2.  The Town and Country Planning (Assessment of Environmental Effects) Regulations 1988(1) shall be amended by substituting for paragraph (1)2 of Schedule 1 the following–

2. (a) A thermal power station or other combustion installation with a heat output of 300 megawatts or more (not being an installation falling within paragraph (b)); and

(b)A nuclear power station or other nuclear reactor (excluding a research installation for the production and conversion of fissionable and fertile materials, the maximum power of which does not exceed 1 kilowatt continuous thermal load)..

(1)

S.I. 1988/1199, to which there is an amendment not relevant to these Regulations.