SCHEDULES
C1SCHEDULE 1Risk Management: Designation of Features
Annotations:
Modifications etc. (not altering text)
“Designating authority”
I11
In this Schedule “designating authority” means—
a
the Environment Agency,
F1aa
the Natural Resources Body for Wales,
b
a lead local flood authority,
c
a district council (whether or not it is a lead local flood authority), and
d
an internal drainage board.
Sch. 1 excluded (24.9.2014) by The Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 (S.I. 2014/2384), art. 1, Sch. 19 Pt. 1 para. 11