Regulation 4
Category of development for which approval is sought: Fee Payable | |
|---|---|
| 1. PLANS AND SPECIFICATIONS FOR THE FOLLOWING WORKS | |
A. (i) The erection, construction, alteration or extension of a building (including any transformer or telecommunications mast) excluding anything in C below (ii) The erection, construction, alteration or extension of any fences, walls or other barriers (including bunds) for visual or noise screening or dust suppression, or any other fences or walls (iii) The erection, construction or installation of lighting equipment | (a) Where no gross floor space is to be created by the development, £170; (b) where the area of gross floor space to be created by the development does not exceed 40 square metres, £170; (c) where the area of gross floor space to be created by the development exceeds 40 square metres but does not exceed 75 square metres, £335; (d) where the area of gross floor space to be created by the development exceeds 75 square metres but does not exceed 3750 square metres £335 for each 75 square metres or part thereof of that area; and (e) where the area of gross floor space to be created by the development exceeds 3750 square metres, £16,565 and an additional £100 for each 75 square metres or part thereof subject to a maximum of £250,000. |
| B. Where no gross floor space is to be created by the development | £170; |
| C. Construction, alteration or extension of any terracing, cuttings, embankments or other earth works. | £170 for each 0.1 hectares or part thereof of the site, subject to a maximum of £1,700. |
| D. The erection, construction, alteration or extension of a pedestrian access to the railway line. | £170 |
| E. The disposal of waste or spoil or the excavations of bulk materials from borrow pits. | £170 for each 0.1 hectare or part thereof of the site area, subject to a maximum of £25,500. |
| F. Additional Details Request | £85 |
| 2. CONSTRUCTION ARRANGEMENTS | |
| Road transport | £170 |
| Handling of re-usable spoil or top soil | £170 |
| Storage sites | £170 |
| Construction camps | £170 |
| Screening | £170 |
| Artificial lighting | £170 |
| Suppression of dust | £170 |
| Mud on highway | £170 |
| 3. BRINGING INTO USE | |
| Bringing into use works referred to in paragraph 9(3) or 17(3) of the Schedule. | £170 |
| 4. MITIGATION OR SITE RESTORATION SCHEMES | |
| Mitigation or site restoration schemes. | £170 |
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made):The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Explanatory Memorandum sets out a brief statement of the purpose of a Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Statutory Instrument accessible to readers who are not legally qualified accompany any Statutory Instrument or Draft Statutory Instrument laid before Parliament from June 2004 onwards.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:
Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:
Click 'View More' or select 'More Resources' tab for additional information including: