Search Legislation

The Electricity and Gas (Energy Companies Obligation) Order 2012

Draft Legislation:

This is a draft item of legislation. This draft has since been made as a UK Statutory Instrument: The Electricity and Gas (Energy Companies Obligation) Order 2012 No. 3018

Notifications of qualifying actions and adjoining installations

This section has no associated Explanatory Memorandum

16.—(1) Subject to paragraph (4), a supplier, other than a new supplier, must, by the end of February 2013, notify the Administrator in writing of each qualifying action and adjoining installation completed in the period beginning with 1st October 2012 and ending with 31st January 2013.

(2) Subject to paragraph (4), a supplier must by the end of each relevant calendar month notify the Administrator in writing of each qualifying action and adjoining installation completed in the calendar month immediately prior to the calendar month in which the notification is required to be made in accordance with this paragraph.

(3) A notification under paragraph (1) or (2) must—

(a)identify which obligation the qualifying action or adjoining installation is intended to be credited against; and

(b)include, as appropriate, the carbon or cost saving for each qualifying action or adjoining installation.

(4) Paragraphs (1) and (2) do not apply to a qualifying action which the Administrator has notified to a supplier under article 14(3).

(5) A notification of an adjoining installation must include an identification of the areas A and B as defined in article 14(1).

(6) Subject to paragraph (8), a supplier must ensure that the carbon saving for a qualifying action or adjoining installation notified under paragraph (1) or (2) is calculated—

(a)by determining the saving in accordance with—

(i)the Standard Assessment Procedure; or

(ii)the Reduced Data Standard Assessment Procedure,

and reducing that saving by the relevant in-use factor; or

(b)in accordance with an appropriate methodology for calculating the savings approved by the Administrator under article 18.

(7) Subject to paragraph (8), a supplier must ensure that the cost saving for a heating qualifying action notified under paragraph (1) or (2) is calculated—

(a)except for the repair or replacement of a qualifying boiler, in accordance with—

(i)the Standard Assessment Procedure;

(ii)the Reduced Data Standard Assessment Procedure; or

(iii)an appropriate methodology for calculating the savings approved by the Administrator under article 18; or

(b)in the case of the repair or replacement of a qualifying boiler, in accordance with article 17.

(8) Where a qualifying action or adjoining installation is a glazing measure, a supplier must only calculate the carbon or cost saving which exceeds the saving which that measure would achieve if installed to the minimum standard required by, as applicable, Approved Document L1B (conservation of fuel and power in existing buildings) and the ISBN of which is 9781859463253(1) or the Domestic Technical Handbook (Section 6 - Energy)(2).

(9) Except where article 12(6) and article 14(3) applies, a qualifying action is completed when its installation is complete.

(10) A supplier may apply to the Administrator for a completed qualifying action or completed adjoining installation to be notified after the date required by paragraph (1) or (2).

(11) An application under paragraph (10) must provide details of why a supplier is seeking an extension of time to notify the completed qualifying action or adjoining installation

(12) The Administrator may extend the period for notifying a qualifying action or adjoining installation which has been completed for such period as it thinks fit provided that—

(a)the extension period sought is no longer than one month after the date notification is required under paragraph (1) or (2); and

(b)the reason for the application is one other than an administrative oversight on the part of the supplier.

(13) A notification under this article must include such information relating to a qualifying action as the Administrator may from time to require.

(14) In this article “relevant calendar month” means—

(a)a calendar month in the overall obligation period for the supplier (but excluding January and February 2013 if those months would otherwise form part of that period); and

(b)April 2015.

(1)

This Approved Document supports the Building and Approved Inspectors (Amendment) Regulations 2010 (S.I. 2010/719). Paragraphs 4.18 to 4.23 refer to the relevant standards for glazing. The document can be found at the following link: http://www.planningportal.gov.uk/uploads/br/BR_PDF_ADL1B_2010.pdf. A copy of the document can be obtained from Communities and Local Government Publications, Department for Communities and Local Government, Eland House, Bressenden Place, London, SW1E 5DU.

(2)

This document is produced by the Scottish Executive and came in to force on 1st May 2011. The document supports the Building (Scotland) Regulations 2004 (S.S.I. 2004/406). Standard 6.2 is relevant to glazing. The document can be found at: http://www.scotland.gov.uk/Topics/Built-Environment/Building/Building-standards/publications/pubtech/thb2011domenergy. A copy of the document can be inspected at the Department of Energy and Climate Change, 3 Whitehall Place, London SW1A 2AW.

Back to top

Options/Help

Print Options

Close

Legislation is available in different versions:

Latest Available (revised):The latest available updated version of the legislation incorporating changes made by subsequent legislation and applied by our editorial team. Changes we have not yet applied to the text, can be found in the ‘Changes to Legislation’ area.

Original (As Enacted or Made): The original version of the legislation as it stood when it was enacted or made. No changes have been applied to the text.

Close

Opening Options

Different options to open legislation in order to view more content on screen at once

Close

Draft Explanatory Memorandum

Draft Explanatory Memorandum sets out a brief statement of the purpose of a Draft Statutory Instrument and provides information about its policy objective and policy implications. They aim to make the Draft Statutory Instrument accessible to readers who are not legally qualified and accompany any Statutory Instrument or Draft Statutory Instrument laid before Parliament from June 2004 onwards.

Close

More Resources

Access essential accompanying documents and information for this legislation item from this tab. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as enacted version that was used for the print copy
  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • correction slips
  • links to related legislation and further information resources
Close

Impact Assessments

Impact Assessments generally accompany all UK Government interventions of a regulatory nature that affect the private sector, civil society organisations and public services. They apply regardless of whether the regulation originates from a domestic or international source and can accompany primary (Acts etc) and secondary legislation (SIs). An Impact Assessment allows those with an interest in the policy area to understand:

  • Why the government is proposing to intervene;
  • The main options the government is considering, and which one is preferred;
  • How and to what extent new policies may impact on them; and,
  • The estimated costs and benefits of proposed measures.
Close

More Resources

Use this menu to access essential accompanying documents and information for this legislation item. Dependent on the legislation item being viewed this may include:

  • the original print PDF of the as made version that was used for the print copy
  • correction slips

Click 'View More' or select 'More Resources' tab for additional information including:

  • lists of changes made by and/or affecting this legislation item
  • confers power and blanket amendment details
  • all formats of all associated documents
  • links to related legislation and further information resources