xmlns:atom="http://www.w3.org/2005/Atom"

Design etc

8.  Every such plan and section shall show the land covered or to be covered by the refuse to be deposited, the designed height for the time being of the tip, the designed contours and boundaries for the time being of the tip and the nature and location of the types of refuse deposited at the tip up to a date not more than fifteen months past or such other date as an inspector may require in any particular case.