SCHEDULES

SCHEDULE 3Highways

Section 3

Stopping-up

C41

1

The nominated undertaker may, in connection with the construction of the works authorised by this Act, stop up each of the highways or parts of highways specified in the following table.

2

No highway or part of a highway specified in columns (1) and (2) of Part 1 of the following table shall be stopped up under this paragraph unless all the land which abuts on it falls within one or more of the following categories, namely—

a

land to which there is no right of access directly from the highway or part to be stopped up,

b

land to which there is reasonably convenient access otherwise than directly from the highway or part to be stopped up,

c

land the owners and occupiers of which have agreed to the stopping up of the highway or part, and

C1d

land which is in the possession of the Secretary of State.

3

No highway or part of a highway specified in columns (1) and (2) of Part 2 of the following table shall be stopped up under this paragraph if a new highway is specified in relation to it in column (3) of that Part of the table, by reference to the letters and numbers shown on the deposited plans or by reference to scheduled works, until—

a

where the new highway is provided in exercise of the powers conferred by this Act, the later of the date of practical completion and the date on which it is first open for public use, and

b

where it is not, the date on which it is first open for public use.

4

Where a new highway specified in column (3) of Part 2 of the following table is provided in exercise of the powers conferred by this Act, the date of practical completion of the highway, or the date on which it is first open for public use, shall be taken for the purposes of sub-paragraph (3) to be what it is taken to be for the purposes of paragraph 11(2).

Part 1

(1)

(2)

Area

Highway or part to be stopped up

City of Westminster

Footpath within Westbourne Green Sports Complex between points P5, P6 and P7

North-eastern side of Eastbourne Terrace within extent of narrowing shown on the deposited plans

Falconberg Court

London Borough of Camden

Andrew Borde Street

London Borough of Islington

Cowcross Street between points P1 and P2

City of London

Hayne Street between points P3 and P4

Fore Street Avenue between points P1 and P2

Moorfields between points P2 and P3

London Borough of Tower Hamlets

Fulbourne Street between points P1 and P2

Court Street between points P3 and P4

Wood's Buildings between points P5 and P6

South-eastern side of Durward Street within the extent of narrowing shown on the deposited plans between points P2 and P7

Garden Street between points P5 and P6

Eleanor Street between points P1 and P2

London Borough of Greenwich

Bostall Manorway between points P3 and P4

Abbey Terrace between points P5 and P6

London Borough of Havering

Footpath (FP 123) between Beechfield Gardens and Nursery Walk

Part 2

(1)

(2)

(3)

Area

Highway or part to be stopped up

New highway to be substituted for it

City of Westminster

Westbourne Park Passage within the limits of deviation of Work No. 1/9C

Work No. 1/9C

Westbourne Park Passage within the limits of deviation of Work No. 1/9D

Work No. 1/9D

London Borough of Tower Hamlets

Footpath between Stepney Way and Stepney Green between points P1, P2 and P3 and between points P2 and P4

New footpath between points P1, P4, P5 and P6

London Borough of Newham

Footpaths between the Excel Centre and Victoria Dock Road between points P1, P2, P3, P4, P5, P6, P7, P8 and P9 and between points P6 and P11

New footpath through intended station, part of Work No. 1/5 between points P10 and P11

Footpath between Albert Road and Factory Road between points P1 and P2

Work No. 1/32D

Barbers Road between points P1 and P2

Works Nos. 2/6A, 2/6B and 2/7

Pudding Mill Lane between points P3 and P4

Works Nos. 2/6A, 2/6B and 2/7

Marshgate Lane within the relevant limits

Works Nos. 2/6A and 2/6B

Footpath (Greenway) between points P6, P7, P8, P9, P10, P11, P12 and P13 and between points P9 and P11

New footpath between points P5, P14 and P13

London Borough of Greenwich

Footpath on eastern side of Church Manor Way between points P1 and P2

Work No. 1/34

Footpath between Mottisfont Road and Bostall Manor Way between points P1 and P2

Work No. 1/36

London Boroughs of Greenwich and Bexley

Footpaths over Abbey Wood Station between points P7, P8, P9, P10 and P11 and between points P11 and P12

