- Latest available (Revised)
- Original (As made)
This is the original version (as it was originally made). UK Statutory Instruments are not carried in their revised form on this site.
1.The new highways which the Secretary of State proposes to...
4.The Secretary of State is authorised to construct the bridge...
5.In this Order:– (i) “the deposited plan” means the plan...
ROUTE OF THE MAIN NEW TRUNK ROAD
The route of the main new trunk road is a...
1.Four routes to connect the north-eastbound carriageway and the south-westbound...
2.Four routes to connect the north-eastbound carriageway and the south-westbound...
3.Four routes to connect the north-eastbound carriageway and the south-westbound...
4.A roundabout numbered 16 on the deposited plan approximately 414...
6.A roundabout numbered 18 on the deposited plan approximately 165...
Point of Commencement: a point on the west bank of...
Point of Termination: a point on the east bank of...
Headroom: not less than 3.8 metres above normal navigation level...
Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.
Original (As Enacted or Made):The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.