From a point north of the centre-line of the Bridgewater Canal in the Borough of Trafford, 16 metres east of the south eastern corner of the Liverpool Warehouse and 38 metres west southwest of the north western corner of the White City Newsagency. To a point south of the centre-line of the Bridgewater Canal 20 metres south east of the south eastern corner of the Liverpool Warehouse and 44 metres south west of the north western corner of the White City Newsagency.
Precast, prestressed concrete beams on masonry faced abutments.
14.8 metres (approximately) clear span square to the centre-line of the Bridgewater Canal, 15.0 metres (approximately) skew length between abutments.
Overall width of 20.7 metres (approximately), comprising 7.0 metres carriageway (2 × 3.5 metre lanes) and 2 × footways/verges with minimum width of 2.5 metres each.
4.15 metres minimum headroom above Bridgewater Canal water level.
The existing north canal bank and towpath will be retained. A new southern canal bank retaining wall is proposed to be constructed in front of the existing canal bank over a length of 148 metres and will link the West Canal Bridge with the East Canal Bridge.This would have the effect of reducing the minimum waterway width from 12.5 metres to 9.5 metres.
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.
Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include: