Search Legislation

The Radioactive Material (Road Transport) (Great Britain) Regulations 1996

What Version

 Help about what version
  • Latest available (Revised)
  • Original (As made)

Status:

This is the original version (as it was originally made). UK Statutory Instruments are not carried in their revised form on this site.

Regulation 20(2)

SCHEDULE 26Application for package design approval certificate for a Type B(M) package

An application for a package design approval certificate for a Type B(M) package design shall include the following:

1.  The information required in Schedule 25 for Type B(U) packages.

2.  A list of the specific requirements for Type B(U) packages specified in paragraph 1 of Schedule 13, with which the package does not conform.

3.  Any proposed supplementary operational controls to be applied during transport not routinely provided for in these Regulations, but which are necessary to ensure the safety of the package or to compensate for the deficiencies listed in paragraph 2 above, such as human intervention for temperature or pressure measurements or for periodic venting, taking into account the possibility of unexpected delay.

4.  A statement relative to any restrictions on the mode of transport and to any special loading, carriage, unloading or handling procedures.

5.  The maximum and minimum ambient conditions (temperature, solar radiation) expected to be encountered during transport and which have been taken into account in the design.

6.  Evidence of a suitable emergency plan.

Back to top

Options/Help

Print Options

You have chosen to open The Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Instrument as a PDF

The Whole Instrument you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Instrument

The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules only you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made):The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once