New footpath through intended station, part of Work No. 1/7

Felixstowe Road within the relevant limits

Work No. 1/37B

London Borough of Bexley

Gayton Road

Work No. 1/37C

London Borough of Barking & Dagenham

Footpath on eastern side of Whalebone Lane South between points P1 and P3

New footpath between points P1, P2 and P3

London Borough of Havering

Footpath adjacent to bus stand, Atlanta Boulevard

Work No. 2/15D

County of Berkshire, Borough of Slough

Hollow Hill Lane between points P1 and P2

Work No. 3/9D

County of Buckinghamshire, District of South Bucks, Parish of Iver

Thorney Lane South between points P1 and P2

Works Nos. 3/9B and 3/9C

London Borough of Hillingdon

Footpath and cycleway (Kingston Lane) between points P1 and P2

Work No. 3/10F

Old Stockley Road between points P1 and P2

Footpath and cycleway between points P1 and P2 (Work No. 3/14)

C52

1

The nominated undertaker may, in connection with the construction of the works authorised by this Act, stop up any bridleway or footpath, or part of a bridleway or footpath, which is—

a

within the limits of deviation for the scheduled works or within the limits of land to be acquired or used, and

b

not specified in columns (1) and (2) of the table in paragraph 1.

2

The power conferred by sub-paragraph (1) shall not be exercised unless the proposed stopping up has been confirmed by the appropriate Ministers upon application by the nominated undertaker.

3

The appropriate Ministers shall grant an application under sub-paragraph (2) if, but only if, they are satisfied—

a

that an alternative bridleway or footpath has been provided,

b

that an alternative bridleway or footpath will be provided before the proposed stopping up takes place, or

c

that the provision of an alternative bridleway or footpath is not required.

4

Where the appropriate Ministers grant an application under sub-paragraph (2), they shall notify the nominated undertaker of the basis on which the application is granted.

5

Where the basis on which an application under sub-paragraph (2) is granted is that an alternative bridleway or footpath will be provided, the proposed stopping up shall not take place until the alternative has been provided.

6

Before making an application under sub-paragraph (2), the nominated undertaker shall publish in at least one local newspaper circulating in the relevant area a notice—

a

specifying—

i

the bridleway or footpath, or part, proposed to be stopped up,

ii

what, if any, alternative bridleway or footpath is proposed, and

iii

if no alternative is proposed, the reasons why,

b

specifying a place in the relevant area where a map or plan illustrating the proposals may be inspected by any person free of charge at all reasonable hours during a period of 28 days from the date of publication of the notice (“the publication date”),

c

stating that any person may within that period make representations about confirmation under sub-paragraph (2) of the proposed stopping up, and

d

specifying the manner in which such representations may be made.

7

Not later than the publication date, the nominated undertaker shall—

a

serve a copy of the notice, together with any map or plan to which it refers, on every local authority whose area includes any of the land on which the bridleway or footpath, or part, proposed to be stopped up is situated, and

b

cause a copy of the notice to be displayed in a prominent position at the ends of the bridleway or footpath, or part, proposed to be stopped up.

8

Before granting an application under sub-paragraph (2), the appropriate Ministers shall consider any representations made to them in accordance with the nominated undertaker's notice which have not been withdrawn.

9

Unless they direct otherwise, the appropriate Ministers' functions in relation to an application under sub-paragraph (2) shall, instead of being carried out by them, be carried out by a person appointed by them for the purpose.

10

In sub-paragraph (6), references to the relevant area are to the area in which the bridleway or footpath, or part, proposed to be stopped up is situated.

11

In sub-paragraph (7)(a), “local authority” means—

a

the council of a county, district, parish or London borough,

b

the Common Council of the City of London,

F1c

the London Fire Commissioner,

d

a joint authority established by Part 4 of the Local Government Act 1985 (c. 51),

e

a housing action trust established under Part 3 of the Housing Act 1988 (c. 50), and

f

the parish meeting of a rural parish not having a separate parish council.

12

In this paragraph, references to the appropriate Ministers are to the Secretary of State for Environment, Food and Rural Affairs and the Secretary of State for Transport and, in relation to the carrying out of any functions, are to those Ministers acting jointly.

C63

1

On a highway or part of a highway being stopped up under paragraph 1 or 2—

a

all rights of way over or along it shall be extinguished, and

C2b

the Secretary of State may appropriate and use, without making any payment, so much of the site of it as is bounded on both sides by land which he owns.

2

The nominated undertaker shall compensate any person who suffers loss by the extinguishment under this paragraph of a private right of way.

