xmlns:atom="http://www.w3.org/2005/Atom" xmlns:atom="http://www.w3.org/2005/Atom"
Modifications etc. (not altering text)
C1Sch. 7 modified (9.6.2009) by Nottingham Express Transit System Order 2009 (S.I. 2009/1300), arts. 1, 50(6)(b) (with Sch. 13 para. 14(2), Sch. 14 para. 19)
C2Sch. 7 modified (21.4.2011) by The Network Rail (Hitchin (Cambridge Junction)) Order 2011 (S.I. 2011/1072), arts. 1, 37(4)(b)
C3Sch. 7 modified (6.11.2013) by The Transport for Greater Manchester (Light Rapid Transit System) (Second City Crossing) Order 2013 (S.I. 2013/2587), arts. 1, 41(6) (with arts. 42, 43)
C4Sch. 7 applied (18.9.2014) by The A556 (Knutsford to Bowdon Improvement) Development Consent Order 2014 (S.I. 2014/2269), arts. 1, 37(6)(b)
C5Sch. 7 modified (24.9.2014) by The Thames Water Utilities Limited (Thames Tideway Tunnel) Order 2014 (S.I. 2014/2384), arts. 1, 18(4)(b)
C6Sch. 7 modified (22.12.2017) by The M20 Junction 10a Development Consent Order 2017 (S.I. 2017/1202), arts. 1, 47(6)(b) (with arts. 4, 37)
C7Sch. 7 modified (3.10.2018) by The A19/A184 Testos Junction Alteration Development Consent Order 2018 (S.I. 2018/994), arts. 1, 16(6)(b) (with arts. 3(3), 5)
C8Sch. 7 modified (3.4.2019) by The Millbrook Gas Fired Generating Station Order 2019 (S.I. 2019/578), arts. 1, 15(3)
C9Sch. 7 modified (10.10.2019) by The Abergelli Power Gas Fired Generating Station Order 2019 (S.I. 2019/1268), arts. 1, 15(3)
C10Sch. 7 modified (25.10.2019) by The Drax Power (Generating Stations) Order 2019 (S.I. 2019/1315), arts. 1, 12(8)
C11Sch. 7 modified (27.2.2020) by The A30 Chiverton to Carland Cross Development Consent Order 2020 (S.I. 2020/121), arts. 1, 19(6)(b) (with art. 3(1))
C12Sch. 7 modified (6.8.2020) by The A19 Downhill Lane Junction Development Consent Order 2020 (S.I. 2020/746), arts. 1, 16(6)(b) (with art. 5)
C13Sch. 7 modified (29.10.2020) by The Southampton to London Pipeline Development Consent Order 2020 (S.I. 2020/1099), arts. 1, 16(4)(b) (with art. 32, Sch. 9 para. 36)
C14Sch. 7 modified (10.3.2022) by The Thurrock Flexible Generation Plant Development Consent Order 2022 (S.I. 2022/157), arts. 1, 15(7)(b) (with Sch. 8 Pt. 6 para. 19)
C15Sch. 7 modified (11.8.2022) by The Sizewell C (Nuclear Generating Station) Order 2022 (S.I. 2022/853), arts. 1, 24(5) (with arts. 62, 76, 87)
C16Sch. 7 modified (8.9.2022) by The A428 Black Cat to Caxton Gibbet Development Consent Order 2022 (S.I. 2022/934), arts. 1, 51(6)(b) (with arts. 23, 53, Sch. 9 para. 65)
C17Sch. 7 modified (3.11.2022) by The Network Rail (Huddersfield to Westtown (Dewsbury) Improvements) Order 2022 (S.I. 2022/1067), arts. 1, 49(6)(b) (with art. 46(2), Sch. 19 para. 61)
C18Sch. 7 modified (4.11.2022) by The A47/A11 Thickthorn Junction Development Consent Order 2022 (S.I. 2022/1070), arts. 1, 20(6)(b) (with arts. 4, 37, 52, Sch. 9 para. 82)
C19Sch. 7 modified (7.12.2022) by The A417 Missing Link Development Consent Order 2022 (S.I. 2022/1248), arts. 1, 19(6)(b) (with art. 4)
C20Sch. 7 modified (10.3.2023) by The A47 Wansford to Sutton Development Consent Order 2023 (S.I. 2023/218), arts. 1, 20(6)(b) (with arts. 4, 50)
C21Sch. 7 modified (18.7.2023) by The Longfield Solar Farm Order 2023 (S.I. 2023/734), arts. 1, 14(7)(c)
C22Sch. 7 modified (27.7.2023) by The Boston Alternative Energy Facility Order 2023 (S.I. 2023/778), arts. 1, 18(3) (with arts. 5, 53, Sch. 8 paras. 6, 64)
C23Sch. 7 modified (4.8.2023) by The A303 (Amesbury to Berwick Down) Development Consent Order 2023 (S.I. 2023/834), arts. 1, 48(9)(b) (with arts. 6(2), 18, Sch. 11 paras. 5, 30)
C24Sch. 7 modified (7.9.2023) by The A38 Derby Junctions Development Consent Order 2023 (S.I. 2023/923), arts. 1, 19(6) (with arts. 4, 45, Sch. 9 paras. 6, 46, 54(1))
