The Reservoirs (Scotland) Regulations 2016

PART 6CONSTRUCTION OR ALTERATION OF CONTROLLED RESERVOIRS

Notice of relevant works

26.  A notice of proposed relevant works by a reservoir manager under section 33(1) (notice to SEPA and appointment of construction engineer) of the Act must contain the information specified in Schedule 5.

Safety report

27.  A safety report by a construction engineer under section 34 (inspection, reports, supervision of works etc. by construction engineer) of the Act must—

(a)in addition to the matters required by section 35(1)(a) to (c) (safety reports) of the Act, include the other matters specified in the form (as read with the Note to the form) in Schedule 6; and

(b)be in the form set out in Schedule 6.

Safety measure certificate

28.  A safety measure certificate by a construction engineer under section 36(2) (safety reports: compliance) of the Act must be in the form set out in Schedule 7.

Preliminary certificate

29.  A preliminary certificate by a construction engineer under section 37 (preliminary certificates) of the Act must be in the form set out in Schedule 8.

Construction certificate

30.  A construction certificate by a construction engineer under section 38 (construction certificates) of the Act must—

(a)in addition to the information required by subsection (3)(a) and (b) of that section, contain the other information specified in the form (as read with the Note to the form) in Schedule 9; and

(b)be in the form set out in Schedule 9.

Final certificates

31.—(1) A final certificate by a construction engineer under section 39(1) (final certificates) of the Act must be in the form set out in Part 1 of Schedule 10.

(2) A final certificate by a construction engineer under section 39(3) (final certificates) of the Act must be in the form set out in Part 2 of Schedule 10.

(3) A final certificate by a construction engineer under section 39(5) (final certificates) of the Act must be in the form set out in Part 3 of Schedule 10.