3

Any dispute as to a person's entitlement to compensation under sub-paragraph (2), or as to the amount of such compensation, shall be determined under and in accordance with Part 1 of the Land Compensation Act 1961 (c. 33).

C34

The Secretary of State shall not be entitled to any mines or minerals under land which he is entitled to appropriate and use under sub-paragraph (1)(b), with the exception of minerals necessarily extracted or used in the construction of the undertaking which the nominated undertaker is authorised to carry on by this Act.

C35

Part 3 of Schedule 2 to the Acquisition of Land Act 1981 (c. 67) (regulation of the working of mines or minerals underlying an authorised undertaking) shall apply in relation to the working of any mines or minerals underlying land which the Secretary of State is entitled to appropriate and use under sub-paragraph (1)(b) with the following modifications—

a

references to the undertaking shall be construed as references to the undertaking which the nominated undertaker is authorised to carry on by this Act,

b

in paragraphs 3 to 5 and 7 to 9, references to the acquiring authority shall be construed as references to the nominated undertaker, and

c

in paragraph 6, the first of the references to the acquiring authority shall be construed as a reference to the nominated undertaker.

Permanent obstruction

4

1

The powers conferred by paragraph 1 or 4 of Schedule 2 may be exercised in such a way as to obstruct the highway, but only with the consent of the highway authority, such consent not to be unreasonably withheld.

2

Any dispute with a highway authority under sub-paragraph (1) shall, if the parties agree, be referred to arbitration, but shall otherwise be determined by the Secretary of State.

3

If a highway authority which receives an application for consent under sub-paragraph (1) fails to notify the applicant of its decision on the application before the end of the period of 28 days beginning with the date on which the application was made, it shall be deemed to have granted it.

Temporary interference

5

C71

For the purposes of the works authorised by this Act, the nominated undertaker may—

a

temporarily stop up or alter or divert any highway or part of a highway,

b

for any reasonable time divert traffic from, and prevent persons passing along, any highway or part of a highway, and

c

break up or interfere with any highway or part of a highway (including any sewer, drain or tunnel in it).

C72

The nominated undertaker shall provide reasonable access for pedestrians going to or from premises abutting on a highway affected by the exercise of the powers conferred by sub-paragraph (1) if there would otherwise be no such access.

C73

Before exercising the powers conferred by sub-paragraph (1) in relation to a highway and to an extent specified in the following table, the nominated undertaker shall consult the highway authority about the exercise of the powers.

(1)

(2)

(3)

Area

Highway or part to be stopped up

Extent of temporary stopping up

City of Westminster

Westbourne Park Passage

Between points T1 and T2

Harrow Road

Between points T1 and T2

Westbourne Park Villas

Between points T3 and T4

Bishop's Bridge Road

Within the relevant limits

Eastbourne Terrace

Entire length

Cleveland Terrace

Within the relevant limits

Chilworth Street

Within the relevant limits

South Wharf Road

Within the relevant limits

Praed Street

Within the relevant limits

Craven Road

Within the relevant limits

Westbourne Terrace

Within the relevant limits

Chilworth Mews

Entire length

Eastbourne Mews

Entire length

Spring Street

Between points T1 and T2

Bayswater Road

Between points T1 and T2

Park Lane

Between points T4 and T5 on Sheet No. 8 of the deposited Plans and points T5 and T6 on Sheet No. 42 of the deposited Plans

