High Speed Rail (London - West Midlands) Act 2017

Status:

This is the original version (as it was originally enacted).

Section 4(2)

SCHEDULE 5Acquisition of land for particular purposes

This schedule has no associated Explanatory Notes

The purposes for which land specified in the following table may be acquired under section 4(1) include (but are not limited to) the purpose specified in relation to that land in the third column of the table.

AreaNumber of land shown on deposited plansPurpose for which land may be acquired or used
London Borough of Camden4, 13, 79a, 99Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
68, 69, 93, 162, 163, 236, 369, 401 to 411, 508, 522, 665, 704, 721, 724, 727, 750, 791, 792, 794 to 796, 801 to 805, 807 to 811, 901, 912, 978, 1017, 1051Diversion or installation of, or works to, utilities apparatus
78, 110, 816, 817, 819, 820, 822, 829, 834, 847, 848, 849, 852, 854, 855, 856, AP3-22Provision of worksite and access for construction
140a, 142Provision of worksite and access for construction
Diversion or installation of, or works to utilities apparatus
Installation of ground anchors
90, 151 to 154, 157, 159, 177, 180, 181Installation of ground anchors
363Provision of electricity supply system and access
434Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
AP3-5Provision of environmental mitigation
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
London Borough of Brent28, 29, 48, 50, 55, 58, 78, 87, 185, 374, AP4-13 to AP4-15Diversion or installation of, or works to, utilities apparatus
53a, 54a, AP4-6, AP4-10Provision of worksite and access for construction
Royal Borough of Kensington & Chelsea1 to 3Provision of worksite and access for construction
Provision and renewal of railway systems for operational purposes and drainage
16, 19Diversion or installation of, or works to, utilities apparatus
London Borough of Hammersmith & Fulham5, 6, 50c, 67, AP4-3, AP4-7, AP4-9 to AP4-11Provision of worksite and access for construction
12, 13, 21a, 22c, 22e, 28, 29, 37, 48, 50a, 50b, 63, 66, 71, 73, 75, 76Diversion or installation of, or works to, utilities apparatus
77Provision of environmental mitigation
AP4-1Provision of worksite and access for construction and maintenance
London Borough of Ealing5, 7, 8, 9, 12, 13, 29, 30, 118a, 120a, 124a, 124b, 132, 156, 223, 229, 233, 265, 562, 787a, 788 to 790, 946 to 949Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
20, 21, 35, 36, 40, 41, 44, 45, 48, 49, 52, 53, 56, 57, 60, 61, 64, 65, 68, 69, 72, 73, 76, 77, 80, 81, 84, 125a, 125b, 126, 127a, 127b, 142 to 144, 145a, 152 to 154, 155a, 155b, 190, 193, 194, 196, 200, 202, 204 to 206, 209, 214, 216 to 219, 221, 222, 228, 231, 232, 235, 237, 240, 242, 251, 254 to 257, 259, 267, 269, 271, 272, 274, 277, 282 to 289, 438, 439, AP2-13, AP2-15, AP2-17, AP2-21, AP4-8, AP4-10, AP4-16, AP4-17Provision of worksite and access for construction
103, 106Provision of worksite and access for construction
Provision and renewal of railway systems for operational purposes and drainage
Diversion or installation of, or works to, utilities apparatus
119, 121, 150, 151, 157, 158, 165Provision of worksite and access for construction
Reinstatement of businesses or facilities
Diversion or installation of, or works to, utilities apparatus
133 to 139, 295, 297, 298, 314, 315, 322 to 324, 396, 406, 408, 445, 456 to 461, 471, 579, 580, 716, 770, 771, 798, 799, 805 to 807, 842 to 844, 849, 867, 898, 922, 925, 926, 942, 944, 945, 957 to 964, 973 to 975, 977, 985, 987, AP2-25, AP2-26Diversion or installation of, or works to, utilities apparatus
213Provision and renewal of railway systems for operational purposes and drainage
454Provision of worksite and access for construction and maintenance
Diversion or installation of, or works to, utilities apparatus
AP4-1Reinstatement of businesses or facilities
London Borough of Hillingdon1 to 16, 26 to 28, 39, 40, 68, 84, 85, 106, 107, 128 to 139, 175, 176, 190, 202, 203, 219, 224, 229 to 239, 371, 384, 387, 390, 447, 449, 452, 454, 463a, 464a, 476, 477, 478a, 492a, 522, 523, 523a, AP5-1b, AP5-2 to AP5-14Diversion or installation of, or works to, utilities apparatus
25, 441, 442, 458, 459, 469, 471, 483a, 484, 485, 494 to 496, 537, AP4-20, AP4-25, AP4-27 to AP4-29, AP4-33 to AP4-39Provision of environmental mitigation
25a, 470, 494bProvision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
50, 51Provision of access for construction and maintenance of utility diversions
101 to 103, 420, 422, 423, 426, 427 to 429, 466a, 467, 482, 487, 488, 502, 504, 506, AP4-12, AP4-13, AP4-15, AP4-16Provision of worksite and access for construction and maintenance
Diversion or installation of, or works to, utilities apparatus
377, 379, 411, 414, 415, 535Provision of worksite and access for construction
412, 413, 416 to 419, AP4-26Provision of worksite and access for construction and maintenance
424, 425, 460, 536, 540, AP4-17 to AP4-19Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
465a, 511Provision of environmental mitigation
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
474Provision of worksite and access for construction and maintenance
Provision of environmental mitigation
496a, 498, 499, 526 to 534Provision of worksite and access for construction and maintenance
Provision of environmental mitigation
Diversion and installation of overhead electric lines
501, 507Diversion and installation of overhead electric lines
Provision of worksite and access for construction and maintenance
Diversion or installation of, or works to, utilities apparatus
510, AP4-21Provision of worksite and access for construction
Provision of environmental mitigation
545Diversion and installation of overhead electric lines
Provision of worksite and access for construction and maintenance
548, 550, 556 to 558, 563, AP2-1Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
Diversion and installation of overhead electric lines
562Provision of worksite and access for construction
Diversion and installation of overhead electric lines
564, 590b, AP2-3, AP2-4Diversion and installation of overhead electric lines
606, 614, 615, 618Provision of worksite and access for construction and maintenance
Provision and renewal of railway systems for operational purposes and drainage
Provision of new public right of way
Diversion and installation of overhead electric lines
Diversion or installation of, or works to, utilities apparatus
611, 613Provision of worksite and access for construction and maintenance
Provision and renewal of railway systems for operational purposes and drainage
Provision of new public right of way
Diversion or installation of, or works to, utilities apparatus
612Provision of worksite and access for construction and maintenance
Provision and renewal of railway systems for operational purposes and drainage
Diversion or installation of, or works to, utilities apparatus
616Provision of worksite and access for construction and maintenance
Provision and renewal of railway systems for operational purposes and drainage
Diversion or installation of, or works to, utilities apparatus
Diversion and installation of overhead electric lines
496, 654, 655Provision of environmental mitigation
Provision of flood mitigation measures
496a, 498Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
Diversion and installation of overhead electric lines
557, 560, 561, 570 to 580, 583, 584, 588, 590, 591, 593, 594, 707, 714, 719, 720cDiversion and installation of overhead electric lines
558Provision of worksite and access for construction and maintenance
Diversion and installation of overhead electric lines
565Diversion and installation of overhead electric lines
Provision of electricity supply system and access
566 to 568Provision of access for construction and maintenance of utility diversions
Provision of electricity supply system and access
603, 604, 643 to 645, 657 to 659, 665, 683, 693, 694, 698a, 720d, 723, 724, 728, 729, 736, 737, 739, 741, 742, 748, 749, 753, 767, 768, 770, 784, 786, 787, 789Provision of environmental mitigation
621Provision of balancing pond and associated works and access for maintenance
Provision of electricity supply system and access
Provision of new public right of way
622, 624, 625, 627, 628, 630 to 632, 636, 666, 669, 671, 738Diversion or installation of, or works to, utilities apparatus
633, 676, 677, 679, 697, 741a, 747, 747a, 747b, 747d, 756, 756a, 761, 762a, 763 to 765, 771, 772, 774 to 778, 780 to 783Provision of worksite and access for construction and maintenance
642, 758Provision of worksite and access for construction and maintenance
Diversion or installation of, or works to, utilities apparatus
663, 672Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
692Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
Provision of electricity supply system and access
Provision of flood mitigation measures
Provision of new public right of way
Diversion and installation of overhead electric lines
726, 731, 734, 740, 745, 746Provision of worksite and access for construction
751, 755Provision of worksite and access for construction and maintenance
Provision of environmental mitigation
759Provision of worksite and access for construction and maintenance
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
AP2-5, AP2-6Provision of access for construction and maintenance
AP4-40 to AP4-42Reinstatement of businesses or facilities
County of Buckinghamshire, District of South Bucks,Parish of IverAP2-1, AP2-3Provision and renewal of railway systems for operational purposes and drainage
AP2-9 to AP2-11, AP2-14, AP2-15Provision of worksite and access for construction
Borough of SloughAP2-3, AP2-5, AP2-6, AP2-14, AP2-21, AP2-25, AP2-30, AP2-33, AP2-34Provision of worksite and access for construction
AP2-12, AP2-26Provision and renewal of railway systems for operational purposes and drainage
AP2-13, AP2-20Provision of worksite and access for construction
Provision and renewal of railway systems for operational purposes and drainage
AP2-17, AP2-22, AP2-23, AP2-28Provision of worksite and access for construction
Provision of flood mitigation measures
AP2-35Provision of access for construction and maintenance of utility diversions
AP2-37Diversion or installation of, or works to, utilities apparatus
County of Buckinghamshire District of South Bucks Parish of Denham1, 2Provision of flood mitigation measures
1d, 1fDiversion and installation of overhead electric lines
11, 17, 19, 32Provision of environmental mitigation
25, 26, 28 to 31, 33, 46, 52Provision of worksite and access for construction
14, 15, 23, 27Provision of balancing pond and associated works and access for maintenance
26Provision of worksite and access for construction
34Provision of environmental mitigation
Provision of worksite and access for construction
42, 43Diversion or installation of, or works to, utilities apparatus
37 to 39, 47 to 49, AP2-3Provision of access for construction and maintenance
AP4-1, AP4-2, AP4-4 to AP4-9Provision of worksite and access for construction
Provision of drainage and associated works
Parish of WexhamAP4-1Provision of environmental mitigation
County of Hertfordshire District of Three Rivers5Provision of environmental mitigation
Provision of worksite and access for construction
Provision of drainage and associated works
7, 13, 15, 17, 19, 21, 22, 24, 25, 27, 31, 38, 41, 44, 48, 54, 58, 65, 69, 104Provision of worksite and access for construction
12Provision of worksite and access for construction and maintenance
Diversion or installation of, or works to, utilities apparatus
23, 53, 80Provision of balancing pond and associated works and access for maintenance
32, 36, 37Provision of worksite and access for construction
Provision of drainage and associated works
40, 46, 61, 63, 64Provision of drainage and associated works
49, 55, 80a, 84, 94, 97, 120, AP4-1 to AP4-17Provision of environmental mitigation
75Provision of environmental mitigation
Provision of worksite and access for construction
107, 109Provision of environmental mitigation
Provision of worksite and access for construction
Provision of electricity supply system and access
Diversion and installation of overhead electric lines
116Provision of worksite and access for construction
Diversion and installation of overhead electric lines
10Diversion or installation of, or works to, utilities apparatus
AP4-18Reinstatement of businesses or facilities
County of Buckinghamshire District of Chiltern Parish of Chalfont St Peter1, 7, 21, 30, 31, 35Provision of worksite and access for construction
16Provision of environmental mitigation
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
Provision of new public right of way
19Diversion and installation of overhead electric lines
70, 75, 76, 83, 85Provision of environmental mitigation
Parish of Chalfont St Giles4 to 6Provision of environmental mitigation
131Provision of worksite and access for construction
134, 135, 139, 141, 142, 147Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
Parish of Amersham7, 22, 24, 28, 34, 37Diversion or installation of, or works to, utilities apparatus
Provision of worksite and access for construction and maintenance
10Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
27Diversion or installation of, or works to, utilities apparatus
31Provision of environmental mitigation
Provision of worksite and access for construction
59, 66, 67, 74, 76, 77Provision of protective works to watercourse
Parish of Coleshill4Provision of environmental mitigation
8Diversion or installation of, or works to, utilities apparatus
Parish of Little Missenden2 to 4Provision of protective works to watercourse
11, 16Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
14Diversion or installation of, or works to, utilities apparatus
Provision of worksite and access for construction and maintenance
15, 17, 19, 20Diversion or installation of, or works to, utilities apparatus
AP2-2, AP2-3Provision of new public right of way
Parish of Great Missenden142, 158, 174, 178, AP4-55, AP4-56Provision of environmental mitigation
135 to 137Provision of drainage and associated works
155, 184Provision of environmental mitigation
Provision of drainage and associated works
AP4-80, AP4-81Provision of environmental mitigation
Provision of new public right of way
170, 171Provision of environmental mitigation
Provision of worksite and access for construction
AP4-31, AP4-38, AP4-41, AP4-41a, AP4-42 to AP4-44, AP4-47a, AP4-48, AP4-49, AP4-59, AP4-73, AP4-74Diversion and installation of overhead electric lines
173, 179, 188, 189Diversion or installation of, or works to, utilities apparatus
112, 117Provision of environmental mitigation
Diversion and installation of overhead electric lines
Diversion or installation of, or works to, utilities apparatus
157, 159 to 161, 163, 167, AP4-15Provision of worksite and access for construction
128, 139Provision of worksite and access for construction
Diversion and installation of overhead electric lines
138, 147Diversion and installation of overhead electric lines
166Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
Diversion and installation of overhead electric lines
162a, 162bProvision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
Diversion or installation of, or works to, utilities apparatus
Diversion and installation of overhead electric lines
180, AP4-51, AP4-52, AP4-75Provision of environmental mitigation
Diversion and installation of overhead electric lines
AP2-2Provision of balancing pond and associated works and access for maintenance
AP4-54, AP4-78Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
AP4-57Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
Diversion and installation of overhead electric lines
Provision of new public right of way
AP4-58, AP4-69, AP4-70Provision of worksite and access for construction and maintenance
Provision of drainage and associated works
AP4-65Provision of balancing pond and associated works and access for maintenance
AP4-67Provision of environmental mitigation
Provision of worksite and access for construction
Provision of drainage and associated works
AP4-68Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
Diversion and installation of overhead electric lines
Parish of The Lee2, 42 to 45Provision of environmental mitigation
5, 22, 24, 28, 34Reprofiling of ground
8, 9, 26Provision of worksite and access for construction
Reprofiling of ground
11, 12, 18, 19, 31Provision of environmental mitigation
Diversion and installation of overhead electric lines
16Diversion and installation of overhead electric lines
27Provision of environmental mitigation
Reprofiling of ground
Diversion or installation of, or works to, utilities apparatus
32Provision of environmental mitigation
Reprofiling of ground
36Reprofiling of ground
Provision of worksite and access for construction and maintenance
39, 40Provision of environmental mitigation
Provision of worksite and access for construction
AP2-1Provision of access for construction
District of Aylesbury Vale Parish of Wendover1, 3, 14, 48, 150, 153, 233Provision of environmental mitigation
Diversion and installation of overhead electric lines
5, 8, 15, 19, 59, 66 to 71, 74, 76 to 78, 80, 81, 123, 143, 147, 220Provision of drainage and associated works
7, 251aProvision of environmental mitigation
Provision of drainage and associated works
9, 11, 23, 25, 50, 57, 65, 97, 98, 127, 129, 132, 146, 222, 232, 236, 238, 239, 243, 248, 250a, 257Provision of environmental mitigation
18, 42, 45, 46, 60, 120, 126, 149, 151, 182, 187, 190, 192, 224Provision of worksite and access for construction
24Provision of drainage and associated works
Diversion or installation of, or works to, utilities apparatus
29Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
Diversion or installation of, or works to, utilities apparatus
31Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
Provision of drainage and associated works
32, 58, 108, 109, 142, 212, 214, 223, 241Diversion and installation of overhead electric lines
34, 55, 94, 124, 204Provision of environmental mitigation
Diversion and installation of overhead electric lines
Provision of worksite and access for construction
35, 169, 172, 185, 205, 206Diversion or installation of, or works to, utilities apparatus
38 to 41, 52, 96, 103, 110, 111Provision of environmental mitigation
Provision of worksite and access for construction
47, 56, 62, 63, 165, 211, 235Provision of worksite and access for construction
Diversion and installation of overhead electric lines
54Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
61, 221Provision of worksite and access for construction
Provision of drainage and associated works
64Provision of worksite and access for construction
Diversion and installation of overhead electric lines
Provision of drainage and associated works
91, 213, 215Provision of drainage and associated works
Diversion or installation of, or works to, utilities apparatus
95Provision of worksite and access for construction and maintenance
100Provision of environmental mitigation
Provision of drainage and associated works
Diversion and installation of overhead electric lines
135, 136Provision of balancing pond and associated works and access for maintenance
Diversion and installation of overhead electric lines
156, 159, 217Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
171Provision of worksite and access for construction
Provision of new public right of way
173Installation of ground anchors
203Provision of worksite and access for construction
Provision of new public right of way
Diversion and installation of overhead electric lines
219Provision of worksite and access for construction
Provision of environmental mitigation
Provision of drainage and associated works
Diversion and installation of overhead electric lines
230Diversion or installation of, or works to, utilities apparatus
Diversion and installation of overhead electric lines
AP1-11Provision of environmental mitigation
Provision of worksite and access for construction and provision of balancing pond and associated works
Access for maintenance
AP2-1Provision of balancing pond and associated works and access for maintenance
AP2-3aMinor highway alterations
AP2-4Reinstatement of businesses or facilities
District of Wycombe Parish of Ellesborough2Provision of drainage and associated works
Diversion or installation of, or works to, utilities apparatus
4, 15, 74Provision of worksite and access for construction
5Provision of environmental mitigation
Provision of worksite and access for construction
Provision of new public right of way
10Provision of environmental mitigation
Provision of drainage and associated works
13, 17, 32, 33Diversion or installation of, or works to, utilities apparatus
34, 44, 66, 70Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
22, 23, 30, 35, 36, 38, 41, 47, 48, AP2-1, AP2-2Provision of environmental mitigation
50, 51, 54 to 57Provision of flood mitigation measures
52Provision of worksite and access for construction and maintenance
53, 61 to 64, 71, 72Provision of drainage and associated works
69, 80Diversion and installation of overhead electric lines
11, 12Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
AP4-1Provision of environmental mitigation
Provision of worksite and access for construction
District of Aylesbury Vale Parish of Stoke Mandeville4, 21, 23, 26, 33, 34, 38, 81, 90, 100 to 102, 108, 112, 155, 157, 158, 161Provision of environmental mitigation
6, 69, 113Provision of worksite and access for construction and maintenance
8, 9, 94, 95, 120Provision of flood mitigation measures
10Provision of environmental mitigation
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
Provision of new public right of way
18Provision of worksite and access for construction and maintenance
Provision of new public right of way
22, 48, 56, 122, 132, 144Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
24, 59, 63, 116, 149, 151Provision of worksite and access for construction
25, 72, 75, 76, 78 to 80, 87, 88, 91, 98, 109, 117, 138, 141Diversion or installation of, or works to, utilities apparatus
28Provision of balancing pond and associated works and access for maintenance
43, 84, 103, 129Provision of environmental mitigation
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
61Diversion or installation of, or works to, utilities apparatus
Provision of new public right of way
62Provision of drainage and associated works
74, 92, 93, 152Provision of drainage and associated works
Provision of environmental mitigation
83, AP2-2Provision of new public right of way
Diversion or installation of, or works to, utilities apparatus
Provision of environmental mitigation
118Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
119Provision of environmental mitigation
Provision of worksite and access for construction
Provision of drainage and associated works
123, 131, 134, AP1-3, AP1-4, 150Provision of environmental mitigation
Provision of worksite and access for construction
126Provision of environmental mitigation
Provision of worksite and access for construction
Provision of drainage and associated works
Diversion or installation of, or works to, utilities apparatus
146Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
Provision of worksite and access for construction and maintenance
District of Wycombe Parish of Great and Little Kimble cum Marsh1Provision of drainage and associated works
3, 7, 9Provision of worksite and access for construction
District of Aylesbury Parish of Stone with Bishopstone and Hartwell6, 65, 86Diversion or installation of, or works to, utilities apparatus
17, 18, 23, 32Provision of environmental mitigation
Diversion and installation of overhead electric lines
27, 29, 30, 37, 69, 79, 81Provision of environmental mitigation
28, 28bProvision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
33Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
Provision of drainage and associated works
Provision of worksite and access for construction
35Provision of worksite and access for construction and maintenance
Diversion or installation of, or works to, utilities apparatus
36Provision of environmental mitigation
Provision of access for construction and maintenance
39Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
Provision of drainage and associated works
Provision of access for construction and maintenance
40Provision of worksite and access for construction and maintenance
44, 46, 53, 57, 59Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
45Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
Provision of worksite and access for construction and maintenance
47Provision of worksite and access for construction
Provision of a turning head
48, 85, 90Provision of worksite and access for construction
51, 55Provision of worksite and access for construction
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
60Provision of worksite and access for construction and maintenance
Diversion or installation of, or works to, utilities apparatus
Provision of a turning head
61, 72Provision of environmental mitigation
Provision of worksite and access for construction
66a, 66b, 71b, 73bProvision of worksite and access for construction and maintenance
Diversion or installation of, or works to, utilities apparatus
Provision of environmental mitigation
Provision of drainage and associated works
Provision of flood mitigation measures
74a, 75, 89Provision of flood mitigation measures
76aProvision of environmental mitigation
Provision of drainage and associated works
87Provision of environmental mitigation
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
Provision of flood mitigation measures
88Provision of flood mitigation measures
Provision of drainage and associated works
AP4-2Provision of environmental mitigation
Provision of worksite and access for construction
Provision of drainage and associated works
Parish of Aylesbury1Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
Diversion and installation of overhead electric lines
6, 18Provision of environmental mitigation
Diversion and installation of overhead electric lines
20 to 22, 24Provision of environmental mitigation
Parish of Coldharbour2 to 7, 10, 11Provision of environmental mitigation
Parish of Fleet Marston4Provision of worksite and access for construction and maintenance
5, 11Provision of environmental mitigation
Provision of drainage and associated works
Diversion or installation of, or works to, utilities apparatus
6, 7Diversion or installation of, or works to, utilities apparatus
8, 9Provision of flood mitigation measures
10Provision of worksite and access for construction
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
13, 26Provision of environmental mitigation
14, 18, 30Provision of drainage and associated works
15, 21Provision of worksite and access for construction
16, 19Provision of environmental mitigation
Provision of new public right of way
20Provision of environmental mitigation
Provision of worksite and access for construction
23Provision of worksite and access for construction
Provision of drainage and associated works
25Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
12bProvision of environmental mitigation
Provision of worksite and access for construction and maintenance
Diversion or installation of, or works to, utilities apparatus
Parish of Waddesdon1, 16Provision of flood mitigation measures
2, 73, 79Provision of environmental mitigation
Provision of new public right of way
3, 32, 45, 107, 128, 129Provision of drainage and associated works
6Provision of environmental mitigation
Provision of drainage and associated works
Provision of new public right of way
7, 9, 113, 120, 126, 127Provision of environmental mitigation
Provision of worksite and access for construction
8, 10, 11, 13, 34, 36, 41, 42, 49, 51, 53, 59, 60, 67, 69, 74, 76, 81 to 83, 85, 100, 103Provision of environmental mitigation
17, 46, 52, 56, 66, 72, 78, 84, 106, 114Provision of worksite and access for construction
18Provision of environmental mitigation
Provision of worksite and access for construction
Provision of electricity supply system and access
31, 54, 109, 112Provision of worksite and access for construction and maintenance
33, 40, 58Provision of balancing pond and associated works and access for maintenance
68, 93, 110, 111Diversion or installation of, or works to, utilities apparatus
91Provision of balancing pond and associated works and access for maintenance
Diversion or installation of, or works to, utilities apparatus
94Provision of new public right of way
97Provision of environmental mitigation
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
105Provision of drainage and associated works
Provision of worksite and access for construction and maintenance
123Provision of environmental mitigation
Provision of worksite and access for construction
Provision of flood mitigation measures
Parish of Quainton3, 35, 61, 66Provision of environmental mitigation
Provision of flood mitigation measures
8, 23, 59, 74, 88, 115, AP2-5, AP2-14, AP2-15, AP4-1, AP4-2Provision of balancing pond and associated works and access for maintenance
9, 12, 14, 24, 92, 98 to 100, 133, 138, 142, 177, 182, 191, 194, 199, 203, 216, 218, 248 to 250Provision of worksite and access for construction
11, 20, 27, 53, 56, 58, 62, 64, 65, 122, 125, 128, 141, 195a, 206a, 222, 223, 225, 226, 232, 240, 253, 270, 271, 273a, AP1-23, AP1-24Provision of environmental mitigation
17, 75, 127, 210, 212Diversion or installation of, or works to, utilities apparatus
19Provision of worksite and access for construction
Removal of utility apparatus
21Provision of environmental mitigation
Provision of worksite and access for construction
Removal of utility apparatus
31Provision of balancing pond and associated works and access for maintenance
Removal of utility apparatus
32, 50, 68, 151, 219, 220, 224Provision of flood mitigation measures
33, 72Provision of worksite and access for construction and maintenance
87Provision of environmental mitigation
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
54, 71, 89, 104, 110, 113, 118b, 118d, AP1-5, AP1-16 to AP1-20Provision of environmental mitigation
Provision of worksite and access for construction
38Provision of environmental mitigation
Provision of diversion or installation of, or works to, utilities apparatus
40Provision of environmental mitigation
Provision of drainage and associated works
46, 107, 109, 131, 146, 149, 159, 197, 244, AP2-3, AP2-4, AP2-10Provision of drainage and associated works
47Provision of a turning head
Provision of environmental mitigation
49Provision of a turning head
Diversion or installation of, or works to, utilities apparatus
93Provision of balancing pond and associated works and access for maintenance
Provision of flood mitigation measures
118c, 176Provision of environmental mitigation
Diversion and installation of overhead electric lines
124Provision of environmental mitigation
Provision of worksite and access for construction
Provision of new public right of way
135, 150, 155, 157, 158, 161, 164, 168, 170, 184a, 233Diversion and installation of overhead electric lines
136aProvision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
Provision of drainage and associated works
Provision of new public right of way
Provision of electricity supply system and access
143Diversion and installation of overhead electric lines
Provision of access for construction and maintenance
160Provision of access for construction and maintenance
166Provision of electricity supply system and access
173Provision of environmental mitigation
Diversion and installation of overhead electric lines
Provision of drainage and associated works
174, 175Provision of worksite and access for construction
Diversion and installation of overhead electric lines
204Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
Provision of flood mitigation measures
206b, 207aProvision of environmental mitigation
Provision of electricity supply system and access
243Provision of balancing pond and associated works and access for maintenance
Provision of drainage and associated works
251Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
AP2-6, AP2-7 to AP2-9Diversion or installation of, or works to, utilities apparatus
Diversion and installation of overhead electric lines
Parish of Grendon Underwood3, 5, 10, 28, 30Provision of environmental mitigation
20, 23, 26Provision of worksite and access for construction
4Provision of environmental mitigation
Provision of drainage and associated works
21 and 24Provision of environmental mitigation
Provision of worksite and access for construction
12aProvision of environmental mitigation
Provision of worksite and access for construction and maintenance
AP2-6Provision of worksite and access for construction and maintenance
Provision of new public right of way
16aProvision of environmental mitigation
Provision of worksite and access for construction and maintenance
Provision of new public right of way
29Provision of balancing pond and associated works and access for maintenance
AP1-1, AP1-5, AP1-6, AP1-9Diversion and installation of overhead electric lines
Parish of Middle Claydon1, 2Provision of environmental mitigation
Parish of East Claydon4, 4a, 5, 7Diversion and installation of overhead electric lines
Parish of Calvert Green1, 9, 11Provision of environmental mitigation
2Provision of environmental mitigation
Provision of new public right of way
AP2-1Provision of new public right of way
6Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
Provision of flood mitigation measures
Provision of new public right of way
8Provision of flood mitigation measures
23Diversion or installation of, or works to, utilities apparatus
24Diversion or installation of, or works to, utilities apparatus
Provision of access for construction and maintenance
25Provision of worksite and access for construction
18aProvision of access for construction and maintenance
Provision of new public right of way
AP4-2Provision of access for construction
AP4-6Provision of balancing pond and associated works and access for maintenance
Parish of Steeple Claydon3, 4, 6, 78, 80, 110, 111, AP1-1, AP4-1, AP4-4Provision of environmental mitigation
24, 26a, 27, 31, 33, 97Provision of worksite and access for construction
72Provision of environmental mitigation
Provision of access for construction and maintenance
9c, 9dProvision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
Provision of access for construction and maintenance
9a, 100, 117, 119, 120Diversion or installation of, or works to, utilities apparatus
21Provision of worksite and access for construction
Provision of balancing pond and associated works and access for maintenance
52a, 76Provision of environmental mitigation
Provision of worksite and access for construction
51aProvision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
75Diversion or installation of, or works to, utilities apparatus
Provision of new public right of way
98, 99, 112Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
109Provision of flood mitigation measures
124, 125Provision of drainage and associated works
69, 71Provision of new public right of way
102, 103, AP1-8, AP2-1 to AP2-4Provision of worksite and access for construction and maintenance
Parish of Charndon2, 3Diversion or installation of, or works to, utilities apparatus
Parish of Twyford5, 6, 13, 62, 67, 92, 101Provision of worksite and access for construction
14Provision of balancing pond and associated works and access for maintenance
Provision of drainage and associated works
Provision of new public right of way
24, 26, 44, 49, 54Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
27, 48Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
38, 60, 81, 82, 89, 90Provision of flood mitigation measures
39Provision of balancing pond and associated works and access for maintenance
Provision of worksite and access for construction
47, 63, 64, 69Provision of environmental mitigation
Provision of worksite and access for construction
52Provision of environmental mitigation
Provision of worksite and access for construction
Provision of access for construction and maintenance
53, 76Provision of worksite and access for construction and maintenance
58, 88Provision of environmental mitigation
Provision of new public right of way
71, 75, 77, 83, 84, 95, 97, 99, 100Provision of environmental mitigation
72Provision of balancing pond and associated works and access for maintenance
Provision of drainage and associated works
78Provision of drainage and associated works
80Provision of environmental mitigation
Provision of worksite and access for construction
Provision of new public right of way
87Diversion or installation of, or works to, utilities apparatus
91Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
Provision of new public right of way
94Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
Provision of access for construction and maintenance
Provision of new public right of way
Parish of Preston Bissett1 to 4Provision of flood mitigation measures
6, 13, 22, 27, 30, 31, 44, 45, 54 to 56, 58, 62, AP2-1Provision of environmental mitigation
8, 15a, 16b, 28a, 29a, 52Provision of worksite and access for construction
12a, 12b, AP4-1Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
Provision of drainage and associated works
20, 21Provision of environmental mitigation
Provision of drainage and associated works
23aProvision of environmental mitigation
Provision of new public right of way
Provision of drainage and associated works
Provision of worksite and access for construction and maintenance
37Provision of environmental mitigation
Provision of drainage and associated works
Provision of worksite and access for construction and maintenance
16c, 16d, 18b, 41, 47 to 51Provision of environmental mitigation
Provision of worksite and access for construction
40, 42, 43, 61Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
County of Oxfordshire District of Cherwell Parish of Godington5a, 5b, 12, AP2-1Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
6aProvision of worksite and access for construction
8a, 8b, 14, 15Provision of flood mitigation measures
County of Buckinghamshire District of Aylesbury Vale Parish of Chetwode1 to 3, 8, 9Provision of flood mitigation measures
5, 12 to 14, 22 to 24, 28, 31, 35, 42, 45, 52, 53, 55, 64, 84, 87Provision of environmental mitigation
17a, 17b, 17c, 17dProvision of balancing pond and associated works and access for maintenance
Provision of environmental mitigation
Provision of drainage and associated works
19 to 21, 95, 96Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
25, 27, 34, 91Provision of worksite and access for construction
30Provision of environmental mitigation
Provision of drainage and associated works
41, 86, 88Diversion or installation of, or works to, utilities apparatus
51Diversion or installation of, or works to, utilities apparatus
Provision of new public right of way
54Provision of drainage and associated works
Removal of utility apparatus
63Provision of drainage and associated works
65Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
71, 90Provision of environmental mitigation
Provision of new public right of way
76Provision of worksite and access for construction
Removal of utility apparatus
Parish of Barton Hartshorn2a, AP2-5Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
6aProvision of environmental mitigation
7a, 16Provision of worksite and access for construction
9, 10, 22Provision of flood mitigation measures
13Provision of balancing pond and associated works and access for maintenance
Provision of new public right of way
14Provision of worksite and access for construction
Provision of drainage and associated works
19, 24Provision of drainage and associated works
25, 26Provision of environmental mitigation
Provision of new public right of way
County of Oxfordshire District of Cherwell Parish of Newton Purcell with Shelswell1, 8, 17, 39, 49, 66Provision of environmental mitigation
Provision of worksite and access for construction
4, 6, 15, 16, 19, 23, 31, 34, 36, 46, 54, 86Provision of environmental mitigation
10, 22, 27, 55, 69, 75, 82, 83Provision of worksite and access for construction
21, 26, 63, 67, 74, 76Provision of drainage and associated works
32Diversion or installation of, or works to, utilities apparatus
Removal of utility apparatus
Provision of worksite and access for construction
37, 59Provision of balancing pond and associated works and access for maintenance
Provision of new public right of way
30, 56, 58Provision of worksite and access for construction and maintenance
57, 62Provision of flood mitigation measures
Provision of drainage and associated works
61Provision of worksite and access for construction and maintenance
Provision of new public right of way
64Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
Provision of drainage and associated works
72Provision of worksite and access for construction
Provision of flood mitigation measures
85, 88Diversion or installation of, or works to, utilities apparatus
92Provision of worksite and access for construction
Provision of new public right of way
Parish of Finmere5, 9, 54Provision of environmental mitigation
7, 15Provision of environmental mitigation
Provision of new public right of way
8, 12Provision of environmental mitigation
Provision of worksite and access for construction
24, 33, 36, 37Provision of worksite and access for construction
18Diversion or installation of, or works to, utilities apparatus
Provision of new public right of way
18a, 25, 40, 42Diversion or installation of, or works to, utilities apparatus
48Provision of access for utility works
52Provision of environmental mitigation
Removal of utility apparatus
Parish of Mixbury7, 24, 26, 40Diversion or installation of, or works to, utilities apparatus
8, 13aProvision of environmental mitigation
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
12, 17a, 45, 46, 57, AP2-8 to AP2-11Provision of environmental mitigation
15a, 18, AP2-5aProvision of environmental mitigation
Diversion and installation of overhead electric lines
34, 43a, 43b, 51Provision of worksite and access for construction
28a, 37, 38Diversion or installation of, or works to, utilities apparatus
Diversion and installation of overhead electric lines
31Provision of balancing pond and associated works and access for maintenance
Provision of electricity supply system and access
31aProvision of environmental mitigation
Removal of utility apparatus
Diversion or installation of, or works to, utilities apparatus
39Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
40b, 40c, 49Provision of environmental mitigation
Provision of worksite and access for construction
41a, 63Provision of drainage and associated works
48Provision of environmental mitigation
Provision of new public right of way
53, 54Provision of balancing pond and associated works and access for maintenance
Provision of new public right of way
Provision of drainage and associated works
52Provision of balancing pond and associated works and access for maintenance
Provision of new public right of way
Provision of drainage and associated works
Removal of utility apparatus
62Provision of flood mitigation measures
Removal of utility apparatus
66Removal of utility apparatus
County of Buckinghamshire District of Aylesbury Vale Parish of Westbury1Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
Removal of utility apparatus
Provision of drainage and associated works
1aProvision of balancing pond and associated works and access for maintenance
Provision of drainage and associated works
Provision of new public right of way
5, 6Provision of drainage and associated works
7Provision of environmental mitigation
Provision of drainage and associated works
Provision of new public right of way
Provision of worksite and access for construction and maintenance
14Provision of flood mitigation measures
19, 21 to 25, 27Provision of environmental mitigation
28Provision of environmental mitigation
Provision of new public right of way
29Provision of worksite and access for construction
Provision of new public right of way
30, 33 to 35, 38Provision of worksite and access for construction
18, 20Diversion or installation of, or works to, utilities apparatus
Parish of Turweston3, 4, 45, 46Provision of new public right of way
11Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
8, 13a, 20, 27, 50, 68, 71, 72, 76 to 79, 83, 85, 99, 100Provision of worksite and access for construction
18, 21, 89, 91Provision of environmental mitigation
29Diversion or installation of, or works to, utilities apparatus
62, 73Provision of worksite and access for construction
Diversion and installation of overhead electric lines
Removal of utility apparatus
81Provision of worksite and access for construction and maintenance
37Diversion and installation of overhead electric lines
38, 104, 106Provision of environmental mitigation
Provision of worksite and access for construction
40, 57Provision of worksite and access for construction
Diversion and installation of overhead electric lines
42, 61, 67Diversion and installation of overhead electric lines
43, 48Diversion and installation of overhead electric lines
Provision of new public right of way
49Provision of worksite and access for construction
Provision of new public right of way
65Provision of worksite and access for construction
Removal of utility apparatus
Provision of balancing pond and associated works and access for maintenance
84Provision of worksite and access for construction
Provision of balancing pond and associated works and access for maintenance
88Provision of environmental mitigation
Diversion and installation of overhead electric lines
90Provision of environmental mitigation
Provision of worksite and access for construction
Provision of balancing pond and associated works and access for maintenance
102, 110Provision of drainage and associated works
109Provision of environmental mitigation
Provision of flood mitigation measures
AP2-1 to AP2-4Reinstatement of businesses or facilities
County of Northamptonshire District of South Northamptonshire Parish of Whitfield1Provision of balancing pond and associated works and access for maintenance
Diversion and installation of overhead electric lines
4, 9, 13, 14Provision of drainage and associated works
6Provision of environmental mitigation
Diversion and installation of overhead electric lines
Provision of worksite and access for construction
Provision of drainage and associated works
Provision of electricity supply system, and access
10Provision of environmental mitigation
Provision of flood mitigation measures
Provision of new public rights of way
Provision of drainage and associated works
16, AP2-3Provision of environmental mitigation
Provision of worksite and access for construction
Provision of new public right of way
20, 35Provision of environmental mitigation
Provision of worksite and access for construction
Provision of new public right of way
Diversion or installation of, or works to, utilities apparatus
26Provision of environmental mitigation
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
30Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
17Diversion or installation of, or works to, utilities apparatus
Diversion and installation of overhead electric lines
25Provision of flood mitigation measures
Provision of new public right of way
27Provision of flood mitigation measures
28Provision of environmental mitigation
29, 37, 40, 42, 48 to 50Provision of worksite and access for construction
41Provision of balancing pond and associated works and access for maintenance
44Provision of environmental mitigation
Provision of worksite and access for construction
Parish of Brackley1Provision of balancing pond and associated works and access for maintenance
Provision of drainage and associated works
Diversion or installation of, or works to, utilities apparatus
4, 6Provision of worksite and access for construction and maintenance
7Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
9Provision of worksite and access for construction
12Provision of environmental mitigation
Provision of worksite and access for construction
13Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
14, 15Diversion or installation of, or works to, utilities apparatus
Parish of Radstone1, 2, 22Provision of worksite and access for construction
5, 7aProvision of worksite and access for construction
Provision of new public right of way
6a, 6b, 20Provision of environmental mitigation
Provision of worksite and access for construction
9Provision of environmental mitigation
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
7Diversion or installation of, or works to, utilities apparatus
Removal of utility apparatus
8a, 16a, 16c, 18a, 18c, 40, 41, 47Provision of environmental mitigation
10, 17, 21, 23, 38, AP2-4, AP2-6Provision of environmental mitigation
Provision of drainage and associated works
19, 26, 32, 33Provision of environmental mitigation
Provision of drainage and associated works
Provision of balancing pond and associated works and access for maintenance
27, 37a, 37b, 41aProvision of balancing pond and associated works and access for maintenance
28, 29Provision of flood mitigation measures
30Provision of balancing pond and associated works and access for maintenance
Provision of drainage and associated works
Provision of environmental mitigation
Provision of new public right of way
Removal of utility apparatus
36Provision of environmental mitigation
Removal of utility apparatus
AP2-7Provision of new public right of way
46Provision of flood mitigation measures
Parish of Greatworth1Provision of new public right of way
3Provision of drainage and associated works
Provision of flood mitigation measures
4Provision of environmental mitigation
Provision of drainage and associated works
5Provision of flood mitigation measures
8, 11, 15, 75, 76Provision of environmental mitigation
9Provision of worksite and access for construction
Provision of new public right of way
12, AP2-1Provision of worksite and access for construction
Provision of new public right of way
Removal of utility apparatus
13Provision of environmental mitigation
Provision of new public right of way
Diversion or installation of, or works to, utilities apparatus
Removal of utility apparatus
Provision of worksite and access for construction
19Provision of environmental mitigation
Provision of new public right of way
Diversion or installation of, or works to, utilities apparatus
15aProvision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
Provision of new public right of way
16, 17, 17a, 38Diversion or installation of, or works to, utilities apparatus
18, 48, 59, 60, 63, 64, 66, 67, 71, 72, 74, 77, 80, 82, 84 to 86, 90, 91, 98, AP4-5Provision of worksite and access for construction
10Provision of environmental mitigation
Provision of new public right of way
20, 21Provision of drainage and associated works
23Provision of worksite and access for construction
Provision of drainage and associated works
Removal of utility apparatus
30, 70, 73Provision of worksite and access for construction
Removal of utility apparatus
24Provision of balancing pond and associated works and access for maintenance
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
Removal of utility apparatus
25Diversion or installation of, or works to, utilities apparatus
Removal of utility apparatus
39a, 39bProvision of balancing pond and associated works and access for maintenance
Diversion or installation of, or works to, utilities apparatus
Removal of utility apparatus
26Diversion or installation of, or works to, utilities apparatus
Provision of worksite and access for construction
28, 31, 32, 34, 52, 56, 83, 99Provision of worksite and access for construction
Provision of environmental mitigation
29aProvision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
Removal of utility apparatus
Provision of drainage and associated works
Provision of balancing pond and associated works and access for maintenance
33Provision of balancing pond and associated works and access for maintenance
43Provision of flood mitigation measures
Diversion or installation of, or works to, utilities apparatus
44Provision of worksite and access for construction and maintenance
57, 61aProvision of worksite and access for construction and maintenance
Provision of new public right of way
Parish of Marston St Lawrence4, 23Provision of environmental mitigation
5, 8, 11, 14Provision of worksite and access for construction
7, 9Provision of environmental mitigation
Provision of worksite and access for construction
15Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
17Provision of environmental mitigation
Provision of drainage and associated works
AP4-1Provision of drainage and associated works
Parish of Sulgrave1Provision of environmental mitigation
Provision of new public right of way
Parish of Thorpe Mandeville3Provision of new public right of way
Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
Provision of drainage and associated works
4, 16, 48, 54Provision of worksite and access for construction
18, 47Diversion or installation of, or works to, utilities apparatus
15, 31, 35Provision of environmental mitigation
25, 41, 42Provision of drainage and associated works
26Provision of environmental mitigation
Provision of drainage and associated works
Provision of balancing pond and associated works and access for maintenance
Removal of utility apparatus
28, 33, 36, 40, 43Provision of flood mitigation measures
29, 51Provision of environmental mitigation
Provision of worksite and access for construction
60, 62Provision of balancing pond and associated works and access for maintenance
69Provision of environmental mitigation
Provision of drainage and associated works
Removal of utility apparatus
Diversion or installation of, or works to, utilities apparatus
71Provision of balancing pond and associated works and access for maintenance
Provision of environmental mitigation
AP2-3Provision of a turning head
Provision of access for construction
Parish of Culworth1Diversion or installation of, or works to, utilities apparatus
7, 8, 13, 16Provision of environmental mitigation
Provision of worksite and access for construction
11Provision of environmental mitigation
Provision of drainage and associated works
12, 20, 23Provision of environmental mitigation
17Provision of worksite and access for construction
Provision of electricity supply system and access
18Provision of balancing pond and associated works and access for maintenance
Provision of drainage and associated works
Provision of new public right of way
19, AP4-1Provision of balancing pond and associated works and access for maintenance
21aProvision of worksite and access for construction and maintenance
22, 25, 44Provision of worksite and access for construction
29Provision of drainage and associated works
34Provision of worksite and access for construction
Provision of drainage and associated works
39Provision of flood mitigation measures
Parish of Chipping Warden and Edgcote2, 4, 9, 28, 32, 33, 95, 96, 105, AP4-1, AP4-1a, AP4-1b, AP4-2Provision of environmental mitigation
35, 36, 39Diversion or installation of, or works to, utilities apparatus
11Provision of worksite and access for construction
Provision of flood mitigation measures
3, 14, 41Provision of flood mitigation measures
15, 16, 24, 27, 38, 43, 48 to 50, 81b, 81d, 82b, 83b, 84, 86, 87a, 87b, 87c, 89a, 90, 91, 92b, 93, 104, 107, AP2-16, AP2-17, AP4-12, AP4-13Provision of worksite and access for construction
18aProvision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
Provision of new public right of way
25Provision of worksite and access for construction and maintenance
47, AP2-1Provision of balancing pond and associated works and access for maintenance
58Provision of environmental mitigation
Provision of new public right of way
65aProvision of environmental mitigation
Provision of new public right of way
Diversion or installation of, or works to, utilities apparatus
71, AP1-3, AP2-15Provision of environmental mitigation
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
72a, AP2-21Provision of environmental mitigation
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
Provision of new public right of way
94a, 99Provision of worksite and access for construction
Provision of new public right of way
AP2-3, AP2-5, AP2-13Provision of balancing pond and associated works and access for maintenance
Provision of drainage and associated works
AP2-14Provision of a turning head
AP2-9Provision of drainage and associated works
AP4-3Provision of drainage and associated works
AP4-10, AP4-11Provision of access for construction
Parish of Aston Le Walls3, 32, AP4-1Provision of worksite and access for construction
9Diversion or installation of, or works to, utilities apparatus
10Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
17Provision of worksite and access for construction
Provision of new public right of way
20Provision of environmental mitigation
23, 25, AP2-1Provision of environmental mitigation
Provision of worksite and access for construction
28a, 31, AP2-2, AP2-3Provision of balancing pond and associated works and access for maintenance
39, AP2-4Provision of drainage and associated works
Parish of Boddington11, 29, 39, 52, 54, 66, AP2-1, AP4-3Provision of drainage and associated works
3, 23, 26, 27a, 27b, 50, 51, 89, 107b, 109b, AP4-1, AP4-2Provision of worksite and access for construction
2a, 40a, 87, 96, 98, 114, 123b, AP2-2Provision of environmental mitigation
Provision of worksite and access for construction
18Provision of environmental mitigation
Provision of new public right of way
Provision of worksite and access for construction
97, 100a, 107a, 109aProvision of environmental mitigation
Provision of worksite and access for construction
Provision of drainage and associated works
Diversion or installation of, or works to, utilities apparatus
85Diversion or installation of, or works to, utilities apparatus
16, 56, 86Provision of flood mitigation measures
91Diversion or installation of, or works to, utilities apparatus
Provision of environmental mitigation
25, 30a, 30b, 57, 62, 63, 71, 72, 80, 93, 115, 121Provision of environmental mitigation
97a and 99Diversion or installation of, or works to, utilities apparatus
Removal of utility apparatus
101Provision of worksite and access for construction and maintenance
14aProvision of balancing pond and associated works and access for maintenance
Provision of flood mitigation measures
22Provision of environmental mitigation
Provision of new public right of way
Provision of worksite and access for construction
28Provision of environmental mitigation
Provision of worksite and access for construction
Provision of balancing pond and associated works and access for maintenance
61Provision of environmental mitigation
Removal of utility apparatus
69Provision of balancing pond and associated works and access for maintenance
74Provision of environmental mitigation
Provision of worksite and access for construction
Removal of utility apparatus
81Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
Provision of drainage and associated works
103aProvision of balancing pond and associated works and access for maintenance
Provision of environmental mitigation
Provision of drainage and associated works
Provision of worksite and access for construction and maintenance
County of Warwickshire District of Stratford-on-Avon Parish of Stoneton5, 7, 8, 13, 14, 16a, 28Provision of environmental mitigation
15Diversion or installation of, or works to, utilities apparatus
16, 18Provision of environmental mitigation
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
19Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
6b, 9b, 22, 24Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
Parish of Wormleighton21Provision of environmental mitigation
12, AP2-4Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
11, 15, 17, 18, 20Provision of worksite and access for construction and maintenance
13Diversion or installation of, or works to, utilities apparatus
23, 25Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
Provision of worksite and access for construction
26Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
Provision of worksite and access for construction
Provision of access for construction and maintenance of utility diversions
28Provision of environmental mitigation
Provision of access for construction and maintenance of utility diversions
31bProvision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
34a, 47Provision of environmental mitigation
Provision of worksite and access for construction
50Diversion or installation of, or works to, utilities apparatus
Provision of environmental mitigation
52Provision of environmental mitigation
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
Provision of new public right of way
55Provision of worksite and access for construction
Parish of Radbourn2, 13b, 19, 28Provision of worksite and access for construction
3Provision of worksite and access for construction
Reprofiling of ground
Provision of drainage and associated works
6Provision of balancing pond and associated works and access for maintenance
Provision of new public right of way
Diversion or installation of, or works to, utilities apparatus
7Provision of worksite and access for construction
Reprofiling of ground
Diversion or installation of, or works to, utilities apparatus
Provision of new public right of way
8, 8cProvision of flood mitigation measures
8bProvision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
Diversion or installation of, or works to, utilities apparatus
Reprofiling of ground
Provision of new public right of way
9Diversion or installation of, or works to, utilities apparatus
Provision of worksite and access for construction
Provision of new public right of way
Provision of environmental mitigation
11Diversion or installation of, or works to, utilities apparatus
Provision of worksite and access for construction and maintenance
Provision of new public right of way
13aProvision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
15Provision of environmental mitigation
16Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
5Diversion or installation of, or works to, utilities apparatus
Provision of flood mitigation measures
Provision of access for construction and maintenance of utility diversions
8dProvision of environmental mitigation
Provision of worksite and access for construction
Parish of Ladbroke5, 19, 20, 25 to 27Diversion or installation of, or works to, utilities apparatus
7, 12, 15, 39, 41, 42, 52Provision of environmental mitigation
8, 18Reprofiling of ground
Provision of drainage and associated works
Provision of worksite and access for construction
24, 28, 32Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
Provision of worksite and access for construction
29, 33, 71, 72Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
35, 56, 62, 63, 76Provision of environmental mitigation
Provision of drainage and associated works
36, 61Provision of worksite and access for construction
37, AP4-2, AP4-3Provision of new public right of way
53, 59, 69Provision of environmental mitigation
Provision of drainage and associated works
Provision of worksite and access for construction
66Provision of balancing pond and associated works and access for maintenance
AP4-1Minor highway alterations
Parish of Southam5, 31, 63, 65, 70, 72, 90, 93Provision of environmental mitigation
54, 56, 58, 60 to 62, 87, AP1-1, AP1-2Diversion or installation of, or works to, utilities apparatus
6, 9, 111Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
13, 94, 95Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
8, 14, 103Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
Diversion or installation of, or works to, utilities apparatus
24, 32Provision of environmental mitigation
Provision of drainage and associated works
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
34, 39, 55, 68, 80Provision of environmental mitigation
Provision of worksite and access for construction
16, 41, 53, 91Provision of worksite and access for construction
28, 29Provision of drainage and associated works
45Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
47Provision of environmental mitigation
Provision of worksite and access for construction
Provision of drainage and associated works
49, 51, 52, AP4-1 to AP4-3Provision of new public right of way
75Provision of environmental mitigation
Provision of access for construction and maintenance of utility diversions
100Provision of environmental mitigation
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
Provision of flood mitigation measures
107Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
Diversion or installation of, or works to, utilities apparatus
Provision of flood mitigation measures
112, 118Provision of worksite and access for construction and maintenance
Parish of Long Itchington1, 15, 19, 30a, 35a, 37, 47, AP4-4Provision of environmental mitigation
2Provision of worksite and access for construction and maintenance
6Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
7Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
Provision of drainage and associated works
Diversion or installation of, or works to, utilities apparatus
Provision of new public right of way
7aProvision of drainage and associated works
9Provision of environmental mitigation
Provision of worksite and access for construction
Provision of access for construction and maintenance of utility diversions
12, 49, 50, 52, 63, 64Diversion or installation of, or works to, utilities apparatus
20, 22, 31, 32Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
53Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
Provision of worksite and access for construction and maintenance
48, 57Provision of worksite and access for construction
58Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
59, 61Provision of balancing pond and associated works and access for maintenance
Diversion or installation of, or works to, utilities apparatus
11aRemoval of utility apparatus
Parish of Ufton2Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
8, 21, 23, 24Diversion or installation of, or works to, utilities apparatus
9Provision of environmental mitigation
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
Provision of drainage and associated works
15Provision of environmental mitigation
Provision of worksite and access for construction
Drainage and associated work
11, 18Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
Diversion or installation of, or works to, utilities apparatus
Provision of drainage and associated works
Provision of flood mitigation measures
AP4-4 to AP4-7Provision of access for construction
District of Warwick Parish of Offchurch4, 6, 32, 49, 50, 51a, 54aProvision of environmental mitigation
7, 10, 98aProvision of worksite and access for construction and maintenance
11Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
12, AP2-1Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
Provision of drainage and associated works
13, 19, 28, 36, 42 to 44, 53aProvision of environmental mitigation
Provision of worksite and access for construction
15Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
Provision of drainage and associated works
18Provision of environmental mitigation
Minor highway alterations
21, 45, 58, 59b, 60, 62Provision of worksite and access for construction
23Provision of environmental mitigation
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
Provision of drainage and associated works
24Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
Provision of drainage and associated works
27Provision of environmental mitigation
Provision of worksite and access for construction
Provision of drainage and associated works
29, 66, 89Diversion or installation of, or works to, utilities apparatus
37, 73Provision of balancing pond and associated works and access for maintenance
57aProvision of worksite and access for construction
Provision of drainage and associated works
68, 70, 84Reprofiling of ground
Provision of worksite and access for construction
69Diversion or installation of, or works to, utilities apparatus
Provision of worksite and access for construction
71, 75Provision of new public right of way
78, 79, 87Provision of environmental mitigation
Provision of worksite and access for construction
Provision of drainage and associated works
Diversion or installation of, or works to, utilities apparatus
80Provision of environmental mitigation
Provision of worksite and access for construction
Provision of new public right of way
Provision of access for construction and maintenance of utility diversions
91aProvision of balancing pond and associated works and access for maintenance
Diversion or installation of, or works to, utilities apparatus
Provision of flood mitigation measures
92aProvision of worksite and access for construction and maintenance
Diversion or installation of, or works to, utilities apparatus
47aProvision of a turning head
51bProvision of a turning head
Provision of environmental mitigation
AP2-2, AP2-3Minor highway alterations
Parish of Cubbington1aProvision of balancing pond and associated works and access for maintenance
Diversion or installation of, or works to, utilities apparatus
Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
19, 21, 41, 46, 49, 53, 57, 61, 65Provision of worksite and access for construction
23, 27, 28, 50, 52, 67Provision of environmental mitigation
4Diversion or installation of, or works to, utilities apparatus
5, 6Provision of access for construction and maintenance
Provision of access for construction and maintenance of utility diversions
9Provision access for construction and maintenance
Diversion or installation of, or works to, utilities apparatus
11a, 14, 15Provision of environmental mitigation
Drainage and associated works
Provision of worksite and access for construction
32Provision of drainage and associated works
Provision of worksite and access for construction
35Provision of environmental mitigation
Provision of drainage and associated works
Installation of ground anchors
39, 48Provision of environmental mitigation
Provision of worksite and access for construction
44Provision of new public right of way
47Provision of access for construction and maintenance
AP4-3Provision of environmental mitigation
Parish of Weston Under Wetherley1, 2Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
4, 5a, AP4-1 to AP4-3Provision of environmental mitigation
AP4-4Provision of worksite and access for construction and maintenance
Parish of Stoneleigh1, 5, 7, 10, 13, 18, 44, 119, 123, 124, 126, 129, 130, 142a, 147, 148, 152, 152a, 155, AP2-1 to AP2-3, AP4-7, AP4-8Provision of worksite and access for construction
8, 27, 50, 52, 54a, 94, 117, 122, 164, 165, 167, 179, AP4-10, AP4-11Provision of environmental mitigation
21, 24, 28, 29, 31, 34, 43, 77a, 83Diversion or installation of, or works to, utilities apparatus
22, 42, 144, 158, 163Provision of environmental mitigation
Provision of drainage and associated works
Provision of worksite and access for construction
33, 62Provision of balancing pond and associated works and access for maintenance
Diversion or installation of, or works to, utilities apparatus
48a, 66, 75, 96, 127, 128, 137, 138, 151, 173, 174, 177, AP4-10a, AP4-10bProvision of environmental mitigation
Provision of worksite and access for construction
55Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
Diversion or installation of, or works to, utilities apparatus
63Provision of balancing pond and associated works and access for maintenance
Diversion or installation of, or works to, utilities apparatus
Provision of drainage and associated works
73, AP4-1Provision of drainage and associated works
79a, 87, 112, 139Provision of environmental mitigation
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
84Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
Diversion or installation of, or works to, utilities apparatus
136, 141Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
97, 100, 143Provision of worksite and access for construction and maintenance
99Provision of worksite and access for construction and maintenance
Diversion or installation of, or works to, utilities apparatus
104Provision of balancing pond and associated works and access for maintenance
105Provision of environmental mitigation
Provision of flood mitigation measures
132Provision of flood mitigation measures
133, AP4-12Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
140b, 146Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
166, 182Provision of environmental mitigation
Provision of new public right of way
171aProvision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
Provision of drainage and associated works
178Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
Provision of new public right of way
184Provision of environmental mitigation
Provision of worksite and access for construction
Provision of new public right of way
Parish of Kenilworth12, 30a, AP2-3Provision of environmental mitigation
13, 16, 21, AP2-1, AP2-2Provision of worksite and access for construction
5, 6, 23, 25aProvision of environmental mitigation
Provision of worksite and access for construction
9, 11, 15Provision of environmental mitigation
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
20Provision of worksite and access for construction
Provision of new public right of way
Parish of Burton Green4, 6, 9, 13, 14, 23a, 37a, 43a, 48, 58b, 65a, 65b, 73a, 82a, 97, AP2-7, AP2-9, AP2-10, AP2-12Provision of environmental mitigation
Provision of worksite and access for construction
7, 19, 59, 63, AP4-1 to AP4-4Provision of environmental mitigation
11, 21, AP1-1aProvision of worksite and access for construction
28a, 28b, 28cProvision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
Provision of new public right of way
29, 31Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
32, AP2-3Provision of worksite and access for construction and maintenance
33aProvision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
Provision of drainage and associated works
Provision of new public right of way
35Reinstatement of businesses or facilities
72Provision of environmental mitigation
Provision of new public right of way
77Provision of new public right of way
98Provision of worksite and access for construction
Provision of new public right of way
AP2-1Provision of worksite and access for construction
Provision of environmental mitigation
Provision of new public right of way
Diversion or installation of, or works to, utilities apparatus
AP2-6Provision of passing places
District of North Warwickshire Parish of Great Packington1, 6Provision of worksite and access for construction
7, 8Provision of balancing pond and associated works and access for maintenance
Parish of Little Packington2Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
4Provision of worksite and access for construction
Diversion and installation of overhead electric lines
10, 12, 15, 16Diversion and installation of overhead electric lines
17, 19Provision of worksite and access for construction
Diversion and installation of overhead electric lines
AP1-1Reinstatement of businesses or facilities
Parish of Coleshill1cProvision of environmental mitigation
Diversion and installation of overhead electric lines
1f, 1g, 1rProvision of balancing pond and associated works and access for maintenance
1, 2 to 5, 7, 12, 13, 112, 127, 134, 136, 139, 145, 148, 150, 160, 204, 272, 304, 306, 397, 408, 410, 435, 445, 479, 514, AP4-1b, AP4-15, AP4-17, AP4-22Diversion and installation of overhead electric lines
33, 35 to 37, 40, 41, 85, 381, 433, 454, 455, 482a, 540, 556, 558a, 561a, 565aDiversion or installation of, or works to, utilities apparatus
38Provision of balancing pond and associated works and access for maintenance
48, 52, 58, 59, 63, 68, 101, 102, 106, 278, 288a, 295, 296, 365, 371, 413, 420, 581a, 589aProvision of worksite and access for construction
50Diversion and installation of overhead electric lines
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
Provision of balancing pond and associated works and access for maintenance
116, 124, 162a, 180b, 240, 241, 244, 246a, 248, 300, 302, 309, 320, 325, 326, 357, 367, 372, 428, 484, 509, 510, 519, AP2-21, AP2-24, AP2-26 to AP2-28Provision of environmental mitigation
51, 440, 495aProvision of environmental mitigation
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
73Provision of environmental mitigation
Removal of existing utilities
546aProvision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
Diversion and installation of overhead electric lines
74, 321, 452a, 452b, 546Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
75, 233a, 322, 377, 391, 396Provision of environmental mitigation
Provision of worksite and access for construction
Provision of new public right of way
77, 87a, 90a, 90b, 91a, 91b, 92a, 92b 103a, 103b, 108b, 108c, 152, 157, 548aProvision of environmental mitigation
Provision of worksite and access for construction
Diversion and installation of overhead electric lines
112bProvision of environmental mitigation
Provision of worksite and access for construction and maintenance
Diversion and installation of overhead electric lines
Provision of new public right of way
Diversion or installation of, or works to, utilities apparatus
127aProvision of worksite and access for construction
Diversion and installation of overhead electric lines
Provision of new public right of way
Diversion or installation of, or works to, utilities apparatus
108a, 310, 315, 354, 506 to 508, 580aProvision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
100, 427Provision of worksite and access for construction and maintenance
164Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
Diversion and installation of overhead electric lines
283, 289, 297, 312a, 335, 346, 366, 369Provision of environmental mitigation
Provision of worksite and access for construction
188Provision of balancing pond and associated works and access for maintenance
Provision of worksite and access for construction
195, 196Provision of worksite and access for construction
Diversion and installation of overhead line equipment
199Provision of balancing pond and associated works and access for maintenance
Diversion and installation of overhead line equipment
247, 257aProvision of balancing pond and associated works and access for maintenance
Provision of environmental mitigation
Provision of new public right of way
253, 388, 416, 451, 459, 460, 502Provision of environmental mitigation
Diversion and installation of overhead line equipment
308, 318, 467Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
358Diversion and installation of overhead line equipment
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
Provision of balancing pond and associated works and access for maintenance
404, 409Provision of environmental mitigation
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
Provision of new public right of way
432Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
Diversion or installation of, or works to, utilities apparatus
Provision of new public right of way
412Provision of environmental mitigation
Diversion and installation of overhead line equipment
419, 517aProvision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
Provision of new public right of way
481Provision of environmental mitigation
Provision of new public right of way
491a, 491bProvision of environmental mitigation
Provision of new public right of way
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
511, 559a, 559b, AP2-20Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
Provision of balancing pond and associated works and access for maintenance
526a, 526bProvision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
Diversion and installation of overhead electric lines
593a, 593bProvision of environmental mitigation
Provision of worksite and access for construction and maintenance
Diversion or installation of, or works to, utilities apparatus
Diversion and installation of overhead line equipment
439, 485, 486Diversion or installation of, or works to, utilities apparatus
Diversion and installation of overhead electric lines
492, 500Provision of worksite and access for construction
Diversion and installation of overhead electric lines
Parish of Water Orton6, 132Provision of worksite and access for construction and maintenance
Diversion or installation of, or works to, utilities apparatus
9a, 10, 27, 28, 37, 40, 43a, 82aProvision of environmental mitigation
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
13a, 42, 50, 57, 64, 65, 67 to 69, 74Provision of environmental mitigation
23, 34, 35, 38, 39, 41, 77aProvision of environmental mitigation
Provision of worksite and access for construction
43, AP4-5Reinstatement of businesses or facilities
44, 89a, 126, 130, 142, AP4-25, AP4-26Provision of worksite and access for construction
48Provision of environmental mitigation
Provision of worksite and access for construction
Provision of balancing pond and associated works and access for maintenance
52Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
53, 54, 56Provision of balancing pond and associated works and access for maintenance
76Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
100a, 100b, 100c, 118Provision of worksite and access for construction and maintenance
Diversion or installation of, or works to, utilities apparatus
Diversion and installation of overhead electric lines
119a, 123Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
124a, 124b, 129, 139aDiversion or installation of, or works to, utilities apparatus
Diversion and installation of overhead electric lines
131a, 131b, 145, 146a, 146b, 149a, 149b, AP4-19, AP4-20Diversion and installation of overhead electric lines
138aDiversion or installation of, or works to, utilities apparatus
133, 140, 143Provision of worksite and access for construction and maintenance
155a, 155bDiversion or installation of, or works to, utilities apparatus
Diversion and installation of overhead electric lines
Provision of balancing pond and associated works and access for maintenance
AP4-14, AP4-16, AP4-17Provision of worksite and access for construction
Minor highway alterations
Parish of ShustokeAP4-1 to AP4-3, AP4-5, AP4-6Provision of environmental mitigation
Parish of Curdworth1a, 49, 70, 72, 77, 78, 80, 106, 215Diversion or installation of, or works to, utilities apparatus
2Provision of worksite and access for construction and maintenance
Provision of environmental mitigation
3a, 6, 7, 113a, 201, 202, 223, 241, 244Provision of worksite and access for construction
5a, 5b, 8a, 11a, 37, 39, 40, 43, 51b, 58, 59, 61, 82a, 96, 102, 153a, 168, 170, 174, 186, 187, AP1-1, AP1-2, AP4-1, AP4-17 to AP4-24, AP4-30, AP4-32Diversion and installation of overhead electric lines
13, AP2-6Provision of worksite and access for construction
Provision of environmental mitigation
16, 21 to 23, 34, 38, 57, 81, 114, 117, 118, 121, 128, 137, 140, 141, 142, 149, 152, 155, 156, 160, 192, 200, AP1-5, AP1-6, AP2-7 to AP2-9, AP4-3 to AP4-9Provision of environmental mitigation
10a, 25a, 26 to 28, 31, 32, 45, 48, 69Provision of environmental mitigation
Diversion and installation of overhead electric lines
35, 191, 194Provision of worksite and access for construction
Diversion and installation of overhead electric lines
210, 216, 219, 220 to 222, 225 to 227, 229, 231, 235, 236, 238, 240, 243, 245, 246Provision of worksite and access for construction and maintenance
51a, 68aProvision of balancing pond and associated works and access for maintenance
