The Docklands Light Railway (Silvertown and London City Airport Extension) Order 2002

What Version

 Help about what version
  • Latest available (Revised)
  • Original (As made)

Status:

This is the original version (as it was originally made). UK Statutory Instruments are not carried in their revised form on this site.

Articles 2(1) and (4)

SCHEDULE 1SCHEDULED WORKS

In the London Borough of Newham

  • Work No. 1—A railway (3,326 metres in length) commencing at a junction with the DLR Poplar to Beckton railway at a point 314 metres south of the centre of Canning Town DLR station platform, passing southwards under Work No. 5, through the existing underpass beneath the (A1020) Lower Lea Crossing, across the area known as the Thames Wharf site, over the Royal Albert and Victoria Docks Cut, then passing south-eastwards along the south-western side of North Woolwich Road, over Bell Lane, Fisons Road, Knights Road and Bradfield Road, then passing eastwards along the south side of North Woolwich Road over Barrier Park Road and Thames Road, then passing north-eastwards across North Woolwich Roundabout and the area known as the Silvertown triangle site, then passing eastwards over the Railtrack Stratford to North Woolwich railway, over Connaught Road, Work No. 16, Camel Road and Hartmann Road, and along the north side of Hartmann Road, then passing south-eastwards, over Hartmann Road again and terminating at a point 25 metres north of the junction of Drew Road and Leonard Street, adjacent to the terminal of London City Airport, including two lengths of viaduct, the first over the Jubilee Line tunnels at the Thames Wharf site (108 metres in length), commencing 437 metres south of the commencement of this work and terminating 545 metres south of the commencement of this work, the second (2,662 metres in length) commencing at a point 664 metres from the commencement of this work and terminating at the termination point of this work.

  • Work No. 2—A railway (442 metres in length) being a realignment of the tracks of part of the DLR Poplar to Beckton railway, commencing at a junction with that railway at a point 226 metres south of the centre of Canning Town DLR station platform, passing southwards under Work No. 5, then south-eastwards and terminating at a junction with that railway at a point 1 metre east of the centre of the viaduct carrying Silvertown Way over that railway.

  • Work No. 3—A railway (1,023 metres in length) commencing at a junction with Work No. 1 at its point of termination, passing south-eastwards across Hartmann Road and then passing eastwards along the north side of Newland Street and Brixham Street and terminating at a point 40 metres north-east of the junction of Pier Road and Claremont Close, including a viaduct across Works Nos. 20 and 21.

  • Work No. 4—An access road (139 metres in length) commencing at a new junction with the eastbound carriageway of the (A1020) Lower Lea Crossing 280 metres north-west of the Lower Lea Roundabout, passing northwards and terminating at a point 139 metres north of its commencement, together with a turning head at the point of its termination.

  • Work No. 5—A reconstruction of the existing London Underground Jubilee Line footbridge over the Poplar to Beckton railway 385 metres south of the centre of Canning Town DLR station platform, to carry that footbridge over Works Nos. 1 and 2, commencing at a point 24 metres south of the termination of Work No. 4 and terminating 25 metres east of its commencement, adjacent to the facility known as the Jubilee Line portal plant building.

  • Work No. 6—An access road (152 metres in length) commencing at a junction on the Lower Lea Crossing 59 metres north-west of the Lower Lea roundabout passing north-eastwards and then north-westwards and terminating at a point 152 metres north-west of its commencement, adjacent to the facility known as the Jubilee Line access shaft, together with a turning head at the point of termination.

  • Work No. 7—An access road for the proposed Thames Wharf Station (212 metres in length) commencing at a junction with Dock Road 36 metres south-west of the Lower Lea Roundabout passing south-westwards under Work No. 1, then passing south-eastwards and terminating at a point 212 metres south of its commencement, together with a turning head at the point of termination.

  • Work No. 8—An access road (111 metres in length) being a realignment of the existing access road between Dock Road and Thames Wharf, commencing at its existing junction with Dock Road, passing south-westwards under Work No. 1 and terminating at a point 111 metres south-west of its commencement.

  • Work No. 9—An access road (82 metres in length) being a realignment of the existing access road between Dock Road and the north-west side of the area currently known as the former Barge Lock, commencing at its junction with Dock Road, passing south-westwards under Work No. 1 and terminating at a point 82 metres from its commencement.

