° 12′ 28.801″ N1° 38′ 46.905″ E11852° 12′ 28.941″ N1° 38′ 44.288″ E
11952° 12′ 28.845″ N1° 38′ 39.122″ E12052° 12′ 28.858″ N1° 38′ 38.526″ E
12152° 12′ 28.608″ N1° 38′ 35.768″ E12252° 12′ 28.426″ N1° 38′ 34.235″ E
12352° 12′ 28.155″ N1° 38′ 33.195″ E12452° 12′ 27.765″ N1° 38′ 28.902″ E
12552° 12′ 27.466″ N1° 38′ 27.740″ E12652° 12′ 26.843″ N1° 38′ 23.551″ E
12752° 12′ 26.282″ N1° 38′ 18.752″ E12852° 12′ 25.310″ N1° 38′ 13.007″ E
12952° 12′ 25.249″ N1° 38′ 11.139″ E13052° 12′ 24.835″ N1° 38′ 08.881″ E
13152° 12′ 24.783″ N1° 38′ 08.123″ E13252° 12′ 24.514″ N1° 38′ 06.910″ E
13352° 12′ 24.191″ N1° 38′ 03.616″ E13452° 12′ 23.841″ N1° 38′ 01.335″ E
13552° 12′ 23.181″ N1° 37′ 57.957″ E13652° 12′ 22.595″ N1° 37′ 54.034″ E
13752° 12′ 22.177″ N1° 37′ 52.624″ E13852° 12′ 21.193″ N1° 37′ 47.365″ E
13952° 12′ 20.325″ N1° 37′ 42.850″ E14052° 12′ 19.615″ N1° 37′ 37.741″ E
14152° 12′ 19.710″ N1° 37′ 32.227″ E14252° 12′ 19.863″ N1° 37′ 28.535″ E
14352° 12′ 20.547″ N1° 37′ 22.637″ E14452° 12′ 20.572″ N1° 37′ 21.805″ E

(4) The substances or articles authorised for deposit at sea are—

(a)iron/steel;

(b)stone and rock;

(c)concrete;

(d)sand;

(e)plastic/synthetic; and

(f)material extracted from within the offshore Order limits during construction drilling.

3.  This licence shall remain in force until the authorised scheme has been decommissioned in accordance with a programme approved by the Secretary of State under section 106 of the 2004 Act(4), including any modification to the programme under section 108, and the completion of such programme has been confirmed by the Secretary of State in writing.

(3)