Pedestrian subway between western and eastern sides of Park Lane

Between points T1, T2 and T3

Weighhouse Street

Between points T1 and T2

Gilbert Street

Between points T1 and T3

St. Anselm's Place

Entire length

Davies Street

Within the relevant limits

South Molton Lane

Between points T4 and T5

Stratford Place

Within the relevant limits

Marylebone Lane

Within the relevant limits

Dering Street

Within the relevant limits

New Bond Street

Within the relevant limits

Brook Street

Within the relevant limits

Tenterden Street

Entire length

Hanover Square

Entire length

Princes Street

Within the relevant limits

St George Street

Within the relevant limits

Wardour Street

Between points T5 and T6

Hollen Street

Within the relevant limits

Sheraton Street

Within the relevant limits

Oxford Street

Within the relevant limits

Newman Street

Within the relevant limits

Great Chapel Street

Entire length

Diadem Court

Entire length

Fareham Street

Entire length

Dean Street

Within the relevant limits

Soho Square

Between points T1 and T2

Carlisle Street

Entire length

Falconberg Mews

Entire length

Sutton Row

Entire length

Greek Street

Within the relevant limits

Manette Street

Entire length

Goslett Yard

Entire length

City of Westminster and London Borough of Camden

Tottenham Court Road

Within the relevant limits

Charing Cross Road

Within the relevant limits

St Giles Circus

Entire length

London Borough of Camden

New Oxford Street

Within the relevant limits

Earnshaw Street

Entire length

Denmark Street

Entire length

Denmark Place

Between points T5 and T6

St Giles High Street

Between points T3 and T4

Fisher Street

Entire length

Southampton Row

Between points T1 and T2

Catton Street

Entire length

Red Lion Square

Between points T3 and T4

Drake Street

Between points T5 and T3

London Boroughs of Camden and Islington

Farringdon Road

Within the relevant limits

City of London

Farringdon Street

Within the relevant limits

West Smithfield

Within the relevant limits

Snow Hill

Within the relevant limits

Long Lane

Within the relevant limits

Lindsey Street

Entire length

Hayne Street

Between points T3 and P4

Aldersgate Street

Within the relevant limits

Eldon Street

Entire length

London Wall

Within the relevant limits

Fore Street Avenue

Between points T1 and T2

Silk Street

Within the relevant limits

Moor Lane

Between points T3 and T4

Moorfields

Entire length

Moor Place

Entire length

Keats Place

Entire length

Moorgate

Within the relevant limits

Finsbury Circus

Within the relevant limits

Circus Place

Entire length

Blomfield Street

Entire length

Broad Street Avenue

Entire length

Liverpool Street

Entire length

Old Broad Street

Within the relevant limits

Wormwood Street

Entire length

Bishopsgate

Within the relevant limits

Camomile Street

Within the relevant limits

Grand Avenue

Within the relevant limits

Eldon Street

Within the relevant limits

London Boroughs of Islington and Camden and City of London

Charterhouse Street

Within the relevant limits

London Borough of Islington and City of London

Charterhouse Square

Entire length

Carthusian Street

Entire length

Ropemaker Street

Within the relevant limits

South Place

Entire length

London Borough of Islington

St John Street

Within the relevant limits

Finsbury Pavement

Within the relevant limits

Finsbury Street

Within the relevant limits

Fox & Knot Street

Entire length

Turnmill Street

Within the relevant limits

Cowcross Street

Between points P2 and T1

London Borough of Tower Hamlets

Princelet Street

Between points T1 and T2

Hanbury Street

Between points T3 and T4

Vallance Road

Between points T3 and T4 and points T5 and T6

Whitechapel Road

Within the relevant limits

Spelman Street

Within the relevant limits

Durward Street

So much as is not permanently stopped up within the extent of narrowing shown on the deposited plans

Court Street

Between points T9 and P3

Castlemaine Street

Between points T7 and T8

Fulbourne Street

Between points P1 and T10

Winthrop Street

Entire length

Brady Street

Within the relevant limits

Stepney Green

Between points T1 and T2 and within the relevant limits

Garden Street

T3 and P5

White Horse Lane

Within the relevant limits

Stepney High Street

Within the relevant limits

Stepney Way

Within the relevant limits

Commercial Road

Between points T1 and T2

Mile End Road

Within the relevant limits

Footpath between Cheshire Street and Fleet Street Hill

Between points T1 and T2

Brady Street

Within the relevant limits

Tapp Street

Between points T5 and T6

Collingwood Street

Between points T7 and T8

Hemming Street

Between points T9 and T10

Cudworth Street

Between points T6, T8 and T2

Coventry Road

Between points T1 and T2

Buckhurst Street

Between points T3 and T4

Cambridge Heath Road

Within the relevant limits

Braintree Street

Within the relevant limits

Mantus Road

Between points T5 and T6

Globe Road

Between points T7 and T8

Bancroft Road

Between points T9 and T10

Morpeth Street

Within the relevant limits

Longnor Road

Between points T1 and T2

Grove Road

Within the relevant limits

Burdett Road

Within the relevant limits

Eleanor Street

Within the relevant limits

Rounton Road

Between points T3 and T4

Wick Lane

Within the relevant limits

Wrexham Road

Between points T9 and T10

Blackwall Tunnel Northern Approach Road

Between points T3 and T4, points T5 and T6, points T7 and T8 and points T11 and T12

Bow Road

Between points T12 and T13

Payne Road

Between points T11 and T13

West India Dock Road

Between points T1 and T2

London Borough of Newham

Lower Lea Crossing

Between points T1 and T2

Victoria Dock Road

Between points T1, T2 and T3

Freemasons Road

Within the relevant limits

North Woolwich Road

Within the relevant limits

Footpath FP 108 between Festoon Way and Connaught Bridge

Between points T1 and T2 and points T3 and T4

Footpath between Connaught Road and Factory Road

Within the relevant limits

Connaught Bridge

Within the relevant limits

Connaught Road

Within the relevant limits

Albert Road

Within the relevant limits

Factory Road

Within the relevant limits

Store Road

Entire length

Pier Road

Within the relevant limits

Bankside footpath on the eastern side of the River Lea

Within the relevant limits

Barbers Road / Cook's Road

Between points T3 and P1

Pudding Mill Lane

Between points T4 and P3 and points P4 and T5

Footpath (Greenway) adjacent to Marshgate Lane on northern side of the railway

Between points T6 and T7 and points T6 and T8

Footpath adjacent to City Mill River

Between points T9 and T11

Footpath (Greenway) on eastern side of City Mill River

Between points T12 and T13 and points P13, T10 and T13

Marshgate Lane

Between points T1 and T2

Manor Park Road

Between points T1 and T2

Lugg Approach

Within the relevant limits

Goodmayes Road

Within the relevant limits

London Borough of Greenwich

Warren Lane

Within the relevant limits

Beresford Street

Within the relevant limits

Plumstead Road

Within the relevant limits

Gunning Street

Within the relevant limits

Reidhaven Road

Within the relevant limits

White Hart Road

Within the relevant limits

Marmadon Road

Within the relevant limits

Church Manor Way

Within the relevant limits

Mottisfont Road

Within the relevant limits

Bostall Manorway

Within the relevant limits

London Boroughs of Greenwich and Bexley

Felixstowe Road

Within the relevant limits

Harrow Manorway

Within the relevant limits

London Borough of Bexley

Wilton Road

Within the relevant limits

Florence Road

Within the relevant limits

Fendyke Road

Within the relevant limits

Alsike Road

Within the relevant limits

Footpath FP 3 adjacent to River Thames at Manor Wharf, Belvedere

Between points T1, T2 and T3 and points T4 and T2

Footpath FP 4 between Norman Road and the footpath FP 3 adjacent to River Thames at Manor Wharf, Belvedere

Between points T4 and T5 and points T6 and T7

London Borough of Redbridge

Goodmayes Road

Within the relevant limits

London Borough of Barking & Dagenham

Valence Avenue

Within the relevant limits

Saville Road

Within the relevant limits

London Boroughs of Barking & Dagenham and Havering

Crow Lane

Within the relevant limits

London Borough of Havering

Nursery Walk and FP 127

Within the relevant limits

London Road

Within the relevant limits

Jutsums Lane

Within the relevant limits

Footpath FP 123 within Jutsums Recreational Ground

Within the relevant limits

Cambridge Avenue

Between points T1 and T2

Oldchurch Road

Within the relevant limits

Waterloo Road

Within the relevant limits

Exchange Street

Within the relevant limits

Havanna Close

Within the relevant limits

Eastern Road

Within the relevant limits

Atlanta Boulevard

Within the relevant limits

Footpath FP 128 between Exchange Street and The Battis

Between points T1 and T2

South Street

Within the relevant limits

Crossways

Within the relevant limits

Upper Brentwood Road

Within the relevant limits

Southend Arterial Road Footway

Within the relevant limits

Station Road

Within the relevant limits

County of Essex, Borough of Brentwood

Hunter Avenue

Within the relevant limits

Alexander Lane

Within the relevant limits

County of Essex, District of Basildon

Footpath FP 136 between the Meads and Terminus Drive

Within the relevant limits

County of Berkshire, Royal Borough of Windsor & Maidenhead

Silco Drive

Within the relevant limits

Shoppenhanger's Road

Between points T1 and T2

Station Approach

Within the relevant limits

County of Berkshire, Borough of Slough

Burnham Lane

Within the relevant limits

Dover Road

Within the relevant limits

Leigh Road

Between points T1 and T2

Farnham Road (A355)

Between points T1 and T2

Stoke Poges Lane

Within the relevant limits

Footpath and steps within Salt Hill Pleasure Grounds

Within the relevant limits

William Street

Within the relevant limits

Wexham Road

Within the relevant limits

Uxbridge Road

Within the relevant limits

Middlegreen Road

Between points T1 and T2

St. Mary's Road

Within the relevant limits

Trenches Bridge footpath (FP 47a) and cycleway

Within the relevant limits

Hollow Hill Lane

Within the relevant limits

Market Lane

Within the relevant limits

County of Buckinghamshire, District of South Bucks, Parish of Iver

Bathurst Walk

Within the relevant limits

Footpath FP 16 between Colne Valley Way and Court Lane

Within the relevant limits

London Borough of Hillingdon

Weirside Gardens

Within the relevant limits

Horton Bridge Road

Between points T1 and PI

Kingston Lane

Between points T2 and P2

Stockley Road

Between points T1 and T2

Station Road, Hayes

Within the relevant limits

Subway between Blyth Road and Station Approach

Between points T1 and T2

Station Approach

Entire length

Keith Road

Within the relevant limits

Nestle's Avenue

Within the relevant limits

London Borough of Ealing

Footpath FP 112 between Park Avenue and Merrick Road

Within the relevant limits

Golden Manor

Within the relevant limits

Alwyne Road

Within the relevant limits

Manor Road

Within the relevant limits

Haven Green

Within the relevant limits

The Mall

Within the relevant limits

Noel Road

Within the relevant limits

Twyford Avenue

Within the relevant limits

Oakley Avenue

Within the relevant limits

Horn Lane

Within the relevant limits

4

The purpose of consultation under sub-paragraph (3) shall be to ensure public safety and, so far as reasonably practicable, to reduce public inconvenience.

5

Before exercising the powers conferred by sub-paragraph (1) in relation to a highway, or to an extent, not specified in the table in sub-paragraph (3), the nominated undertaker shall obtain the consent in writing of the highway authority.

6

Consent under sub-paragraph (5) shall not be unreasonably withheld, but may be given subject to such conditions as the highway authority may reasonably require in the interest of public safety or convenience.

7

If a highway authority which receives an application for consent under sub-paragraph (5) fails to notify the applicant of its decision on the application before the end of the period of 28 days beginning with the date on which the application was made, it shall be deemed to have granted the application.

8

Sub-paragraph (7) shall have effect in relation to an application for consent which relates to a GLA side road (within the meaning of the Road Traffic Regulation Act 1984 (c. 27)) or a road which is designated under section 60(1) or 61(1) of the Traffic Management Act 2004 (c. 18) (roads in Greater London which are strategic roads) with the substitution for “28” of “ 42 ”.

9

Any dispute with a highway authority about consent under sub-paragraph (5) shall, if the parties agree, be referred to arbitration, but shall otherwise be determined by the Secretary of State.

10

It is hereby declared for the avoidance of doubt that there is no need to reinstate a highway or part of a highway in relation to which any of the powers conferred by sub-paragraph (1) has been exercised where the exercise of the power comes to an end on the exercise, in relation to the highway or part, of the power conferred by paragraph 1(1) or 2(1).

Working sites in highways

C86

Any highway or part of a highway which is stopped up under paragraph 5(1)(a) may be used as a working site if it is within the limits of deviation for the scheduled works or within the limits of land to be acquired or used.

Street works

C97

1

The nominated undertaker may, for the purposes of the works authorised by this Act, enter upon any highway within the limits of deviation for the scheduled works or within the limits of land to be acquired or used and—

a

place, maintain or alter, or change the position of, apparatus in it,

b

remove apparatus from it, and

c

execute any works required for, or incidental to, any works authorised by paragraph (a) or (b).

2

In this paragraph, “apparatus” has the same meaning as in Part 3 of the New Roads and Street Works Act 1991 (c. 22).

C108

1

Works to which sub-paragraph (2) below applies shall be treated for the purposes of Part 3 of the New Roads and Street Works Act 1991 (street works) as major transport works if—

a

they are of a description mentioned in any of paragraphs (a), (c) to (e), (g) and (h) of section 86(3) of that Act (which defines what highway authority works are major highway works), or

b

they are works which, had they been executed under the powers of the highway authority, might have been carried out in exercise of the powers conferred by section 64 (dual carriageways and roundabouts) or 184 (vehicle crossings over footways and verges) of the Highways Act 1980 (c. 66).

2

This sub-paragraph applies to any works executed under this Act in relation to a highway which consists of or includes a carriageway, other than those executed under power delegated to a highway authority by an agreement under paragraph 14(2) below.

Construction

C119

1

Where under this Act the nominated undertaker—

a

constructs a new highway, or

b

alters a highway, otherwise than by carrying out street works within the meaning of Part 3 of the New Roads and Street Works Act 1991,

the construction or alteration shall be completed to the reasonable satisfaction of the highway authority.

2

Where work to which sub-paragraph (1) applies has been completed to the reasonable satisfaction of a highway authority, it shall certify that fact in writing to the nominated undertaker.

3

If the nominated undertaker requests a highway authority to issue a certificate under sub-paragraph (2) and the highway authority does not before the end of the period of 28 days beginning with the date on which the request was made—

a

issue a certificate under that sub-paragraph, or

b

notify the nominated undertaker of its decision to refuse to issue such a certificate,

it shall be deemed to have issued such a certificate at the end of that period.

4

Any dispute with a highway authority under this paragraph shall, if the parties agree, be referred to arbitration, but shall otherwise be determined by the Secretary of State.

C1210

1

Sub-paragraph (2) applies where under this Act the nominated undertaker—

a

realigns a highway which is constituted by or comprises a carriageway, or

b

constructs a new highway which is constituted by or comprises a carriageway.

2

The realignment, or construction, shall be carried out in accordance with plans, sections and specifications approved by the highway authority at the request of the nominated undertaker, such approval not to be unreasonably withheld.

3

Any dispute with a highway authority under sub-paragraph (2) shall, if the parties agree, be referred to arbitration, but shall otherwise be determined by the Secretary of State.

4

If, on application by the nominated undertaker for the approval of plans, sections or specifications under sub-paragraph (2), the highway authority fails to notify the nominated undertaker of its decision on the application before the end of the period of 28 days beginning with the date on which the application was made, it shall be deemed to have approved the plans, sections or specifications as submitted.

Maintenance

C1311

1

Sub-paragraph (2) applies where under this Act the nominated undertaker—

a

constructs a new highway, or

b

alters a highway, otherwise than by carrying out street works within the meaning of Part 3 of the New Roads and Street Works Act 1991 (c. 22).

2

Unless otherwise agreed between the nominated undertaker and the highway authority, the new or altered highway shall be maintained by and at the expense of the nominated undertaker for a period of 12 months from the later of—

a

the date of practical completion, and

b

the date on which it is first open for public use;

and after the end of that period shall be maintained by and at the expense of the highway authority.

3

Where in relation to a highway to which sub-paragraph (2) applies the highway authority is satisfied that the highway is practically complete or is open for public use, it shall, at the request of the nominated undertaker, certify to it in writing the date of practical completion of the highway or, as the case may be, the date on which it was first open for public use.

4

If the highway authority refuses a request to issue a certificate under sub-paragraph (3), or if the nominated undertaker disputes the date given in a certificate under that sub-paragraph, the matter shall, if the parties agree, be referred to arbitration, but shall otherwise be determined by the Secretary of State.

5

For the purposes of sub-paragraph (2), the date of practical completion of a highway, or the date on which it is first open for public use, shall be taken to be—

a

where the date has been determined under sub-paragraph (4), the date so determined, and

b

where it has not, the date certified under sub-paragraph (3).

6

Sub-paragraph (2) shall not have effect to impose any obligation in relation to—

a

the structure of any bridge carrying a highway over any railway of the nominated undertaker, or

b

the structure of any tunnel carrying a highway under any such railway.

7

Nothing in this paragraph shall prejudice the operation of section 87 of the New Roads and Street Works Act 1991 (c. 22).

12

Notwithstanding anything in section 46 of the Railways Clauses Consolidation Act 1845 (c. 20), as incorporated with this Act, the nominated undertaker shall not be liable to maintain the surface of any highway under or over which the scheduled works shall be constructed, or the immediate approaches to any such highway.

Bridges carrying highways

13

Each of sections 116 and 117 of the Transport Act 1968 (c. 73) (duties as respects bridges carrying highways over railways) shall apply as if the nominated undertaker were one of the boards mentioned in that section.

Agreements with highway authorities etc.

C1414

1

Where under this Schedule the nominated undertaker is authorised to stop up or interfere with an existing highway or part of an existing highway, it may enter into agreements with the persons having the charge, management or control of the highway concerning the construction (or contribution towards the expenses of construction) of—

a

any new highway to be provided in substitution,

b

any alteration of the existing highway, and

c

any other related matters.

2

The nominated undertaker may, by agreement with any such persons, delegate to them the power of constructing any such new highway or any such alteration of an existing highway, including any bridge over any railway, and, where the nominated undertaker is responsible for maintaining the new or altered highway (or bridge), the power to maintain it.

Use of subsoil

15

C151

The nominated undertaker may enter upon, take and use for the purposes of the works authorised by this Act so much of the subsoil of any highway within the limits of deviation for the scheduled works or within the limits of land to be acquired or used as shall be required for the purpose of the construction or maintenance of those works, without being required to acquire that subsoil or any interest in it.

2

The power conferred by sub-paragraph (1) shall not be exercisable in relation to the subsoil of a highway within the limits of land to be acquired or used, but outside the limits of deviation for the scheduled works, if the highway is comprised in land specified in the following table.

(1)

(2)

Area

No. on deposited plans

City of Westminster

30d, 38, 81, 85, 112, 115, 117, 120, 121, 213, 218, 340, 341, 416, 417, 419, 420, 423, 447, 448, 449, 453, 454, 455, 548, 549, 549a, 551, 566, 595, 598, 600, 666, 684, 685, 689, 690 and 691

London Borough of Camden

1, 3, 5, 7, 10, 11, 13, 30, 31, 32, 153, 154, 155, 279, 281, 282 and 283

London Borough of Islington

1, 3, 4, 13, 24, 25, 34, 90, 92, 93, 94, 95 and 99

City of London

1, 2, 3, 4, 7, 8, 9, 17, 18, 20, 34, 36, 52, 53, 55a, 71, 72, 73, 74, 80a, 81, 101, 102, 103, 108, 113, 115, 125, 136, 138, 143, 159, 160 and 161

London Borough of Tower Hamlets

224, 224a, 225, 225b, 227a, 250, 252, 252a, 252b, 269, 280, 281, 290, 293, 294, 391, 393, 396, 398, 664, 820, 988, 990, 991, 993, 1135, 1145, 1247c, 1295, 1412a, 1413a, 1421, 1421b, 1423a, 1445 and 1446

London Borough of Newham

8, 76, 155, 164, 189, 193, 205, 206, 258, 259, 260, 278, 288, 366, 379, 565, 619 and 670

London Borough of Greenwich

3, 5, 15, 31e, 35a, 100, 101, 104, 109, 125, 125a, 130, 138, 144, 155, 159, 164, 169, 173, 182, 187 and 227

London Borough of Bexley

28, 64 and 68

London Borough of Redbridge

26 and 41

London Borough of Barking & Dagenham

17 and 18

London Borough of Havering

2, 11, 12, 24, 105, 117, 120, 134, 138, 140, 149, 154, 164 and 194

Borough of Brentwood

24 and 52

District of Basildon

13 and 14

Borough of Slough

14, 20, 22, 23, 32, 53, 56, 60, 113, 162, 168 and 253a

London Borough of Hillingdon

97, 98, 115, 116 and 211b

London Borough of Ealing

9, 62, 62a, 88, 125, 144, 159, 160, 164, 177, 183 and 186

3

In the case of a highway comprised in land specified in the table in columns (1) and (2) of the table in paragraph 10 of Schedule 6, the power conferred by sub-paragraph (1) shall only be exercisable in relation to so much of the subsoil of the highway as falls within the description specified in relation to the land in column (3) of the table.

4

In the case of a highway comprised in land specified in the table in paragraph 11(1) of Schedule 6, the power conferred by sub-paragraph (1) shall only be exercisable in relation to so much of the subsoil of the highway as lies more than 9 metres beneath the level of the surface of the highway.

5

For the avoidance of doubt, it is hereby declared that the restrictions imposed by sub-paragraphs (2), (3) and (4) on the power conferred by sub-paragraph (1) do not affect the power conferred by paragraph 7(1).