1. This Scheme may be cited as the M1-A1 Link (Belle Isle to Bramham Crossroads Section and Connecting Roads) Scheme 1994 and shall come into force on 29th April 1994.
2. In this Scheme:
(a)all measurements of distance are measured along the route of the relevant highway;
(b)except in article 3 of this scheme, a reference to a numbered Schedule or plan is a reference to the Schedule to this Scheme or to the plan, so numbered;
(c)(i)“connecting road” means a special road along the routes described in Schedule 3;
(ii)“the Motorway” means a special road along the routes described in Schedule 1;
(iii)“plan” means one of the plans numbered 1 to 3 and contained in the plan folio numbered HA16/YHCPD10 marked “The M1-A1 Link (Belle Isle to Bramham Crossroads Section and Connecting Roads) Scheme 1994”, signed by authority of the Secretary of State for Transport and deposited at the Department of Transport, Romney House, 43 Marsham Street, London SW1P 3PY;
(iv)“the special roads” means the Motorway, each link road, each connecting road and the A1(M);
(v)“link road” means a special road along a route described in Schedule 2;
(vi)“the A1” means the A1 Trunk Road; and
(vii)“the A1(M)” means the length of the A1 described in Schedule 4.
3. The Secretary of State is authorised to provide the special roads for the exclusive use of traffic of Classes I and II of the classes of traffic set out in Schedule 4 to the Highways Act 1980.
4. The centre line of each of the special roads is indicated by a heavy black line on the plan.
5. Each of the special roads described in Schedules 1, 2 and 3 shall become a trunk road on the date when this Scheme comes into force.
6. The Secretary of State is authorised to construct the bridge specified in Schedule 5 as part of the Motorway and in connection with the construction of that bridge to divert the part of the navigable watercourse specified in that schedule and the towing path adjacent to that part as shown in that schedule.
Signed by authority of the Secretary of State for Transport
J. P. Henry
Regional Director Yorkshire and Humberside Region
Department of Transport
30th March 1994
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made):The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.