Regulation 2(1)

SCHEDULE 13(Annex XIV to the Lifts Directive)PRODUCTION QUALITY ASSURANCE(module D)

1.  Production quality assurance is the procedure whereby the installer of a lift who satisfies the obligations of Section 2 ensures and declares that the lifts satisfy the requirements of the Directive that apply to them. The installer of the lift must affix the CE marking to each lift and draw up a written declaration of conformity. The CE marking must be accompanied by the identification symbol of the notified body responsible for surveillance as specified in Section 4.

2.  The installer of the lift must operate an approved quality assurance system for production, installation, final lift inspection and testing as specified in Section 3 and is subject to surveillance as specified in Section 4.

3.    Quality assurance system

(3.1) The installer must lodge an application for assessment of his quality assurance system with a notified body of his choice. The application must include:

(3.2) The quality assurance system must ensure compliance of the lifts with the requirements of the Directive that apply to them.

(3.3) The notified body must assess the quality assurance system to determine whether it satisfies the requirements referred to in Section 3.2. It presumes conformity with these requirements in respect of quality assurance systems that implement the relevant harmonized standard(2).

(3.4) The installer must undertake to discharge the obligations arising from the quality assurance system as approved and to ensure that it is maintained in an appropriate and efficient manner.

4.    Surveillance under the responsibility of the notified body

(4.1) The purpose of surveillance is to make sure that the installer duly fulfils the obligations arising out of the approved quality assurance system.

(4.2) The installer must allow the notified body access for inspection purposes to the manufacture, inspection, assembly, installation, testing and storage locations and must provide it with all necessary information, in particular:

(4.3) The notified body must periodically carry out audits to make sure that the installer maintains and applies the quality assurance system and must provide an audit report to the installer.

(4.4) Additionally the notified body may pay unexpected visits to the installer. During such visits the notified body may carry out, or cause to be carried out, tests to verify that the quality assurance system is functioning correctly, if necessary. The notified body must provide the installer with a visit report and, if a test has taken place, with a test report.

The installer must, for a period of 10 years after the last lift has been manufactured, keep at the disposal of the national authorities:

Each notified body must give the other notified bodies the relevant information concerning the quality assurance system approvals issued and withdrawn.

Documentation and correspondence relating to the production quality assurance procedures shall be drawn up in an official language of the Member State in which the notified body is established or in a language acceptable to it.

(1)

These tests include at least the tests provided for in Annex VI, Section 4(b).

(2)

This harmonised standard will be EN 29002, supplemented where necessary to take account of the specific nature of the lifts.