- Latest available (Revised)
- Original (As made)
This is the original version (as it was originally made). UK Statutory Instruments are not carried in their revised form on this site.
Article 2
| (1) Name or other designation of the offshore Installation | (2) Latitude | (3) Longitude |
|---|---|---|
| Fife Field Wellhead 1 | 56° 00' 10.45"N | 03° 11' 05.55"E |
| Fife Field Wellhead 2 | 56° 00' 34.39"N | 03° 11' 36.20"E |
| Birch Field Manifold | 58° 34' 52.00"N | 01° 15' 40.00"E |
| Nevis Field Wells | 59° 31' 56.07"N | 01° 24' 25.45"E |
| KT Well | 59° 34' 04.43"N | 01° 28' 51.80"E |
| South Scott Manifold | 58° 14' 54.91"N | 00° 10' 45.52"E |
| Foinaven Drilling Centre 1 | 60° 18' 39.8"N | 04° 20' 15.9"W |
| Foinaven Drilling Centre 2A | 60° 20' 37.5"N | 04° 14' 43.2"W |
| Foinaven DC2 West Water Injection | 60° 20' 55.2"N | 04° 17' 35.1"W |
| Foinaven DC2 East Water Injection | 60° 19' 25.8"N | 04° 12' 47.008"W |
| Liverpool Bay Pipeline End Manifold | 53° 41' 0.115"N | 03° 32' 42.974"W |
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made):The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.