1.The new highway which the Secretary of State proposes to...
5.The Secretary of State is authorised to construct the bridge...
6.The Secretary of State is authorised to construct the bridge...
7.In this Order:— (1) all measurements of distance are measured...
The route of the new trunk road is at Whitchurch...
LENGTHS OF THE TRUNK ROAD CEASING TO BE TRUNK ROAD
The A41 (which includes Heath Road (part) Prees Road, Sedgeford,...
Points of comencement and Termination
Toa point 102 metres east of the boundary between fields...
Headroom(Canal) not less than 2.6 metres above normal canal retention...
Headroom(North Bank) not less than 2.2 metres above bank, to...
Headroom(South Bank) not less than 2.4 metres above bank to...
Waterwaywidth of canal is reduced to 6.0 metres at water...
Length of Watercourse to be Diverted
Length of Towing Path to be Diverted and New Length...
Points of comencement and Termination
Toa point 294 metres south-east of the existing Dansons Bridge....
Headroom(Canal) not less than 2.6 metres above normal canal retention...
Headroom(North Bank) not less than 3.0 metres above bank to...
Headroom(South Bank) not less than 2.6 metres above bank to...
Waterwaywidth of canal is reduced to 6.0 metres at water...
Length of Watercourse to be Diverted
Length of Towing Path to be Diverted and New Length to be Provided