  • Work No. 10—An access road (51 metres in length) being a realignment of the existing access road between North Woolwich Road and the south-east side of the area currently known as the former Barge Lock, commencing at its junction with North Woolwich Road passing south-westwards under Work No. 1 and terminating 51 metres south-west of its commencement.

  • Work No. 11—A cycle track and footway (86 metres in length) being a realignment of the existing cycle track and footway, commencing at a junction with the east side of Knights Road 17 metres south of the centre of North Woolwich Road, passing eastwards along the south side of North Woolwich Road and terminating at a junction with the west side of Bradfield Road 13 metres south of the centre of North Woolwich Road.

  • Work No. 12—A cycle track and footway (418 metres in length) being a realignment of the existing cycle track and footway, commencing at a junction with the east side of Bradfield Road 13 metres south of the centre of North Woolwich Road and terminating at a junction with the west side of Barrier Park Road, 13 metres south of the centre of North Woolwich Road.

  • Work No. 13—A road (125 metres in length) being a realignment of Barrier Park Road commencing at a junction with that road at a point 50 metres south-east of its junction with North Woolwich Road, passing eastwards under Work No. 1 and terminating at a junction with the Barrier Park car park at a point 125 metres east of its commencement.

  • Work No. 14—A cycle track and footway (152 metres in length) being a realignment of the existing cycle track and footway, commencing at a junction with the east side of Barrier Park Road, 13 metres south of the centre of North Woolwich Road, passing eastwards and terminating at a junction with the existing cycle track and footway 135 metres east of Barrier Park Road.

  • Work No. 15—A road (496 metres in length) being a realignment and improvement of Hartmann Road, commencing at a junction with Connaught Road at a point 24 metres south-east of the junction between Camel Road and Connaught Road, passing north-eastwards over Camel Road, then eastwards and terminating at a junction with Hartmann Road 20 metres north-east of the junction between Drew Road and Leonard Street, adjacent to the terminal of London City Airport.

  • Work No. 16—An access road (44 metres in length) being a realignment and extension of the existing access road to the facility known as the London City Airport fuel farm, commencing at a junction with Work No. 15 at a point 43 metres north-east of the commencement of Work No. 15, passing north-westwards across Camel Road and passing under Work No. 1 and terminating at a junction with the existing access road 44 metres north-west of its commencement at the gates to the fuel farm.

  • Work No. 17—A road (25 metres in length) to connect Camel Road with Work No. 15, commencing at a junction with Work No. 15 at a point 103 metres from the commencement of Work No. 15, passing south-eastwards and terminating at a junction with Camel Road 25 metres south-east of its commencement.

  • Work No. 18—A road (119 metres in length) being a realignment of Hartmann Road, commencing at a junction with Hartmann Road at a point 82 metres east of the roundabout at the junction of Hartmann Road and Connaught Road, passing south-eastwards and terminating at a junction with Work No. 15 at a point 140 metres north-east of the junction between Work No. 15 and Connaught Road.

  • Work No. 19—A road (43 metres in length) commencing at a junction with Work No. 15 at a point 384 metres east of the junction between Work No. 15 and Connaught Road, passing north-eastwards under Work No. 1 and terminating at a junction with Hartmann Road 43 metres north-east of its junction with Work No. 15.

  • Work No. 20—A road (306 metres in length) being a realignment of the extension of Hartmann Road, commencing at a junction with Work No. 15 at its termination point, passing south-eastwards under Work No. 3, then passing eastwards and terminating at a junction with the extension of Hartmann Road 55 metres north-west of the junction between Newland Road and Kennard Street, adjacent to the London City Airport car park entrance.

  • Work No. 21—An access road (43 metres in length) being a realignment and extension of the existing access road for the facility known as the London City Airport remote plant room, commencing at a junction with Work No. 20 at a point 77 metres south-east of the junction between Work No. 15 and Work No. 20, passing south-westwards under Work No. 3 and terminating at a junction with the existing access road 43 metres south-west of its junction with Work No. 20.

  • Work No. 22—A footway (145 metres in length) commencing at a junction with Parker Street, at a point 67 metres north of the junction of Parker Street and Drew Road, passing south eastwards and terminating at a point 17 metres north-east of the junction of Saville Road and Drew Road, including a ramped footway from its point of commencement up to the realigned and improved Hartmann Road (Work No. 15).

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made):The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources