Regulation 19(2)
An application for a package design approval certificate for a Type B(U) package shall include the following:
1. A detailed description of the proposed radioactive contents with particular reference to their physical and chemical states and the nature of the radiation emitted.
2. A detailed statement of the design, including complete engineering drawings and schedules of materials and methods of construction to be used.
3. A statement of the tests which have been done and their results, or evidence based on calculative methods or other evidence that the design is adequate to meet the applicable requirements of these Regulations.
4. The proposed operating and maintenance instructions for the use of the packaging.
5. If the package is designed to have a maximum normal operating pressure in excess of 100 kPa gauge, the application for approval shall, in particular, state, in respect of the materials of construction of the containment system, the specifications, the samples to be taken, and the tests to be made.
6. Where the proposed radioactive contents are irradiated fuel, the applicant shall state and justify any assumption in the safety analysis relating to the characteristics of the fuel.
7. Any special stowage provisions necessary to ensure the safe dissipation of heat from the package; consideration shall be given to the various modes of transport to be used and type of conveyance or freight container.
8. A reproducible illustration not larger than 21 cm×30 cm showing the make-up of the package.
9. Evidence of a quality assurance programme as required by regulation 24.
10. Evidence of a suitable emergency plan.
The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Whole Instrument you have selected contains over 200 provisions and might take some time to download.
Would you like to continue?
The Whole Instrument you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.
Would you like to continue?
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include: