xmlns:atom="http://www.w3.org/2005/Atom" xmlns:atom="http://www.w3.org/2005/Atom"

SCHEDULES

SCHEDULE 4E+W+SReservoirs

High-risk reservoirsE+W

8E+WIn section 7 (certificates of construction engineers) in subsection (5) after “a reservoir” insert “ which is designated, or in the opinion of the engineer is likely to be designated, as a high-risk reservoir ”.

Commencement Information

I1Sch. 4 para. 8 in force at 30.7.2013 for E. by S.I. 2013/1590, art. 3(b)

I2Sch. 4 para. 8 in force at 1.4.2016 for W. by S.I. 2016/79, art. 2(b)