Search Legislation

The West of Scotland Water Authority (Dervaig-River Bellart) Water Order 1997

What Version

 Help about what version
  • Latest available (Revised)
  • Original (As made)

Status:

This is the original version (as it was originally made). UK Statutory Instruments are not carried in their revised form on this site.

Article 2

SCHEDULE 1

The works referred to in this Order and shown on the deposited plan marked “The West of Scotland Water Authority (Dervaig-River Bellart) Water Order 1997 Plan of Catchment Area, Location Plan and Plans and Sections of Works No 1” are–

Works No 1An intake structure incorporating pumps, intake and scour pipework, an approved gauge board and weir to measure the specified flow in the River Bellart and an approved gauge to measure and record the amount of water taken from the river and the rate at which the said amount was taken.

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made):The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once