xmlns:atom="http://www.w3.org/2005/Atom"
3.—(1) The Authority may, in the lines and situations and upon the lands delineated on the deposited plan and within the limits of deviation shown on it, construct, operate and maintain the following works along with all necessary works and conveniences connected with them:
Work No. 1 – Demolition of any structures including slipways, plant, walls and fences together with associated infrastructure and other berthing structures in the area shown on the deposited plan.
Work No. 2 – Increase the height of existing quay wall located beneath the existing slipway in the area shown on the deposited plan to the height of the adjoining quay walls.
Work No. 3 – a service yard and storage area including a waste disposal area, a fuel header tank, telecommunications equipment and container storage area and stockpiling area for cranes and other quayside infrastructure, to be created by infilling and re-levelling the area shown on the deposited plan to the level of the adjoining quayside.
Work No. 4 - Pontoons to be constructed in the north west corner of the inner harbour supported by piled foundations of steel connected to the quayside by linkspans and linked by walkways in the area shown on the deposited plan.
Work No. 5 – Associated security infrastructure within the limits of deviation.
Work No. 6 – Berth and associated harbour infrastructure including training ladders and cranes within the limits of deviation.
(2) So much of the bed of the harbour and of the foreshore as may be reclaimed for the purposes of paragraph (1) shall be deemed to be operational land within the meaning of section 215 of the Town and Country Planning (Scotland) Act 1997(1).