23. Subject to the provisions of this Order, the Council may in the lines and situations and within the limits of deviation shown on the deposited plan and according to the levels shown on the deposited sections, construct, execute and maintain the works hereinafter described, with all necessary works and conveniences connected therewith, in the Coll Electoral Division, parish of Stornoway on the island of Lewis in the Western Isles Islands Area–
Work No.1
The construction at Brevig of a harbour comprising a rectangular tidal basin commencing at a point at NB48265 39003 and extending in a generally south-south-easterly direction for a distance of 50 metres to a point at NB48300 38950 and there terminating, having a width of 30 metres, by excavation from solid rock bounded on its northern, eastern and southern sides and partially on its western side by concrete lined walls.
Work No.2
An access channel excavated from the foreshore and seabed to provide access for vessels between the sea and the harbour (Work No.1), commencing at a point at NB48285 38929 and extending in a northerly direction for a distance of 80 metres to a point at NB48290 39000, thence in a generally north-north-easterly direction for a distance of 8 metres to a point at NB48295 38995 and there terminating.
Work No.3
A vehicle parking and storage area of solid construction and of irregular shape, partially on the foreshore and partially on land adjacent thereto lying westward of Work No.1, commencing at a point at NB48215 38965 and extending in a generally east-north-easterly direction for a distance of 90 metres to a point at NB48265 39015 and there terminating, having a maximum width of 80 metres and a minimum width of 30 metres and surrounded on its seaward face by a rock-armoured slope.
Work No.4
A slipway of solid construction 4 metres wide commencing at a point at NB48270 38975 on the southern side of Work No.3 and extending in a generally south-south-easterly direction for a distance of 20 metres to a point at NB48280 38965 and there terminating.
24. Subject to the provisions of this Order the Council may, within the limits of deviation, renew, replace, or otherwise alter temporarily or permanently the works.
25. Subject to the provisions of this Order, in the construction or execution of the works the Council may deviate laterally from the lines or situations thereof shown on the deposited plan to the extent of the limits of deviation, and may deviate vertically from the levels shown on the deposited sections to any extent not exceeding 3 metres.
26. Subject to the provisions of this Order the Council for the purposes of or in connection with the works may within the limits of deviation construct, execute and maintain all such subsidiary or incidental works and conveniences as may be necessary or expedient for or in connection with those works.
27. So much of any work constructed or placed pursuant to this Order as is not within the Western Isles Islands Area shall be deemed for all purposes to be within that Area.