Diversion and installation of overhead electric lines
65a, 66a, 81aProvision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
Diversion and installation of overhead electric lines
71Provision of worksite and access for construction and maintenance
Diversion or installation of, or works to, utilities apparatus
67a, 83, 83a, 90 to 92Diversion or installation of, or works to, utilities apparatus
Diversion and installation of overhead electric lines
88, 209, 233, 247Provision of new public right of way
98, 101, 103Installation of ground anchors
99, 103aInstallation of ground anchors
Provision of access for utility works
108aProvision of environmental mitigation
Provision of access for utility works
153, 164, 251, 254, 256Diversion or installation of, or works to, utilities apparatus
Provision of environmental mitigation
228Removal of utility apparatus
249Provision of new public right of way
Provision of environmental mitigation
252Provision of balancing pond and associated works and access for maintenance
Provision of environmental mitigation
AP2-10Provision of access for maintenance
Parish of Lea Marston1 to 4, 13, 16Diversion or installation of, or works to, utilities apparatus
12, 14Provision of environmental mitigation
Provision of drainage and associated works
17, 24a, 26, 28 to 30, 32, 33, 35, 37, 41, 54, 55a, 59, 61, 65a, 71a, AP2-1, AP2-8 to AP2-12, AP2-17, AP2-18, AP2-25, AP4-1 to AP4-4Provision of environmental mitigation
18Provision of balancing pond and associated works and access for maintenance
44, 47, 49, AP2-23Provision of new public right of way
66Provision of new public right of way
Provision of worksite and access for construction
67Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
72a, 72b, 73Provision of new vehicular right on existing public right of way
74aProvision of environmental mitigation
Provision of new public right of way
55b, 68bProvision of environmental mitigation
Minor highway alterations
78a, AP2-22Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
Provision of new public right of way
Provision of environmental mitigation
AP2-24Provision of new public right of way
Parish of Kingsbury2, AP2-1, AP2-2Provision of environmental mitigation
Parish of Middleton4, 108Provision of environmental mitigation
Provision of flood mitigation measures
27, 37, 39, 47, 72 to 74, 87, 93, 95, 99, 101 to 103, 114, 115, 121, 125, 131a, 134a, 148, 160, 167, 175, AP2-6 to AP2-8, AP2-10b, AP2-18, AP2-21Provision of environmental mitigation
100, AP2-10aProvision of environmental mitigation
Provision of flood mitigation measures
Provision of balancing pond and associated works and access for maintenance
21, 30, 32Diversion and installation of overhead electric lines
110, 169aProvision of worksite and access for construction and maintenance
Provision of environmental mitigation
5a, 13a, 31a, 127a, 135a, AP2-10, AP2-10c, AP2-20Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
Provision of worksite and access for construction and maintenance
Provision of flood mitigation measures
38, 66Diversion or installation of, or works to, utilities apparatus
41Provision of flood mitigation measures
52Provision and renewal of railway systems for operational purposes and drainage
11a, 57, 58, 135b, 135c, 135d, 138a, 142a, 147a, 153a, 154a, 156a, 157a, 164a, 171a, 174, AP2-3, AP2-4, AP2-4a, AP2-11bProvision of environmental mitigation
Provision of worksite and access for construction
AP2-9Provision of new public right of way
107Provision of environmental mitigation
Provision of flood mitigation measures
Provision of worksite and access for construction and maintenance
112, AP2-5Provision of balancing pond and associated works and access for maintenance
113Provision of balancing pond and associated works and access for maintenance
Provision of worksite and access for construction and maintenance
124, 129, AP2-5aProvision of balancing pond and associated works and access for maintenance
Provision of environmental mitigation
128Provision of balancing pond and associated works and access for maintenance
Provision of worksite and access for construction
County of Staffordshire District of Lichfield Parish of Drayton Bassett2a, 3, 4a, 4b, 35, 38, 40, 43, 45, 46, 49, 52, 54, 55, 65, 75, 100, AP2-1, AP2-3, AP2-4Provision of environmental mitigation
28Diversion or installation of, or works to, utilities apparatus
7, 23, 29, 50, 86Diversion and installation of overhead electric lines
13a, AP4-1Provision of worksite and access for construction and maintenance
16Provision of worksite and access for construction
19a, AP2-6Provision of balancing pond and associated works and access for maintenance
22, 24Provision of environmental mitigation
Provision of flood mitigation measures
Provision of worksite and access for construction
30Provision of balancing pond and associated works and access for maintenance
Provision of environmental mitigation
33Provision of environmental mitigation
Provision of drainage and associated works
53, 92, 94, 102, AP2-7Provision of environmental mitigation
Provision of worksite and access for construction
58, 59, 63, 68, 71, 80Provision of environmental mitigation
Diversion and installation of overhead electric lines
93Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
99Provision of environmental mitigation
Provision of new public right of way
106Provision of environmental mitigation
Provision of worksite and access for construction
Provision of new public right of way
109, 117, AP2-8 to AP2-10Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
Provision of worksite and access for construction
114, AP2-2Provision of balancing pond and associated works and access for maintenance
Provision of environmental mitigation
Provision of worksite and access for construction
Parish of Fazeley3, 6, 8Diversion and installation of overhead electric lines
Parish of Hints with Canwell15, 17, 18, 87, 88, AP2-20Provision of worksite and access for construction and maintenance
20Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
21, 53, 59, 63, 68, 71a, 72, 74, 81, 122, 128, 141, 145, 147a, AP2-12, AP2-17Provision of environmental mitigation
23, 125, 129Diversion or installation of, or works to, utilities apparatus
24, 50, 62b, 73a, 76a, 77b, 77c, 77d, 84a, 84b, 110, 154Provision of environmental mitigation
Provision of worksite and access for construction
25, 28Provision of worksite and access for construction
Provision of environmental mitigation
Diversion and installation of overhead electric lines
30, 33, 38, 45, 47, 48Diversion and installation of overhead electric lines
35Diversion and installation of overhead electric lines
Provision of new public right of way
Provision of worksite and access for construction
Provision of environmental mitigation
37, 39Diversion and installation of overhead electric lines
Provision of new public right of way
55a, 62a, 62c, 73b, 77a, AP2-9a, AP2-18, AP2-19Provision of environmental mitigation
Provision of new public right of way
Provision of worksite and access for construction
58, AP2-22, AP2-23, AP2-24aProvision of drainage and associated works
61Implementation of woodland management measures
65, 143Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
70Provision of balancing pond and associated works and access for maintenance
Provision of environmental mitigation
75a, 75bProvision of balancing pond and associated works and access for maintenance
Provision of environmental mitigation
Provision of new public right of way
78a, 78b, 96aProvision of environmental mitigation
Provision of flood mitigation measures
80Provision of balancing pond and associated works and access for maintenance
Provision of new public right of way
82aProvision of balancing pond and associated works and access for maintenance
Provision of new public right of way
Implementation of woodland management measures
86Provision of balancing pond and associated works and access for maintenance
94Provision of balancing pond and associated works and access for maintenance
Provision of new public right of way
101Provision of environmental mitigation
Provision of new public right of way
Diversion or installation of, or works to, utilities apparatus
Provision of worksite and access for construction
116 to 118, 123Provision of worksite and access for construction
131aDiversion or installation of, or works to, utilities apparatus
Provision of worksite and access for construction
Provision of new public right of way
153, 155Provision of environmental mitigation
Provision of drainage and associated works
157a, 159Provision of worksite and access for construction
Provision of drainage and associated works
Provision of environmental mitigation
Parish of Weeford7, 24, 27Provision of environmental mitigation
12, 16, 21Provision of worksite and access for construction
14Provision of access for construction and maintenance
20Provision of environmental mitigation
Provision of worksite and access for construction
22Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
AP1-5, AP1-8, AP1-10, AP1-11Diversion and installation of overhead electric lines
AP2-1Provision of drainage and associated works
Parish of Swinfen and Packington11, 16, 23Provision of environmental mitigation
11a, AP2-1, AP2-2Provision of drainage and associated works
12, 15, 29Provision of environmental mitigation
Provision of worksite and access for construction
20Provision of environmental mitigation
Provision of new public right of way
17a, 18a, 19, 22Provision of environmental mitigation
Provision of worksite and access for construction
Provision of new public right of way
33, 34, 42Provision of worksite and access for construction
36, 39Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
37Diversion or installation of, or works to, utilities apparatus
Parish of Whittington5, 17, 63, 67, AP2-25, AP2-26Diversion or installation of, or works to, utilities apparatus
19a, 20a, 23, 101a, AP2-2 to AP2-4Provision of environmental mitigation
92a, 92b, AP2-5, AP2-6Provision of environmental mitigation
Provision of balancing pond and associated works and access for maintenance
28, 29, 31, 100a, 104a, 105a, 107, 112, 114aProvision of worksite and access for construction and maintenance
Diversion or installation of, or works to, utilities apparatus
32, 47, 48Implementation of woodland management measures
37, 41Implementation of woodland management measures
Provision of new public right of way
42, 46Provision of environmental mitigation
Provision of worksite and access for construction
Implementation of woodland management measures
52, 54, 116aProvision of worksite and access for construction and maintenance
58, 64, 66, 98aProvision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
79, 91, AP2-28, AP2-29Provision of worksite and access for construction
81aProvision of worksite and access for construction
Provision of balancing pond and associated works and access for maintenance
25aProvision of environmental mitigation
Provision of access for maintenance
AP2-10, AP2-11, AP2-38Diversion or installation of, or works to, utilities apparatus
Provision of flood mitigation measures
AP2-20Provision of drainage and associated works
94aProvision of environmental mitigation
Provision of drainage and associated works
103aProvision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
Parish of Fradley and StreethayAP2-1, AP2-21Provision of environmental mitigation
AP2-24, AP2-30, AP2-36a, AP2-37, AP2-38, AP2-44, AP2-45, AP2-66, AP2-67, AP2-70, AP2-72, AP2-72a, AP2-76, AP2-80, AP2-82, AP2-106, AP2-134, AP2-135, AP2-135a, AP2-136, AP2-138Provision of worksite and access for construction
AP2-22, AP2-46, AP2-47, AP2-50, AP2-51, AP2-52, AP2-53, AP2-55, AP2-59, AP2-60, AP2-65, AP2-83, AP2-85, AP2-87, AP2-88, AP2-90, AP2-92, AP2-93, AP2-98, AP2-100, AP2-104, AP2-105, AP2-107, AP2-109, AP2-110, AP2-111, AP2-114, AP2-116, AP2-128, AP2-129, AP2-130, AP2-131a, AP2-132, AP2-133, AP2-141, AP2-143, AP2-145, AP2-146, AP2-147, AP2-150, AP2-151, AP2-155, AP2-157Provision of environmental mitigation
Provision of worksite and access for construction
AP2-119, AP2-120, AP2-122Provision of environmental mitigation
Provision of worksite and access for construction
Provision of drainage and associated works
AP2-61, AP2-62, AP2-64Provision of environmental mitigation
Provision of worksite and access for construction
Provision of new public right of way
AP2-40, AP2-43, AP2-68, AP2-71, AP2-163Provision and renewal of railway systems for operational purposes and drainage
AP2-19, AP2-20, AP2-23Diversion or installation of, or works to, utilities apparatus
AP2-16Provision of environmental mitigation
Provision and renewal of railway systems for operational purposes and drainage
Provision of drainage and associated works
AP2-117Provision of new public right of way
Parish of Curborough and ElmhurstAP4-3 to AP4-7Diversion or installation of, or works to, utility apparatus
Parish of LichfieldAP4-3Diversion or installation of, or works to, utility apparatus
Parish of Longdon4 to 6, 8 to 10, 13, 14Diversion and installation of overhead electric lines
Parish of Kings Bromley1, 4Provision and renewal of railway systems for operational purposes and drainage
119, 160, 185, 186, 193a, 194, AP2-3, AP2-5, AP2-8, AP2-9, AP2-11 to AP2-13, AP2-27, AP2-28Provision of environmental mitigation
Provision of worksite and access for construction
98, 100, 114a, 118a, 124a, 130a, AP2-17, AP2-41, AP2-46aProvision of worksite and access for construction and maintenance
AP2-54Provision of balancing pond and associated works and access for maintenance
Provision of environmental mitigation
Provision of worksite and access for construction
AP2-33, AP2-35a, AP2-35b, AP2-35cProvision of worksite and access for construction
Provision of environmental mitigation
Provision of drainage and associated works
52a, 52b, 121Provision of worksite and access for construction
165, AP2-52, AP2-52a, AP2-53Provision of environmental mitigation
