xmlns:atom="http://www.w3.org/2005/Atom"

SCHEDULEIdentified Improvement Measures

2.  The improvement measures are—

(a)installing draught stripping to doors and windows;

(b)upgrading lighting controls;

(c)upgrading heating controls;

(d)installing an insulation jacket to a hot water tank;

(e)upgrading low energy lighting;

(f)installation of insulation in an accessible roof space; and

(g)replacement of a boiler.