C25Sch. 7 modified (9.2.2024) by The A12 Chelmsford to A120 Widening Development Consent Order 2024 (S.I. 2024/60), arts. 1, 23(6) (with arts. 4, 52, Sch. 11 paras. 6, 24, 39(1), 55(1), 84)
C26Sch. 7 modified (11.3.2024) by The Net Zero Teesside Order 2024 (S.I. 2024/174), arts. 1, 13(8), 16(3)(b) (with arts. 42, 43, Sch. 12 paras. 4, 5, 20, 35, 50, 51, 74, 91, 129, 135, 136, 177(3), 234, 345, 355, 356)
C27Sch. 7 modified (13.3.2024) by The Medworth Energy from Waste Combined Heat and Power Facility Order 2024 (S.I. 2024/230), arts. 1, 17(5) (with Sch. 11 paras. 5, 22, 37, 47, 82, 110)
C28Sch. 7 modified (28.3.2024) by The A66 Northern Trans-Pennine Development Consent Order 2024 (S.I. 2024/360), arts. 1, 42(7) (with arts. 18, 35, Sch. 9)
C29Sch. 7 modified (5.4.2024) by The National Grid (Yorkshire Green Energy Enablement Project) Development Consent Order 2024 (S.I. 2024/393), arts. 1, 45(4) (with art. 44, Sch. 15)
C30Sch. 7 modified (11.4.2024) by The HyNet Carbon Dioxide Pipeline Order 2024 (S.I. 2024/436), arts. 1(2), 19(4)(b) (with arts. 21, 41, Sch. 10)
3(1)In Greater London there is a parking contravention in relation to a vehicle if it is stationary in circumstances in which any of the offences listed below is committed.E+W
(2)The offences are—
(a)an offence under section 15 of the Greater London Council (General Powers) Act 1974 (c. xxiv) (parking on footways, verges, etc.);
(b)an offence under section 8, 11, 16(1) or 16C of the Road Traffic Regulation Act 1984 (contravention of certain traffic orders) of contravening—
(i)a prohibition or restriction on waiting of vehicles, or
(ii)provision relating to any of the matters mentioned in paragraph 7 or 8 of Schedule 1 to that Act (conditions for loading or unloading, or delivering or collecting);
(c)an offence under section 25(5) of the Road Traffic Regulation Act 1984 of contravening [F1paragraph 1 or 3 of Part 5 of Schedule 14 to the Traffic Signs Regulations and General Directions 2016 (S.I. 2016/362)] (prohibition on stopping vehicles on or near pedestrian crossings);
(d)an offence under section 35A(1) of the Road Traffic Regulation Act 1984 (contravention of orders relating to parking places provided under section 32 or 33 of that Act);
(e)an offence under section 61(5) of the Road Traffic Regulation Act 1984 (parking in loading areas);
(f)an offence under section 19 of the Road Traffic Act 1988 (c. 52) (parking of HGVs on verges, central reservations or footways);
(g)an offence under section 21 of the Road Traffic Act 1988 (offences relating to cycle tracks) of parking a vehicle wholly or partly on a cycle track;
[F2(h)an offence under section 36(1) of the Road Traffic Act 1988 (failure to comply with traffic sign) of failing to comply with a sign of the type referred to in—
(i)item 51 or 53 in the table in Part 2 of Schedule 14 to the Traffic Signs Regulations and General Directions 2016, where that sign is placed for the purposes of a signal-controlled crossing facility or a parallel crossing as defined by Schedule 1 to that Instrument; or
(ii)paragraph 1 of Part 6 of Schedule 7 to that Instrument (bus stop or bus stand clearway markings).]
(3)This paragraph does not apply to a contravention within paragraph 2 above (contraventions relating to parking places).
Textual Amendments
F1Words in Sch. 7 para. 3(2)(c) substituted (18.5.2018) by The Civil Enforcement of Traffic Contraventions (Consequential Amendments) (England) Regulations 2018 (S.I. 2018/488), regs. 1, 2(2)(a)
F2Sch. 7 para. 3(2)(h) substituted (18.5.2018) by The Civil Enforcement of Traffic Contraventions (Consequential Amendments) (England) Regulations 2018 (S.I. 2018/488), regs. 1, 2(2)(b)
Commencement Information
I1Sch. 7 para. 3 in force at 23.7.2007 for E. by S.I. 2007/2053, arts. 1(2), 2(1)(2)(b) (with art. 4) (as amended (17.3.2008) by S.I. 2008/757, art. 3)