PART 2WORKS PROVISION
Power to survey and investigate land15
1
The undertaker may for the purposes of this Order and subject to subparagraph (2)—
a
survey or investigate any land which may be affected by the authorised works;
b
make trial holes on the land in such positions as the undertaker thinks fit to investigate the nature of the surface layer and subsoil and remove soil samples;
c
place on, leave on or remove from the land apparatus for use in connection with the survey or investigation of the land or making of trial holes; and
d
enter on the land for the purpose of exercising any of the powers conferred by sub-paragraphs (a) to (c) above.
2
Before exercising any of the powers conferred by subparagraph (1), the undertaker shall—
a
serve on every owner and occupier of the land a notice giving at least 7 days' notice of the proposal to exercise that power; and
b
obtain the consent of the street authority in respect of trial holes to be made in any carriageway or footway.
3
Any person entering land under this article on behalf of the undertaker—
a
shall, if so required before or after entering the land, produce written evidence of his authority to do so; and
b
may take with him such vehicles and equipment as are necessary to carry out the survey or investigation or to make the trial holes.
4
The undertaker shall compensate the owners and occupiers of the land for any damage occasioned by the exercise of the powers conferred by this article.
5
In the case of dispute, the compensation referred to in sub-paragraph (4) shall be determined under Part I of the 1961 Act.