| I. Operations |
1. The erection of dwellinghouses (other than development within category 5).
| Where the application is for–
(a) outline planning permission, £92 for each 0.1 hectare of the site area, subject to a maximum of £2,300; or for one dwellinghouse £92;
(b) Other than outline planning permission, £92 for each dwellinghouse to be created by the development, subject to a maximum of £4,600.
|
2. The erection of buildings (other than buildings coming within category 1, 3 or 5).
| Where the application is for–
(a) outline planning permission, £92 for each 0.1 hectare of the site area, subject to a maximum of £2,300;
(b) other than outline planning permission–
(i) where no floor space is to be created by the development, £46;
(ii) where the area of gross floor space to be created by the development does not exceed 40 square metres, £46;
(iii) where the area of gross floor space to be created by the development exceeds 40 square metres but does not exceed 75 square metres, £92; and
(iv) where the area of gross floor space to be created by the development exceeds 75 square metres, £92 for each 75 square metres, subject to a maximum of £4,600.
|
3. The erection on land used for the purposes of agriculture, of those buildings excluded by virtue of sub-paragraph (c) in paragraph (1) of class V in Schedule 1 to the General Development Order from that class.
| (a)Where the application is for outline planning permission, £92 for each 0.1 hectare of the site area, subject to a maximum of £2,300;
(b)In all other cases–
(i)where the area of gross floor space to be created by the development does not exceed 465 square metres, nil;
(ii)where the area of gross floor space to b e created by the development exceeds 465 square metres but does not exceed 540 square metres, £92;
(iii)where the area of gross floor space to be created by the development exceeds 540 square metres, £92 for the first 540 square metres and £92 for each 75 square metres in excess of that figure subject to a maximum of £4,600.
|
4. The erection, alteration or replacement of plant or machinery.
| £92 for each 0.1 hectare of the site area, subject to a maximum of £4,600. |
5. The enlargement, improvement or other alteration of existing dwellinghouses.
| (a)Where the application relates to one dwellinghouse, £46;
(b)where the application relates to 2 or more dwellinghouses, £92.
|
6.—(a) The carrying out of operations, including the erection of a building, within the curtilage of an existing dwellinghouse, for purposes ancillary to the enjoyment of the dwellinghouse as such;
(b)the erection or construction of gates, fences, walls or other means of enclosure along a boundary of the curtilage of an existing dwellinghouse; or
(c)the construction of car parks, service roads and other means of access on land used for the purposes of a single undertaking, where the development is required for a purpose incidental to the existing use of the land.
| £46 |
7. The carrying out of any operations connected with exploratory drilling for oil or natural gas.
| £92 for each 0.1 hectare of the site area, subject to a maximum of £6,900. |
8. The carrying out of any operations not within categories 1 to 7.
| In the case of operations for–
(a) the winning and working of minerals, £46 for each 0.1 hectare of the site area, subject to a maximum of £6,900;
(b) the winning and working of peat, £46 for each hectare of the site area, subject to a maximum of £690;
(c) any other purpose, £46 for each 0.1 hectare of the site area, subject to a maximum of £460.
|
| II. Uses of Land |
9. The change of use of a building to use as one or more separate dwellinghouses.
| £92 for each additional dwellinghouse to be created by the development, subject to a maximum of £4,600. |
10—(a) The use of land for the disposal of refuse or waste materials or for the deposit of material remaining after minerals have been extracted from land: or
(b)the use of land for the storage of minerals in the open.
| £46 for each 0.1 hectare of the site area, subject to a maximum of £6,900. |
11. The making of a material change in the use of a building or land, other than a material change of use within category 9 or 10.
| £92 |
12. The continuance of a use of land, or the retention of buildings or works on land, without compliance with a condition subject to which a previous planning permission has been granted, including a condition requiring the discontinuance of the use or the removal of the building or works at the end of a specified period.
| £46.” |