Article 2(2)
The works referred to in this Order and shown on the deposited plan marked “The West of Scotland Water Authority (Loch Lossit, Islay) (Amendment) Water Order 1998, Plan of Catchment Area, Location Plan, Plan and Section of Works” are–
| Works 1 | An intake pipe 40 metres or thereby in length situated on the northern shore with the intake and loch level gauge-board located some 100 metres south-west of the burn discharging from the loch. |
| Works 2 | A treatment works containing an approved gauge and instru mentation to measure and record the amount of water taken from the loch. |
| Works 3 | A discharge pipe 74 metres or thereby in length to convey the treatment works reject stream to the outfall located at a point on the burn some 68 metres or thereby downstream of Loch Lossit. |