xmlns:atom="http://www.w3.org/2005/Atom"

PART 2WORKS PROVISIONS

Principal powers

Power to deviate

6.  In constructing or maintaining any of the scheduled works, the Council may—

(a)deviate laterally—

(i)in respect of Work No. 5, to any extent not exceeding 6.5 metres in any direction from the centre line of that work shown on the works plans; and

(ii)in respect of any other scheduled work, from the lines or situations shown on the works plans, within the limits of deviation for that work shown on those plans; and

(b)deviate vertically from the levels shown on the sections—

(i)in respect of Work No. 5, to any extent upwards or downwards within the maximum height of 6 metres specified in the description of that Work in Schedule 1 to this Order; and

(ii)in respect of any other scheduled work, to any extent not exceeding 3 metres upwards and to any extent downwards.