xmlns:atom="http://www.w3.org/2005/Atom"

SCHEDULES

SCHEDULE 4Substituted and supplementary works in Sandwell, Walsall and Wolverhampton

Part IIDescription of further works and powers

In the Metropolitan Borough of Wolverhampton—

(i)

alter the kerbline on so much of the north-eastern side of Bilston Road, between its junctions with Cooper Street and Cullwick Street, as lies between the points marked J1 and J2 on the deposited plans;

(ii)

alter the kerbline and footway on so much of the south-western side of Bilston Road, between its junctions with Ettingshall Road and Cullwick Street, as lies between the points marked J3 and J4 on the deposited plans;

(iii)

set back the kerbline on the eastern side of Ettingshall Road, near its junction with Bilston Road and Dixon Street, between the points marked J3 and J5 on the deposited plans;

(iv)

set back the kerbline and footway on the western side of the junction of Dixon Street with Ettingshall Road between the points marked J6 and J7 on the deposited plans;

(v)

alter the kerbline and footway on the south-western side of Bilston Road and the north-western side of Dixon Street between the points marked J8 and J9 on the deposited plans;

(vi)

stop up so much of the footpath between Bilston Road and Pembroke Avenue as lies between the points marked J10 and J11 on the deposited plans.

In the Metropolitan Borough of Sandwell—

(b)

stop up and discontinue the spur road on the south-western side of Holyhead Road between the points marked L1 and L2 on the deposited plans.