AP2-46b, AP2-46cProvision of environmental mitigation
Provision of drainage and associated works
61a, 78, 81, 146, AP2-7, AP2-40, AP4-2, AP4-3, AP4-5, AP4-6, AP4-8, AP4-9Diversion or installation of, or works to, utilities apparatus
62, 65, 140A, 192, 192b, AP1-1 to AP1-5, AP1-7, AP1-9 to AP1-12, AP2-39, AP2-43, AP2-44, AP4-1Diversion and installation of overhead electric lines
83, 90Diversion and installation of overhead electric lines
Provision of environmental mitigation
85a, 86Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
88Provision of access for construction
91, 195, 196Provision of drainage and associated works
95, 168, 187Provision of worksite and access for construction and maintenance
Provision of environmental mitigation
102, AP2-35aProvision of environmental mitigation
Provision of worksite and access for construction and maintenance
Diversion or installation of, or works to, utilities apparatus
128aProvision of worksite and access for construction and maintenance
Diversion or installation of, or works to, utilities apparatus
AP2-31aProvision of worksite and access for construction
Diversion and installation of overhead electric lines
Provision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
138, 139, 142Diversion or installation of, or works to, utilities apparatus
Provision of worksite and access for construction
148Diversion or installation of, or works to, utilities apparatus
Provision of environmental mitigation
Provision of worksite and access for construction
161, 171Provision of environmental mitigation
Provision of worksite and access for construction
Provision of new public right of way
AP2-15, AP2-19, AP2-20a, AP2-21a, AP2-25Provision of worksite and access for construction
Diversion and installation of overhead electric lines
130bProvision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
Provision of drainage and associated works
140cDiversion or installation of, or works to, utilities apparatus
Diversion and installation of overhead electric lines
Provision of balancing pond and associated works and access for maintenance
Provision of drainage and associated works
Parish of Armitage with Handsacre1, 4Provision of worksite and access for construction
11, 14, 15Provision of worksite and access for construction
Provision of drainage and associated works
18, 20, 24, AP2-1 to AP2-3Provision of worksite and access for construction and maintenance
Parish of Colton10, 16, 17Provision and renewal of railway systems for operational purposes and drainage
Borough of Stafford Parish of Colwich24, AP2-1Provision and renewal of railway systems for operational purposes and drainage
Metropolitan Borough of Solihull Parish of Berkswell2a, 4, 28a, AP2-4Provision of environmental mitigation
Provision of worksite and access for construction
6a, 6b, 8, 9, 10, 12, 17, 32c, 67, AP2-8, AP2-9Provision of worksite and access for construction
24, 26b, 47, 54, 71, 72Diversion and installation of overhead electric lines
31Provision of environmental mitigation
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
35Provision of environmental mitigation
Provision of worksite and access for construction and maintenance
Diversion or installation of, or works to, utilities apparatus
Provision of electricity supply system and access
36a, 36bProvision of environmental mitigation
Diversion or installation of, or works to, utilities apparatus
37Provision of electricity supply system and access
42, AP2-10, AP2-11Provision of environmental mitigation
Provision of worksite and access for construction
Provision of new public right of way
43Provision of environmental mitigation
Provision of worksite and access for construction
Installation of ground anchors
53Provision of new public right of way
55Provision of environmental mitigation
Provision of drainage and associated works
Provision of worksite and access for construction
Provision of new public right of way
59Provision of worksite and access for construction
Provision of new public right of way
60, 64 and 69Provision of drainage and associated works
Provision of worksite and access for construction
63Provision of environmental mitigation
Provision of drainage and associated works
32b, 127, 128, 134, 145, 164a, 165c, 209, AP2-14Provision of environmental mitigation
129, 136, 167, 168a, 168c, 169, 170, 172a, 174, 185, 186, 188, 191, 193, 205, 207, 216, 218, 219, 231, 236Provision of worksite and access for construction
130a, 142Provision and renewal of railway systems for operational purposes and drainage
143Provision of a worksite and access for construction and maintenance
Provision of balancing pond and associated works and access for maintenance
140, 141, 162, 175, 206, 211, 220, 230Provision of worksite and access for construction and maintenance
147, 151, 152, 153, 155Provision of worksite and access for construction and maintenance
Diversion or installation of, or works to, utility apparatus
Provision of environmental mitigation
158Provision of flood mitigation measures
Provision of worksite and access for construction and maintenance
172, 221, 222Provision of flood mitigation measures
Provision of worksite and access for construction
195, 204, 208, 238Provision of environmental mitigation
Provision of worksite and access for construction
223, 233Provision of balancing pond and associated works and access for maintenance
Parish of Meriden3Provision of environmental mitigation
Provision of worksite and access for construction
Parish of Hampton-in-Arden1Provision of worksite and access for construction and maintenance
Provision of new public right of way
2Provision of environmental mitigation
4, 6, AP2-6Provision of environmental mitigation
Provision of worksite and access for construction
7, 15, 16, 16b, 17, 17b, 18, 27 to 29, 30a, 31a, 37b, 50a, 52, 54, 62, AP2-24Provision of worksite and access for construction
8, 26, 34, 45, 55Provision of balancing pond and associated works and access for maintenance
9Provision of drainage and associated works
16a, 17a, 18a, AP2-8, AP2-10, AP2-11Provision of worksite and access for construction
Provision of flood mitigation measures
22Provision of worksite and access for construction and maintenance
24, 43Provision of a turning head
36, 41Provision of worksite and access for construction and maintenance
Provision of balancing pond and associated works and access for maintenance
35, 42Provision of worksite and access for construction and maintenance
Provision of balancing pond and associated works and access for maintenance
Provision of new public right of way
46aProvision of balancing pond and associated works and access for maintenance
Provision of new public right of way
47aProvision of worksite and access for construction
Diversion or installation of, or works to, utility apparatus
49Provision of flood mitigation measures
25b, 25cMinor highway alterations
37aProvision of balancing pond and associated works and access for maintenance
Provision of drainage and associated works
Provision of environmental mitigation
47bProvision of worksite and access for construction
Diversion of installation of or works to, utilities apparatus
Provision of new public rights of way
Provision of worksite and access for construction
AP2-26Provision of drainage and associated works
Parish of Bickenhill2, 3Provision of balancing pond and associated works and access for maintenance
6, 7, 10, 18, 22, 23, 29, 31, 32, 35, 46, 48, 57, 60, 61, 69, 71a, 74 to 76Provision of worksite and access for construction
37, 40, 41b, 62, 69aProvision of worksite and access for construction
Diversion and installation of overhead electric lines
41Provision of worksite and access for construction and maintenance
Diversion and installation of overhead electric lines
12Provision of balancing pond and associated works and access for maintenance
11Provision of balancing pond and associated works and access for maintenance
Minor highway alterations
42a, 42b, 42c, 57a, 57b, 57cProvision and renewal of railway systems for operational purposes and drainage
58Diversion or installation of, or works to, utilities apparatus
71Provision of worksite and access for construction
Diversion and installation of overhead electric lines
Provision of balancing pond and associated works and access for maintenance
71bProvision of environmental mitigation
Provision of worksite and access for construction
Diversion and installation of overhead electric lines
Provision of balancing pond and associated works and access for maintenance
85Provision of environmental mitigation
Diversion and installation of overhead electric lines
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
87Provision of environmental mitigation
90Provision of environmental mitigation
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
88Provision of balancing pond and associated works and access for maintenance
Diversion or installation of, or works to, utilities apparatus
91Diversion or installation of, or works to, utilities apparatus
Reinstatement of businesses or facilities
91aReinstatement of businesses or facilities
Parish of Dickens HeathAP4-1Reinstatement of businesses or facilities
Parish of Chelmsley Wood6Provision of worksite and access for construction and maintenance
City of Birmingham1aDiversion and installation of overhead electric lines
3a, 4b, 4c, AP2-11, AP2-12Provision of worksite and access for construction
5aProvision of environmental mitigation
12Provision of environmental mitigation
Provision of worksite and access for construction
8Provision of environmental mitigation
Provision of worksite and access for construction
Diversion or installation of, or works to, utilities apparatus
9Provision of environmental mitigation
Provision of flood mitigation measures
9a and 9bProvision of environmental mitigation
Provision of flood mitigation measures
Diversion and installation of overhead electric lines
13a, 15, 29, 32, 33Provision of environmental mitigation
Provision of worksite and access for construction
Provision of flood mitigation measures
14, 28Provision of environmental mitigation
Provision of worksite and access for construction
Diversion and installation of overhead electric lines
Provision of flood mitigation measures
16, 31, 54 to 56, 69, 78, 157m, 157n, 157p, 157q, 157s, 159, 163, 194, 195, 196, 214 to 216, 218, 281, 282, 300h, 308, 315, 316, 320, 327, 328, 330, 353, 364, 385, 386, 401Provision of worksite and access for construction
23, 24, 27Provision of worksite and access for construction
Diversion and installation of overhead electric lines
26Provision of environmental mitigation
41Provision of balancing pond and associated works and access for maintenance
Provision of environmental mitigation
46, 151, 157r, 245, 264, 267, 300a, 300b, 300c, 478, 479Provision of worksite and access for construction
Diversion or installation of, or works to, utility apparatus
63a, 63b, 63c, 63d, 63f, 63g, 63h, 63i, 63j, 63k, 85a, 85b, 85c, 85d, 85e, 85f, 85g, 85h, 85i, 85j, 85k, 87c, 87e, 87f, 87g, 87h, 87i, AP2-5, AP2-7, AP2-9, AP4-25 to AP4-28Reinstatement of businesses or facilities
67Provision of worksite and access for construction
Provision and renewal of railway systems for operational purposes and drainage
102a, 102b, 102c, 102d, 157d, 157f, 157h, 157i, 157k, 246, 248, 251a, 251b, 251c, 251d, 251e, 251f, 251g, 251h, 251j, 251k, 251n, 261, 263, AP4-20 to AP4-22, AP4-24Diversion or installation of, or works to, utility apparatus
157c, 157e, 157g, 274a, 322, 355, 363, 376Provision and renewal of railway systems for operational purposes and drainage
223Provision of worksite and access for construction
Provision of access for construction and maintenance
268Provision and renewal of railway systems for operational purposes and drainage
Diversion or installation of, or works to, utility apparatus
269, 271 to 273, 324, 419Provision of worksite and access for construction
Provision of balancing pond and associated works and access for maintenance
300d, 300eRemoval of utility apparatus
19, 304, 305, 306, 326, 326aProvision of balancing pond and associated works and access for maintenance
332, 334, 339, 340, 345, 346, 360, 366, 379, 384, 387, 388, 395, AP4-30, AP4-31Provision of worksite and access for construction and maintenance
367, 368Provision and renewal of railway systems for operational purposes and drainage
Provision of worksite and access for construction and maintenance
437Provision of worksite and access for construction
Provision of a turning head
317Minor highway alterations
City of Manchester1 to 6Modification to depot

Back to top

Options/Help

Print Options

You have chosen to open The Whole Act

The Whole Act you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open The Whole Act as a PDF

The Whole Act you have selected contains over 200 provisions and might take some time to download.

Would you like to continue?

You have chosen to open the Whole Act

The Whole Act you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

You have chosen to open Schedules only

The Schedules you have selected contains over 200 provisions and might take some time to download. You may also experience some issues with your browser, such as an alert box that a script is taking a long time to run.

Would you like to continue?

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

See additional information alongside the content

Show Explanatory Notes for Sections: Displays relevant parts of the explanatory notes interweaved within the legislation content.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

Explanatory Notes

Text created by the government department responsible for the subject matter of the Act to explain what the Act sets out to achieve and to make the Act accessible to readers who are not legally qualified. Explanatory Notes were introduced in 1999 and accompany all Public Acts except Appropriation, Consolidated Fund, Finance and Consolidation Acts.

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources