- Latest available (Revised)
- Original (As made)
This is the original version (as it was originally made). UK Statutory Instruments are not carried in their revised form on this site.
Regulation 3(5)(b)
1. The requirements of Schedule 8 shall not apply to any transportable pressure receptacle which—
(a)forms part of the equipment of—
(i)any ship to which the Merchant Shipping Act 1995(1) applies or would apply if the ship was registered in Great Britain,
(ii)any ship or other vessel in the service of the Crown, or
(iii)any spacecraft, aircraft, hovercraft or hydrofoil;
(b)forms part of, or is intended to form part of, a weapons system;
(c)(i)is the subject of a research experiment, or
(ii)comprises temporary apparatus being used in a research experiment, if it is not reasonably practicable to comply with paragraph 2 of Schedule 8;
(d)is refillable and has an internal volume of less than 0.5 litres or more than 5000 litres; or
(e)contains a gas at a pressure of less than 0.5 bar above atmospheric pressure.
2. The requirements of Schedule 8 (other than paragraph 5(4) thereof) shall not apply to any non-refillable transportable pressure receptacle which has an internal volume of less than 1.4 litres or more than 5 litres.
3. Paragraphs 3, 4, 5(1)(a) and 10(1) of Schedule 8 shall not apply to a transportable pressure receptacle which—
(a)is a refillable receptacle;
(b)is used solely for containing liquefied petroleum gas; and
(c)has a water capacity up to and including 6.5 litres.
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made):The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.